AC-coupledF-19
Solar and battery each have their own inverter and meet on the building's AC wiring. Not the same as: DC-coupled
Across-the-line startalso: Direct-on-line startL-06 Starting a motor by switching it straight onto full voltage, which gives the largest starting surge.
An air agency permit that limits an engine's emissions and running hours; engines run only for emergencies and testing fall in a lighter category.
Alternating currentACF-05
Electricity that reverses direction many times a second; what the grid and buildings use. Not the same as: Direct current (DC)
The unit of electric current, often called an amp.
The protection that stops a source from energizing the utility's line after the utility side opens.
The burst of heat and light from an electrical fault through air; the heat that reaches a worker, called incident energy, is calculated with the IEEE 1584 guide.
AugmentationF-13
Adding battery blocks during a project's life to replace capacity lost to fade.
Authority having jurisdictionAHJF-33
The local officials who enforce codes, in the editions and with the amendments adopted locally, and approve the installation.
Auxiliary loadalso: Own useB-10 Power a battery system uses for its own cooling, heating, controls and safety systems; also called its own use.
The share of time, weighted by how much capacity works, that a system is ready to deliver, not counting excused events such as utility outages.
Backup generatorF-20
An engine generator that starts after an outage begins, so its loads see a break. Not the same as: Microgrid; uninterruptible power supply (UPS)
Battery energy held back for outages or a restart, which daily savings jobs may not use. Not the same as: Reserve (spare online power)
Ballasted roof systemS-02 Roof solar held down by weights rather than bolted through the roof.
Bankablealso: BankabilityB-15 Accepted by lenders and insurers on normal terms because the evidence, such as field history, test data, listings and a sound warranty, is in hand.
Battery management systemBMSF-17
The battery's own monitoring and protection electronics, which measure every cell, balance them, estimate charge and set limits. Not the same as: Energy management system (EMS)
Behind-the-meterBTMF-25
A system on the customer's side of the utility meter that earns by cutting that customer's bill and providing backup. Not the same as: Front-of-meter
Black startF-23
Restarting a site's power system from a dead bus, fully dark, without help from the grid.
A switch that opens automatically to stop current during a fault or overload; the utility breaker is where the site connects to the grid.
Carrying load for seconds to minutes until another source, usually a generator, takes over in the handoff.
British thermal unitBtuG-02 A unit of heat energy, about 3,412 per kWh; a gas generator's heat rate is the Btu of fuel it burns per kWh made.
C-ratealso: Hour rateF-09
Charge or discharge power divided by battery energy, so a 2-hour rate is 0.5C; charging power tapers near full, the slow finish.
Battery capacity lost with time alone, faster when hot and full, on top of cycle aging from use; late in life fade can speed up at a knee.
Capacity factorF-28
Yearly energy divided by what the system would make running at full rating every hour. Not the same as: Performance ratio
A controlled full discharge, repeated the same way each year, that measures delivered energy; retention is that result divided by the commissioning result.
The positive side of a battery cell; its material largely sets the cell's voltage, energy and life.
The smallest battery unit; cells are packaged into modules, wired into strings and set in racks.
Solar energy lost when the panels could produce more than the inverter can pass.
The combined peak of a group of buildings or loads divided by the sum of their own peaks; adding connected nameplates overstates the peak even more.
The extra load when power returns and heating, cooling, chillers and refrigeration all restart together.
Combined heat and powerCHPG-08 Making electricity on site and putting the engine's waste heat to use.
The tests that prove a finished system works as designed before handover, from first energization through site acceptance to an unattended run.
The sum of the nameplate ratings of everything wired in, whether or not it runs at once.
Equipment that needs to stay powered during an outage; its combined highest demand is the critical peak. Not the same as: Total facility load
The chain of tasks that sets the earliest finish date; any delay on it delays the project.
Deliberately cutting solar output because nothing can use or store it, common when solar is overbuilt.
CycleF-12
One full charge and discharge, or partial ones that add up to the same throughput; for alternating current, one full swing.
A small fuel tank beside the generator, refilled from the main tank; stored fuel needs polishing to stay usable.
DC-coupledF-19
Solar and battery share one inverter and meet on the DC side. Not the same as: AC-coupled
DC-to-DC converterDC/DCI-07 A device that changes one DC voltage to another, such as a battery's voltage to a shared DC line.
Solar panel rating divided by inverter rating; above 1.0 means the panels are oversized on purpose.
A logarithmic unit of sound level, where every 10 dB is ten times the sound power; A-weighted decibels (dBA) match human hearing.
Removing, transporting and recycling the system at end of life and restoring the site.
A fast burn of built-up flammable gas that can over-pressure an enclosure.
The slow yearly loss of solar panel output with age, after a 1–2% drop in the first months for older p-type panels; n-type panels fade more slowly.
Delivered energyF-07
The energy that actually reaches the load after aging, temperature, conversion losses and own use. Not the same as: Usable energy; nameplate energy
Demand chargeF-26
A monthly charge per kW on the highest short-interval demand, often 15 minutes; a ratchet can carry a high peak into later months. Not the same as: Energy charge
A utility or market program that pays a customer to cut or shift load when called.
A reduction from the label rating for heat, altitude or other site conditions, judged at the air inlet; what remains is the site rating.
Direct currentDCF-05
Electricity that flows one way only; what batteries and solar panels produce. Not the same as: Alternating current (AC)
The share of energy leaving the cells that arrives as building power after the inverter, about 0.92–0.96. Not the same as: Round-trip efficiency
The yearly rate that converts future dollars into today's dollars (present value); the hurdle rate is the lowest return an owner accepts.
Years until savings recover the cost after each year's cash is discounted to today's dollars.
The schedule deciding when each source and the battery run; off-grid systems either run engines hard and store the surplus or run them only as load needs.
A setting that makes a source push more power as frequency falls, so sources share load without messages; an isochronous source holds frequency fixed instead.
DurationF-08
How many hours a battery can run at its rated power: usable energy divided by rated power.
Electromagnetic transient studyEMTP-01 A detailed simulation of how voltage, current and frequency move in the first moments after an event, using the inverter makers' own models.
Emergency standby ratingG-05 A generator's highest kW label, for utility-outage backup only, limited to about 200 hours a year. Not the same as: Prime rating
The planned point where battery capacity has faded to its limit, commonly 70–80% of new; sizing to it takes about 1.5–1.8 times the energy needed.
Energy management systemEMSalso: Site controllerF-17
The site controller software that decides when a battery charges and discharges to save money or meet a schedule. Not the same as: Battery management system (BMS)
The warranted minimum share of starting energy the battery still holds in each year.
Energy useF-06
The total energy a site consumes over a period, in kWh. Not the same as: Peak demand (kW)
Venting or ventilation, designed from the cell maker's gas data, that keeps built-up battery gas from exploding inside an enclosure.
Power flowing from the site back onto the utility's lines.
Whether a site may send power to the grid: full export, export up to a set limit, or non-export.
Factory acceptance testQ-01 Testing a specific unit at the factory before it ships; a type test is done once on the model's design in a laboratory.
The current that flows into a short circuit, calculated for each operating mode in a short-circuit study, which breakers and relays need to detect and stop.
The earliest cost estimate, made before design starts, which carries the widest contingency; design then passes checkpoints at about 30%, 60% and 90%.
The utility line that carries power from a substation to a group of customers; its hosting limit is how much generation it can take without upgrades.
A clear walkway kept free of panels so firefighters can reach and work on the roof.
Fire protection engineerP-06 An engineer who designs fire detection, suppression such as water or clean-agent gas, and hazard controls.
The UL 9540A report showing how a cell failure spreads in the product; it reports behavior and is not a listing. Not the same as: Listing
Firm capacityF-22
Output you can count on when needed; solar and wind count as zero in an island plan.
The software built into a device such as an inverter or relay.
Panels mounted at one fixed angle, usually facing south, unlike single-axis trackers that turn east to west with the sun.
Load that can be turned down, delayed or shifted on known notice; it often rebounds when released.
An electrical system with no deliberate connection to earth, watched by an insulation monitor that warns when it starts leaking to ground.
The design flood level equipment is kept above, by raising it or with a berm, with stormwater drained away from the pad.
A battery that pumps liquid electrolyte, most often vanadium, from tanks through a stack, so the tanks set the hours and the stack sets the power.
Panels mounted close to the roof with little air behind them, so they run hotter than panels on an open rack.
How many times per second alternating current swings, in hertz (Hz); 60 Hz in North America, and it sags when load outruns supply.
A grid service in which a battery charges and discharges in seconds to keep grid frequency steady.
Front-of-meterFTMF-25
A system connected directly to the utility grid that earns from wholesale markets, capacity payments or utility contracts. Not the same as: Behind-the-meter
A device that turns fuel into electricity chemically without burning it; PEM cells run on hydrogen and respond fast, solid-oxide cells are efficient but slow.
A soils engineer's report on what the ground can carry; without one, the building code's cautious default soil value applies.
Grid-followingGFLF-18
An inverter that needs a steady voltage from another source and shuts off without it. Not the same as: Grid-forming
Ground-fault protectionP-03 A device that trips when current leaks to ground; it can trip falsely if neutral current takes the wrong path.
A lab test cell that pairs one electrode with pure sodium or lithium metal; it tests the material, and a full commercial cell usually keeps less. Not the same as: Full cell (a complete battery cell)
Hazard mitigation analysisP-06 A fire protection engineer's study of how a battery failure could unfold and how it is controlled, paired with a response plan for firefighters.
A regular signal proving a control link is alive; after a timeout without it, a device switches to its fallback.
Fuel heat burned per kilowatt-hour made, in Btu per kWh; lower is more efficient.
Higher heating valueHHV, LHVG-08 Fuel energy counted with the heat in the water vapor formed (HHV) or without it (LHV), and quoting on LHV makes the same gas machine look about 10% more efficient.
The usual unit for motor size; one horsepower is about 0.75 kW of output.
The height of a wind turbine's rotor center, where wind is measured; output then follows the certified power curve and the swept rotor area.
The minimum return an owner requires before approving a project.
One listed box with solar inputs, a battery port and an AC output, common in homes and small businesses.
The standard for how generation and storage behave on the distribution grid, with IEEE 1547.1 giving the tests that prove it.
A tax credit, grant or rebate that lowers a project's net cost; rules and eligibility change, so confirm current law.
The heat from an arc flash that reaches a worker at a set distance, in calories per square centimeter.
Independent engineeralso: Lender's engineerB-15 An engineering firm hired for the lenders to check a project's technology, contracts, tests and risks before money is lent. Not the same as: Owner's engineer (works for the owner)
Everything paid to build the system up to the utility connection, including soft costs such as engineering and permits; it grows more slowly than size. Not the same as: Levelized cost of storage
Institute of Electrical and Electronics EngineersIEEEP-04 The engineering body that publishes many electrical standards, such as IEEE 1547 and IEEE 1584.
InterconnectionF-32
The utility's process, queue and signed agreement for connecting on-site generation or storage to run in parallel with its grid.
A device or logic that blocks one action unless a safe condition is met, such as a door that cannot open while power is on.
Internal rate of returnIRRC-06 The discount rate at which a project's net present value is exactly zero.
The opposition to current inside a cell; it turns some power into heat and grows with age and cold.
International Fire CodeIFCP-06 The model fire code many U.S. jurisdictions adopt; its battery rules sit in Section 1207 and refer to NFPA 855.
The largest fault current a breaker or fuse can safely stop.
Meter readings taken every 15 minutes or so, rather than monthly totals.
InverterPCSalso: Power conversion systemF-16
The device that converts direct current to alternating current, and back for a battery; a battery inverter with its controls is also called a power conversion system (PCS).
The share of power going into an inverter that comes out converted, one direction only; weighted efficiency averages set load points. Not the same as: Round-trip efficiency
An emerging battery aimed at about 100 hours of storage, now at first pilots; round-trip efficiency and field life are still to be shown.
IslandingF-21
Disconnecting a site from the utility and running it on its own sources; the site is then an island.
Kilovolt-amperekVA, MVAF-04
The total electrical load wires and equipment have to carry, including the part that does no useful work; 1,000 kVA is one megavolt-ampere (MVA). Not the same as: Kilowatt (kW)
KilowattkWF-01
A rate of power: how fast energy is being delivered at a moment. Not the same as: Kilowatt-hour (kWh); kilovolt-ampere (kVA)
Kilowatt-hourkWhF-01
An amount of energy: one kilowatt delivered for one hour. Not the same as: Kilowatt (kW)
Layered oxidealso: Layered oxide cathodeB-16 A sodium-ion cathode in which sodium sits between sheets of metal oxide, often nickel, iron and manganese.
Time from order to delivery; long-lead items such as medium-voltage transformers often set the critical path, the chain of tasks that fixes the finish date.
A gas engine running on extra air for efficiency and low emissions, taking load in smaller steps than a rich-burn engine; both can run on natural gas or biogas.
Levelized cost of storageLCOSF-27
Lifetime cost divided by lifetime delivered energy, in today's dollars, as a price per kWh; levelized cost of energy does the same for a power system. Not the same as: Installed cost
A professional engineer licensed in the project's state who seals studies and drawings; the engineer of record takes responsibility for the design.
Life-safety loadalso: Code emergency loadsL-05 Equipment the codes require to keep people safe in an outage, such as exit lighting, fire alarms and fire pumps. Not the same as: Critical load
Cooling battery modules with circulating coolant rather than air, sized to the maker's heat-rejection data.
A recognized testing laboratory's certification of a product, published in its directory with ongoing factory inspection. Not the same as: Fire test report (a test report, not a listing)
Lithium iron phosphateLFPF-14
The most common battery chemistry for stationary storage: long life, lower energy per pound. Not the same as: Nickel manganese cobalt (NMC)
The family of rechargeable batteries that move lithium between electrodes; includes lithium iron phosphate and nickel manganese cobalt.
A portable bank of resistors that draws a set load so sources can be tested without real building load.
Average power divided by peak power over the same period; near 1.0 means a flat base load, low means short sharp peaks.
Switching off lower-priority loads, by plan or automatically when frequency falls, so the sources can carry the rest.
A block of load added to a source all at once, such as a transfer switch closing.
A priority group of loads kept on, shed or restored together; loads that can wait sit in the last tier.
The surge a motor draws while starting, typically 6–8 times its full-load running current; the nameplate code letter gives it as kVA per horsepower.
Long-duration storagealso: Long-duration energy storageB-17 Storage built to discharge for many hours to days, well beyond the few hours of most lithium-ion projects.
Controls that share a set power limit among vehicle chargers, including 50–350 kW fast chargers, so they do not all run at full power.
Distribution voltages above 1,000 volts, typically 4–35 kV.
MegawattMWF-03
A thousand kilowatts; a rate of power, not an amount of energy. Not the same as: Megawatt-hour (MWh)
Megawatt-hourMWhF-03
An amount of energy equal to 1,000 kilowatt-hours. Not the same as: Megawatt (MW)
Where energy is measured: battery terminals, inverter output, transformer or grid meter, each giving a different answer.
Meters per secondm/s, mphS-09 A wind speed unit; 1 m/s is about 2.24 miles per hour (mph).
MicrogridF-20
Local sources and loads controlled together that can run with the grid or on their own. Not the same as: Backup generator
Microgrid controllerF-17
The site-level controller that dispatches every source and runs islanding, load restoration and return to the grid. Not the same as: Energy management system (EMS)
A small gas turbine, about 30–1,000 kW, connected through power electronics.
One thousandth of a second.
Minimum loadingalso: Minimum loadG-03 The lowest share of rating a diesel should run at for long periods, about 30%, to avoid fouling.
Modified internal rate of returnMIRRC-06 A yearly return that assumes cash is reinvested at a stated rate instead of at the project's own return.
A packaged group of cells with its own monitoring board.
One more unit than the load needs, so any single unit can fail or be serviced; 2N means two complete systems, each able to carry everything.
Nameplate energyalso: NameplateF-07
The rated size on the equipment label; for a battery, its energy when new, before reserves, losses and aging. Not the same as: Usable energy; delivered energy
National Electrical CodeNECX-03 NFPA 70, the wiring rules for buildings and sites, enforced in the edition adopted locally.
National Fire Protection AssociationNFPAP-06 The body that publishes model fire codes and standards, including NFPA 855.
Net present valueNPVF-30
All future cash in and out converted to today's dollars at a discount rate and added up; above zero means the project adds wealth. Not the same as: Simple payback
Neutral-to-ground bondP-03 The single connection between the neutral, the return conductor, and the grounding system for each service or separately derived system; paralleled sources on a shared neutral share one.
NFPA 855F-31
The installation standard for stationary energy storage, enforced in the edition the local authority has adopted. Not the same as: UL 9540 (a product listing)
Nickel manganese cobaltNMCF-14
A lithium-ion chemistry with more energy per pound but shorter cycle life and lower heat tolerance. Not the same as: Lithium iron phosphate (LFP)
A local law setting maximum sound levels, often stricter at night.
Offtake contractalso: Offtake agreement, OfftakeB-15 The contract under which a buyer pays for a project's energy, capacity or service; it sets the performance the battery is held to.
A year, or a day in a given month, with solar output so low that nine in ten do better.
A simplified drawing of the electrical system showing sources, protection, transformers and meters, updated to as-built at closeout.
A transfer that breaks from one source before connecting the other, so loads go briefly dark; a closed transition connects first, for planned transfers only.
The rate, temperature, charge and cycle limits a battery warranty requires, inside which its energy retention promise holds.
One arrangement of running sources, such as grid-connected, battery only or generator only.
Operations and maintenanceO&MC-03 The yearly cost of running and servicing a system, including insurance and warranty.
Gradual load growth with no specific project behind it, expressed as a percentage a year.
How far above its continuous rating an inverter can run, and for how long.
A solar panel's label power, measured in bright laboratory sun at a cell temperature of 25 °C.
Peak demandF-06
The highest average power a site draws over a stated window, such as 15 minutes or 1 minute. Not the same as: Energy use (kWh over time)
Using a generator or battery to hold a site's demand below a target during its highest-use periods.
A value expressed as a fraction of its normal or rated value, so 0.85 per unit voltage is 85% of normal.
A simulation that knows every future load and price, so it overstates real savings; a realization haircut cuts results to about 70–90%.
Permission to operateP-07 The utility's written go-ahead to run in parallel with its grid, given after its review and any witness test it requires.
Polyanionalso: Polyanion cathode, Sodium iron phosphate, Sodium vanadium phosphateB-16 A sodium-ion cathode family built on a sturdy phosphate framework: long life, lower energy per kilogram.
Power factorF-04
The share of kilovolt-amperes that does useful work, kW divided by kVA; at unity power factor the two are equal.
Pre-application reportX-01 An optional early utility report on the feeder, its fault level and the generation already on it.
A future amount of money expressed in today's dollars at a stated discount rate.
Preventive maintenanceQ-05 Scheduled inspection, such as infrared scans for hot connections, and replacement done before something fails.
A generator's kW label for unlimited hours at varying load, about 10% below standby; the continuous rating is lower still, for constant full load. Not the same as: Emergency standby rating
Pickup currents and time delays that tell relays when to trip, stored in a settings file and grouped so a site can switch a whole set per operating mode.
Prussian blue analogalso: Prussian blue, Prussian whiteB-16 A sodium-ion cathode family with high capacity and fast rates, but limits in cycle life and packing density.
Reactive powerkvaralso: Kilovolt-ampere reactiveI-01 Power, in kvar, that flows back and forth to magnetize motors and transformers but does no useful work; it still uses inverter and generator capacity.
Dollars of constant buying power in a base year; nominal dollars include inflation, and the two are never mixed.
Reclosingalso: RecloseX-01 Closing a breaker again automatically shortly after a fault trips it, common on utility lines.
Yearly AC energy per kW of panel rating for a region, with normal losses included; sun hours express the same idea per day.
A protective device that measures current and voltage through sensors such as current transformers and tells a breaker when to open.
The share of a period's energy served by renewables, unlike the instantaneous solar share at one moment.
Spare online power held to cover a source loss or a sudden solar drop when a cloud passes. Not the same as: Backup reserve (stored energy)
Today's tested battery energy divided by the energy measured at commissioning.
The utility-grade meter used for billing at the grid connection; its accuracy class, such as 0.2, is its rated error in percent.
A rule that a source keeps running through a brief voltage or frequency disturbance.
A structured investigation of why a failure happened, starting from settings and records captured before anything is reset.
Round-trip efficiencyF-11
The share of energy put into a battery that comes back out, measured at a stated point. Not the same as: Inverter efficiency (one way only)
Small hydro with little or no pond, whose power follows the stream's flow and head, the vertical drop.
A pass-or-fail check, often run on a feeder section, that lets low-impact projects take the fast track; failing one leads to supplemental review, not refusal.
Seamless transferF-24
A sales term for a source change the loads should not notice; specify it as a maximum time outside a voltage band.
Unit of time; used here for how long a transfer or step takes.
The minimum distance code or zoning requires between equipment and a property line, building or other equipment, including clearance for service and fire.
One complete set of relay settings; a microgrid may switch between groups for each operating mode.
Short-circuit ratioalso: Grid strength ratioI-04 Grid strength at a connection point divided by the inverter rating there; below about 3 the grid counts as weak.
Simple paybackalso: PaybackF-30
Years of net savings needed to recover the installed cost, without discounting; discounted payback converts each year to today's dollars first. Not the same as: Net present value (NPV)
Site ratingalso: Site-derated ratingG-01 What a generator can actually deliver at the site's altitude and air temperature, after derating its label value.
Sodium chromium oxidealso: NaCrO2, Sodium chromiteB-16 A layered-oxide sodium-ion cathode built on chromium, with published half-cell cycling results but little public full-cell data as of late 2026.
A battery that works like lithium-ion but uses sodium; no lithium, nickel or cobalt, early in the market.
Sodium-sulfur batteryalso: Sodium-sulphur batteryB-17 A high-temperature sodium and sulfur battery, in commercial service since 2002 from one main maker.
Soft starteralso: Soft startI-03 An electronic device that raises a motor's voltage gradually to cut the starting surge; a wye-delta starter is a different reduced-voltage method.
Specific fuel consumptiongal/kWh, gal/hG-02 Fuel a generator burns per unit of energy, here gallons per kWh; gallons per hour is the burn rate at a given output.
Area; about 10.8 square feet in a square meter.
A utility charge for keeping grid capacity ready behind on-site generation; a departing-load charge bills load that leaves the grid.
Power an inverter uses while switched on but delivering nothing, much lower in sleep mode.
State of chargeSOCF-10
How full the battery is right now, as a percentage; the fuel gauge. Not the same as: State of health (SOH)
State of healthSOHalso: HealthF-10
How much capacity the battery has left compared with new, for example 0.85. Not the same as: State of charge (SOC)
A fast electronic switch with no moving parts that can separate a site from the grid in under a cycle.
Panels or battery cells wired in series so their voltages add, switched as one unit.
A licensed engineer who checks that roofs, slabs, footings and anchors can carry the equipment's weight plus snow, wind and earthquake loads.
Equipment data and drawings sent for review before purchase or build, often with a compliance matrix showing how each code provision is met.
Assemblies of breakers, switches and buses that distribute and protect power, gathered in a substation at larger sites.
Synchronizealso: ResynchronizationM-09 Matching voltage, frequency and timing of two sources before connecting them, as when an island rejoins the grid.
A utility study of how a project affects voltage, loading and protection; a facilities study then prices and schedules the upgrades.
The utility's rate schedule: energy, demand, time-of-use, standby and export charges.
A federal incentive that reduces the owner's tax bill by a share of project cost or per kWh produced; rules change, so confirm with tax counsel.
The remote data feed that shows what the system is doing, tuned so alarms do not flood operators.
Temperature coefficientS-07 How much panel power changes per degree of cell temperature, which runs 25–45 °C above the air in full sun.
The fraction of usable energy left when cells are colder than their preferred band, 1.0 when warm.
Thermal runawayF-15
A cell failure that heats itself, vents flammable gas and can spread to neighboring cells.
The total energy a battery charges or discharges, which warranties cap per year and for life, often as a number of full cycles.
A rate where energy costs more in some hours of the day than others.
Time-step simulationalso: Hour-by-hour simulation, Chronological dispatch simulationI-07 A computer model that steps through a year hour by hour or faster, tracking every energy flow; run carefully on each scenario, it gives the estimate lenders expect to review.
A switch that moves loads between the utility and a backup source; a four-pole switch also switches the neutral, a three-pole one leaves it connected.
A utility signal that trips a customer source when the utility breaker opens.
A laboratory test of a product design, done once for the model rather than for each unit.
UL 1741SBalso: UL 1741 Supplement SBP-05 The listing standard for inverters, now including the grid-support tests once published as Supplement SB.
The safety standard for battery modules and battery systems.
UL 9540F-31
The safety listing standard for a complete energy storage system. Not the same as: UL 9540A (a test method, not a listing)
UL 9540AF-31
A fire test method that reports how thermal runaway spreads; cited by edition because reports are edition-specific. Not the same as: UL 9540 (the listing)
The insurance specialist who decides whether a risk is covered and on what terms.
Underwriters LaboratoriesULalso: ULX-03 The safety-science organization that publishes product safety standards such as UL 9540 and UL 1741.
Uninterruptible power supplyUPSF-20
A battery-backed unit that keeps selected loads running with no break, usually for minutes. Not the same as: Backup generator
Usable energyF-07
The part of nameplate energy the controls allow you to use between the upper and lower charge limits. Not the same as: Nameplate energy; delivered energy
Usable windowalso: Usable SOC window, SOC windowB-01 The allowed charge range as a fraction of nameplate, for example 10% to 90% gives 0.80.
Value stackingF-29
Earning more than one kind of saving or revenue from the same battery.
Variable-frequency driveVFDalso: Variable frequency driveM-03 Electronics that run a motor at adjustable speed and start it gently, keeping the starting surge near normal current.
The unit of electrical pressure; buildings use 208, 480 or 600 volts, and a kilovolt (kV) is 1,000 volts.
Voltage dipalso: Voltage sagL-06 A brief drop in voltage, such as during a motor start; a device's hold-up time is how long it keeps running through one.
A battery building or large container with an inside aisle for service.
Watt-hours per kilogramWh/kgB-12 Energy stored per kilogram of cell or liquid; higher means lighter for the same energy.
The share of future replacement and augmentation cost charged to each kWh the battery delivers.
Unburned fuel and oil building up in a lightly loaded diesel's exhaust, which also stops newer engines cleaning their exhaust filters.
The regional market where plants and batteries sell energy and grid services; some owners instead lease a battery's control under a tolling agreement.
Field tests a utility watches before granting permission to operate.
Zinc-based batteryalso: Zinc battery, Zinc hybrid batteryB-17 A battery family built on zinc rather than lithium; one maker lists safety certifications for a stationary type, with little public fleet data.
Local land-use rules on what may be built where; a use not allowed by right needs a special use permit, usually with a hearing.