{
 "title": "Microgrids and DER Quick Reference",
 "edition": "Version 1.0",
 "license": "CC BY 4.0",
 "standards": [
  {
   "id": "STD-001",
   "designation": "IEEE 1547-2018",
   "title": "IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces",
   "issuing_org": "IEEE SA (SCC21)",
   "current_edition": "2018",
   "prior_editions_or_amendments": "1547-2003; 1547a-2014 (both superseded); amendment 1547a-2020; revision (P1547) under development, no ballot date found",
   "category": "Industry standard",
   "scope_summary": "Technical requirements for DER interconnection to distribution systems: ride-through, voltage and frequency response, grid support functions, interoperability, islanding, power quality.",
   "book_chapters": "18;21;22;30;36;43",
   "source_url": "https://sagroups.ieee.org/scc21/standards/1547rev",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Designation and 1547a-2020 confirmed on SCC21 page; IEEE SA page for base edition not opened. Applies at the DER point of connection/PCC, not transmission IBR (see 2800)."
  },
  {
   "id": "STD-002",
   "designation": "IEEE 1547a-2020",
   "title": "IEEE Standard for Interconnection and Interoperability of DER with Associated EPS Interfaces - Amendment 1: To Provide More Flexibility for Adoption of Abnormal Operating Performance Category III",
   "issuing_org": "IEEE SA (SCC21)",
   "current_edition": "2020",
   "prior_editions_or_amendments": "Amends 1547-2018",
   "category": "Industry standard",
   "scope_summary": "Amendment letting adopters choose abnormal operating performance Category III more flexibly (ride-through categories).",
   "book_chapters": "18;36;43",
   "source_url": "https://sagroups.ieee.org/scc21/standards/1547rev",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Amendment existence confirmed via SCC21 text; full IEEE title wording from memory. Cite together with 1547-2018."
  },
  {
   "id": "STD-003",
   "designation": "IEEE 1547.1-2020",
   "title": "IEEE Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces",
   "issuing_org": "IEEE SA (SCC21)",
   "current_edition": "2020 (published 2020-05-21)",
   "prior_editions_or_amendments": "1547.1-2005 (superseded); 1547.1a-2015 (superseded, folded into 1547.1-2020); P1547.1a amendment project listed (2027 date, status unconfirmed)",
   "category": "Test method",
   "scope_summary": "Type, production and commissioning test procedures demonstrating DER equipment conforms to IEEE 1547-2018; basis for UL 1741 SB testing.",
   "book_chapters": "42;43;46",
   "source_url": "https://standards.ieee.org/ieee/1547.1/6039/",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Active per IEEE SA. Do not cite 1547.1-2005 or 1547.1a-2015."
  },
  {
   "id": "STD-004",
   "designation": "IEEE 1547.2-2023",
   "title": "IEEE Application Guide for IEEE Std 1547 (title wording to confirm)",
   "issuing_org": "IEEE SA (SCC21)",
   "current_edition": "2023",
   "prior_editions_or_amendments": "1547.2-2008",
   "category": "Guide",
   "scope_summary": "Application guide explaining the technical background and use of IEEE 1547-2018 requirements.",
   "book_chapters": "36;43",
   "source_url": "https://sagroups.ieee.org/scc21/ieee-1547-series/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Existence and 2023 year seen in SCC21 series list; exact title and IEEE SA status page not verified."
  },
  {
   "id": "STD-005",
   "designation": "IEEE 1547.3-2023",
   "title": "IEEE Guide for Cybersecurity of Distributed Energy Resources Interconnected with Electric Power Systems",
   "issuing_org": "IEEE SA (SCC21)",
   "current_edition": "2023",
   "prior_editions_or_amendments": "1547.3-2007",
   "category": "Guide",
   "scope_summary": "Cybersecurity guidance for DER communications and interconnection.",
   "book_chapters": "31;43",
   "source_url": "https://sagroups.ieee.org/scc21/ieee-1547-series/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Year from SCC21 series list (Feb 2023); IEEE SA status page not opened."
  },
  {
   "id": "STD-006",
   "designation": "IEEE 1547.9-2022",
   "title": "IEEE Guide for Using IEEE Std 1547 for Interconnection of Energy Storage Distributed Energy Resources with Electric Power Systems",
   "issuing_org": "IEEE SA (SCC21)",
   "current_edition": "2022 (published 2022-08-05)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Shows how to apply IEEE 1547-2018 to energy storage DER, including charging behavior and non-battery storage.",
   "book_chapters": "15;17;36;43",
   "source_url": "https://standards.ieee.org/ieee/1547.9/10875",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Active per IEEE SA."
  },
  {
   "id": "STD-007",
   "designation": "IEEE 2030-2011",
   "title": "IEEE Guide for Smart Grid Interoperability of Energy Technology and Information Technology Operation with the EPS, End-Use Applications, and Loads",
   "issuing_org": "IEEE SA",
   "current_edition": "2011",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Smart grid interoperability reference model and architecture; parent of the 2030.x family.",
   "book_chapters": "29;31",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; verify edition/status before citing."
  },
  {
   "id": "STD-008",
   "designation": "IEEE 2030.2.1-2019 (and 2030.2-2015)",
   "title": "IEEE Guide for Design, Operation, and Maintenance of Battery Energy Storage Systems, both Stationary and Mobile, and Applications Integrated with Electric Power Systems (2030.2.1); IEEE Guide for the Interoperability of Energy Storage Systems Integrated with the Electric Power Infrastructure (2030.2)",
   "issuing_org": "IEEE SA",
   "current_edition": "2030.2.1-2019; 2030.2-2015",
   "prior_editions_or_amendments": "None known",
   "category": "Guide",
   "scope_summary": "Guides on interoperability of storage with the grid (2030.2) and BESS design, operation and maintenance (2030.2.1).",
   "book_chapters": "15;16;29;48",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge. The requested '2030.2' is two documents; confirm which the chapter means."
  },
  {
   "id": "STD-009",
   "designation": "IEEE 2030.3-2016",
   "title": "IEEE Standard Test Procedures for Electric Energy Storage Equipment and Systems for Electric Power Systems Applications",
   "issuing_org": "IEEE SA",
   "current_edition": "2016",
   "prior_editions_or_amendments": "None",
   "category": "Test method",
   "scope_summary": "Test procedures for electric energy storage equipment and systems for grid applications.",
   "book_chapters": "42;46;47",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; check for reaffirmation or revision."
  },
  {
   "id": "STD-010",
   "designation": "IEEE 2030.5-2023",
   "title": "IEEE Standard for Smart Energy Profile Application Protocol",
   "issuing_org": "IEEE SA",
   "current_edition": "2023 (board approval 2023-12-06; published 2024-12-11); Corrigendum 1-2024 rolled into base",
   "prior_editions_or_amendments": "2030.5-2018 (superseded); 2030.5-2013",
   "category": "Industry standard",
   "scope_summary": "Application-layer protocol for utility-to-DER and customer energy communications; the CSIP/Rule 21 default DER protocol.",
   "book_chapters": "29;31;43",
   "source_url": "https://standards.ieee.org/ieee/2030.5/11216/",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "2018 edition now SUPERSEDED. Rule 21 and CSIP text may still name the 2018 edition."
  },
  {
   "id": "STD-011",
   "designation": "IEEE 2030.5-2018",
   "title": "IEEE Standard for Smart Energy Profile Application Protocol",
   "issuing_org": "IEEE SA",
   "current_edition": "2018 (published 2018-12-21)",
   "prior_editions_or_amendments": "2030.5-2013",
   "category": "Industry standard",
   "scope_summary": "Previous edition of SEP 2.0 / 2030.5; retained only because tariffs and certifications still reference it.",
   "book_chapters": "29;31;43",
   "source_url": "https://standards.ieee.org/ieee/2030.5/5897",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "SUPERSEDED by 2030.5-2023. Cite only when quoting a tariff that names it."
  },
  {
   "id": "STD-012",
   "designation": "IEEE 2030.7-2017",
   "title": "IEEE Standard for the Specification of Microgrid Controllers",
   "issuing_org": "IEEE SA",
   "current_edition": "2017",
   "prior_editions_or_amendments": "Revision (2030.7-Rev) authorized 2025-03-27; 2017 edition shown to go inactive Dec 2027",
   "category": "Industry standard",
   "scope_summary": "Specifies microgrid controller functions: islanding, transitions, dispatch, steady-state operation at the PCC and within the microgrid, in a hierarchy of control layers.",
   "book_chapters": "21;22;29;32",
   "source_url": "https://standards.ieee.org/ieee/2030.7/5941",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Active. Revision in progress; watch for a new edition. Pair with 2030.8 for testing."
  },
  {
   "id": "STD-013",
   "designation": "IEEE 2030.8-2018",
   "title": "IEEE Standard for the Testing of Microgrid Controllers",
   "issuing_org": "IEEE SA",
   "current_edition": "2018",
   "prior_editions_or_amendments": "Revision project P2030.8, PAR approved 2026-03-26",
   "category": "Test method",
   "scope_summary": "Test procedures for verifying microgrid controller functions specified in 2030.7.",
   "book_chapters": "29;46;47",
   "source_url": "https://standards.ieee.org/ieee/2030.8/12543",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "2018 edition still the published one; revision is in PAR stage."
  },
  {
   "id": "STD-014",
   "designation": "IEEE 2030.9-2019",
   "title": "IEEE Recommended Practice for the Planning and Design of the Microgrid",
   "issuing_org": "IEEE SA",
   "current_edition": "2019",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "Planning and design process for microgrids: objectives, load and resource assessment, topology, protection and controls.",
   "book_chapters": "33;34;21",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; status not found in searches."
  },
  {
   "id": "STD-015",
   "designation": "IEEE 2030.10-2021",
   "title": "IEEE Standard for DC Microgrids for Rural and Remote Electricity Access Applications",
   "issuing_org": "IEEE SA",
   "current_edition": "2021",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Design and operating requirements for low-voltage DC microgrids serving rural and remote electrification.",
   "book_chapters": "19;21",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-016",
   "designation": "IEEE 2030.11-2021",
   "title": "IEEE Guide for Distributed Energy Resources Management Systems (DERMS) Functional Specification",
   "issuing_org": "IEEE SA",
   "current_edition": "2021",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Functional specification for DERMS that aggregate and coordinate DER at the utility or aggregator level.",
   "book_chapters": "29;40",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-017",
   "designation": "IEEE 2030.12-2025",
   "title": "IEEE Guide for the Design of Microgrid Protection Systems",
   "issuing_org": "IEEE SA (PES PSRC)",
   "current_edition": "2025 (published 2025-10-23)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Protection device selection and coordination for grid-connected and islanded microgrid modes and transitions; centralized/decentralized approaches.",
   "book_chapters": "26;28;22",
   "source_url": "https://standards.ieee.org/ieee/2030.12/7398",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Active per IEEE SA listing; publication date from reseller pages. Year is 2025, not earlier drafts (P2030.12)."
  },
  {
   "id": "STD-018",
   "designation": "IEEE 519-2022",
   "title": "IEEE Standard for Harmonic Control in Electric Power Systems",
   "issuing_org": "IEEE SA",
   "current_edition": "2022 (published 2022-08-05)",
   "prior_editions_or_amendments": "519-2014 (superseded); 519-1992",
   "category": "Recommended practice",
   "scope_summary": "Harmonic voltage and current limits at the point of common coupling and responsibilities of users and utilities.",
   "book_chapters": "3;17;36",
   "source_url": "https://standards.ieee.org/ieee/519/10677/",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Title says 'Standard', designation formerly 'Recommended Practice'. Cite 2022, not 2014."
  },
  {
   "id": "STD-019",
   "designation": "IEEE 2800-2022",
   "title": "IEEE Standard for Interconnection and Interoperability of Inverter-Based Resources (IBRs) Interconnecting with Associated Transmission Electric Power Systems",
   "issuing_org": "IEEE SA",
   "current_edition": "2022 (board approval Feb 2022)",
   "prior_editions_or_amendments": "Amendment project (grid-forming) PAR approved 2025-12-10, not published; title in new project reads Inverter/Converter-Based Resources",
   "category": "Industry standard",
   "scope_summary": "Minimum technical requirements for IBRs on transmission and sub-transmission systems: ride-through, active/reactive power control, negative-sequence current, protection.",
   "book_chapters": "18;26;36;43",
   "source_url": "https://standards.ieee.org/ieee/2800/10453/",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Not legally binding unless adopted by an operator or state. Do not confuse with 1547 (distribution)."
  },
  {
   "id": "STD-020",
   "designation": "IEEE 2800.2-2026",
   "title": "IEEE Recommended Practice for Test and Verification Procedures for Inverter-Based Resources Interconnecting with Bulk Power Systems",
   "issuing_org": "IEEE SA",
   "current_edition": "2026 (resellers show 2026-06-30)",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "Conformity-assessment procedures to verify plant-level IBR compliance with IEEE 2800.",
   "book_chapters": "43;46;47",
   "source_url": "https://standards.ieee.org/ieee/2800.2/10616",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA shows Active; 2026 date and release date taken from reseller listings only."
  },
  {
   "id": "STD-021",
   "designation": "IEEE 1584-2018",
   "title": "IEEE Guide for Performing Arc-Flash Hazard Calculations",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "2018 (published Nov 2018)",
   "prior_editions_or_amendments": "1584-2002 (superseded); companion 1584.2-2025 published 2025-09-19 (title not retrieved)",
   "category": "Guide",
   "scope_summary": "Models to calculate incident energy and arc-flash boundary, with electrode configurations and enclosure sizes.",
   "book_chapters": "28",
   "source_url": "https://standards.ieee.org/ieee/1584/5802",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Active; IAS sunset 2028. Cite 2018 equations, not 2002."
  },
  {
   "id": "STD-022",
   "designation": "IEEE 1584.1-2022",
   "title": "IEEE Guide for the Specification of Scope and Deliverables of an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "2022 (published 2022-07-12)",
   "prior_editions_or_amendments": "1584.1-2013 (superseded)",
   "category": "Guide",
   "scope_summary": "How to specify and procure an arc-flash study: scope, data, deliverables.",
   "book_chapters": "28;44;45",
   "source_url": "https://standards.ieee.org/ieee/1584.1/7468/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Dates confirmed; exact title wording from memory."
  },
  {
   "id": "STD-023",
   "designation": "IEEE 1159-2019",
   "title": "IEEE Recommended Practice for Monitoring Electric Power Quality",
   "issuing_org": "IEEE SA",
   "current_edition": "2019",
   "prior_editions_or_amendments": "1159-2009",
   "category": "Recommended practice",
   "scope_summary": "Power quality phenomena definitions and monitoring practices.",
   "book_chapters": "3;47",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-024",
   "designation": "IEEE 1453-2022",
   "title": "IEEE Recommended Practice for the Analysis of Fluctuating Installations on Power Systems (flicker)",
   "issuing_org": "IEEE SA",
   "current_edition": "2022 (to confirm)",
   "prior_editions_or_amendments": "1453-2015",
   "category": "Recommended practice",
   "scope_summary": "Voltage fluctuation and flicker assessment and limits.",
   "book_chapters": "3;36",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Year from knowledge."
  },
  {
   "id": "STD-025",
   "designation": "IEEE 1100",
   "title": "IEEE Recommended Practice for Powering and Grounding Electronic Equipment (Emerald Book)",
   "issuing_org": "IEEE SA",
   "current_edition": "2005 last known; confirm if withdrawn/revised",
   "prior_editions_or_amendments": "1100-1999",
   "category": "Recommended practice",
   "scope_summary": "Powering and grounding of sensitive electronic equipment.",
   "book_chapters": "3;27",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Status uncertain; verify before citing."
  },
  {
   "id": "STD-026",
   "designation": "IEEE 80-2013",
   "title": "IEEE Guide for Safety in AC Substation Grounding",
   "issuing_org": "IEEE SA",
   "current_edition": "2013 (corrected 2015)",
   "prior_editions_or_amendments": "80-2000",
   "category": "Guide",
   "scope_summary": "Ground grid design, touch and step voltage limits for AC substations.",
   "book_chapters": "27",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; a revision may be in progress."
  },
  {
   "id": "STD-027",
   "designation": "IEEE C37.2-2022",
   "title": "IEEE Standard for Electrical Power System Device Function Numbers, Acronyms, and Contact Designations",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2022",
   "prior_editions_or_amendments": "C37.2-2008 (superseded)",
   "category": "Industry standard",
   "scope_summary": "ANSI device numbers used on protection one-lines.",
   "book_chapters": "28;44",
   "source_url": "https://shop.standards.ie/en-ie/standards/ieee-c37-2-2022-572673_saig_ieee_ieee_3208479/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition confirmed via reseller only."
  },
  {
   "id": "STD-028",
   "designation": "IEEE C37.90",
   "title": "IEEE Standard for Relays and Relay Systems Associated with Electric Power Apparatus",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "Edition unconfirmed (2005 listed as withdrawn)",
   "prior_editions_or_amendments": "C37.90-2005",
   "category": "Industry standard",
   "scope_summary": "General requirements and ratings for protective relays.",
   "book_chapters": "28",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Search showed 2005 withdrawn; find current base edition."
  },
  {
   "id": "STD-029",
   "designation": "IEEE C37.90.1-2012",
   "title": "IEEE Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2012",
   "prior_editions_or_amendments": "C37.90.1-2002",
   "category": "Test method",
   "scope_summary": "Surge withstand capability tests for relays and relay systems.",
   "book_chapters": "28;46",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Edition from reseller listing only; check for newer edition."
  },
  {
   "id": "STD-030",
   "designation": "IEEE C37.010",
   "title": "IEEE Application Guide for AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2016 (to confirm)",
   "prior_editions_or_amendments": "C37.010-1999",
   "category": "Guide",
   "scope_summary": "Application of high-voltage breakers, short-circuit duty.",
   "book_chapters": "20;25",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-031",
   "designation": "IEEE C37.04",
   "title": "IEEE Standard for Ratings and Requirements for AC High-Voltage Circuit Breakers with Rated Maximum Voltage Above 1000 V",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2018 (to confirm)",
   "prior_editions_or_amendments": "C37.04-1999",
   "category": "Industry standard",
   "scope_summary": "Ratings and requirements for HV circuit breakers.",
   "book_chapters": "20;25",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-032",
   "designation": "IEEE C37.13",
   "title": "IEEE Standard for Low-Voltage AC Power Circuit Breakers Used in Enclosures",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2015 (to confirm)",
   "prior_editions_or_amendments": "C37.13-2008",
   "category": "Industry standard",
   "scope_summary": "Ratings and tests for LV power circuit breakers in switchgear.",
   "book_chapters": "20;25;28",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-033",
   "designation": "IEEE C37.20.1",
   "title": "IEEE Standard for Metal-Enclosed Low-Voltage (1000 V ac and below, 3200 V dc and below) Power Circuit Breaker Switchgear",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2015 base; amendment C37.20.1a-2020 (control and secondary circuits)",
   "prior_editions_or_amendments": "C37.20.1-2002",
   "category": "Industry standard",
   "scope_summary": "Ratings and tests for LV metal-enclosed switchgear.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Amendment seen in search; base edition not confirmed."
  },
  {
   "id": "STD-034",
   "designation": "IEEE C37.20.2",
   "title": "IEEE Standard for Metal-Clad Switchgear",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2015; newer edition (2022 or 2023) reported, conflicting",
   "prior_editions_or_amendments": "C37.20.2-1999",
   "category": "Industry standard",
   "scope_summary": "Metal-clad MV switchgear ratings and tests.",
   "book_chapters": "20",
   "source_url": "https://shop.standards.ie/en-ie/standards/ieee-c37-20-2-2015-571245_saig_ieee_ieee_1307335",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Sources conflict on new edition year; verify on IEEE SA."
  },
  {
   "id": "STD-035",
   "designation": "IEEE C37.20.3-2023",
   "title": "IEEE Standard for Metal-Enclosed Interrupter Switchgear Rated above 1 kV AC up to and Including 48.3 kV AC",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2023",
   "prior_editions_or_amendments": "C37.20.3-2013",
   "category": "Industry standard",
   "scope_summary": "Metal-enclosed interrupter switchgear ratings and tests.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition from reseller snippet."
  },
  {
   "id": "STD-036",
   "designation": "IEEE C37.100.1",
   "title": "IEEE Standard of Common Requirements for High-Voltage Power Switchgear Rated above 1000 V",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "2018 (to confirm)",
   "prior_editions_or_amendments": "C37.100.1-2007",
   "category": "Industry standard",
   "scope_summary": "Common requirements for HV switchgear.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-037",
   "designation": "IEEE C37.230",
   "title": "IEEE Guide for Protective Relay Applications to Distribution Lines",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2020 (to confirm)",
   "prior_editions_or_amendments": "C37.230-2007",
   "category": "Guide",
   "scope_summary": "Relay applications on distribution feeders.",
   "book_chapters": "28",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-038",
   "designation": "IEEE C37.233",
   "title": "IEEE Guide for Power System Protection Testing",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2009 (to confirm)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Testing of protection systems.",
   "book_chapters": "46",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-039",
   "designation": "IEEE C37.242",
   "title": "IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2013 (to confirm)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "PMU synchronization, calibration and installation.",
   "book_chapters": "31;47",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-040",
   "designation": "IEEE C37.95",
   "title": "IEEE Guide for Protective Relaying of Utility-Consumer Interconnections",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2014 (to confirm)",
   "prior_editions_or_amendments": "C37.95-2002",
   "category": "Guide",
   "scope_summary": "Relaying at utility-customer interconnections.",
   "book_chapters": "21;28;36",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-041",
   "designation": "IEEE C57.12.00-2021",
   "title": "IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers",
   "issuing_org": "IEEE SA (Transformers Committee)",
   "current_edition": "2021 (published 2021-11-09)",
   "prior_editions_or_amendments": "C57.12.00-2015 and -2010 (superseded)",
   "category": "Industry standard",
   "scope_summary": "General electrical and mechanical requirements for liquid-immersed transformers.",
   "book_chapters": "20",
   "source_url": "https://standards.ieee.org/ieee/C57.12.00/5268",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Search found no later edition."
  },
  {
   "id": "STD-042",
   "designation": "IEEE C57.12.90",
   "title": "IEEE Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers",
   "issuing_org": "IEEE SA (Transformers Committee)",
   "current_edition": "2021 (to confirm)",
   "prior_editions_or_amendments": "C57.12.90-2015",
   "category": "Test method",
   "scope_summary": "Factory test methods for liquid-immersed transformers.",
   "book_chapters": "20;46",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-043",
   "designation": "IEEE C57.110",
   "title": "IEEE Recommended Practice for Establishing Liquid-Immersed and Dry-Type Power and Distribution Transformer Capability when Supplying Nonsinusoidal Load Currents",
   "issuing_org": "IEEE SA (Transformers Committee)",
   "current_edition": "2018 (to confirm)",
   "prior_editions_or_amendments": "C57.110-2008",
   "category": "Recommended practice",
   "scope_summary": "Transformer derating for harmonic load currents.",
   "book_chapters": "3;20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-044",
   "designation": "IEEE C57.12.80",
   "title": "IEEE Standard Terminology for Power and Distribution Transformers",
   "issuing_org": "IEEE SA (Transformers Committee)",
   "current_edition": "2010 (to confirm)",
   "prior_editions_or_amendments": "C57.12.80-2002",
   "category": "Industry standard",
   "scope_summary": "Transformer terminology.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-045",
   "designation": "ANSI C84.1-2020",
   "title": "American National Standard for Electric Power Systems and Equipment - Voltage Ratings (60 Hertz)",
   "issuing_org": "NEMA / ANSI",
   "current_edition": "2020",
   "prior_editions_or_amendments": "C84.1-2016",
   "category": "Industry standard",
   "scope_summary": "Standard nominal voltages and service/utilization voltage ranges A and B.",
   "book_chapters": "2;30",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Published by NEMA, not IEEE. From knowledge."
  },
  {
   "id": "STD-046",
   "designation": "IEEE C62.41.1 / C62.41.2 (with C62.45)",
   "title": "IEEE Guide / Recommended Practice on the Surge Environment and Characterization of Surges in Low-Voltage AC Power Circuits",
   "issuing_org": "IEEE SA",
   "current_edition": "C62.41.1-2002; C62.41.2-2002; C62.45-2002 (editions unconfirmed)",
   "prior_editions_or_amendments": "C62.41-1991 (superseded)",
   "category": "Recommended practice",
   "scope_summary": "Surge environment and test waveforms for LV AC circuits.",
   "book_chapters": "3;20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; 'C62.41' alone is not a current designation."
  },
  {
   "id": "STD-047",
   "designation": "IEEE 3001 series",
   "title": "IEEE 3001.x - Recommended Practices for Industrial and Commercial Power System Design",
   "issuing_org": "IEEE SA (IAS ICPS)",
   "current_edition": "Per-part editions vary; confirm each",
   "prior_editions_or_amendments": "Replaces portions of the Color Books (141 Red, 241 Gray, 446 Orange per general sources; unconfirmed)",
   "category": "Recommended practice",
   "scope_summary": "Design of industrial and commercial power systems (distribution, lighting, etc.).",
   "book_chapters": "20;21",
   "source_url": "https://www.tdworld.com/safety-and-training/article/20957451/ieee-color-books-getting-a-21st-century-makeover",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Mapping is not confirmed per document. Cite the specific 3001.x number. See notes file."
  },
  {
   "id": "STD-048",
   "designation": "IEEE 3002 series",
   "title": "IEEE 3002.x - Recommended Practices for Industrial and Commercial Power System Analysis",
   "issuing_org": "IEEE SA (IAS ICPS)",
   "current_edition": "Per-part editions vary",
   "prior_editions_or_amendments": "Replaces Brown Book 399 and related analysis books (unconfirmed)",
   "category": "Recommended practice",
   "scope_summary": "Load flow, short-circuit, motor starting, harmonic and other analysis practices.",
   "book_chapters": "4;6;25",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Cite specific 3002.x part. Mapping from general knowledge."
  },
  {
   "id": "STD-049",
   "designation": "IEEE 3003 series",
   "title": "IEEE 3003.x - Recommended Practices for Industrial and Commercial Power System Grounding",
   "issuing_org": "IEEE SA (IAS ICPS)",
   "current_edition": "Per-part editions vary",
   "prior_editions_or_amendments": "Intended to replace Green Book 142 (unconfirmed)",
   "category": "Recommended practice",
   "scope_summary": "System and equipment grounding for industrial and commercial systems.",
   "book_chapters": "27",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Mapping not confirmed by search; verify."
  },
  {
   "id": "STD-050",
   "designation": "IEEE 3004 series",
   "title": "IEEE 3004.x - Recommended Practices for Industrial and Commercial Power System Protection and Coordination",
   "issuing_org": "IEEE SA (IAS ICPS)",
   "current_edition": "Per-part editions vary",
   "prior_editions_or_amendments": "Replaces Buff Book 242 and Blue Book 1015 (unconfirmed)",
   "category": "Recommended practice",
   "scope_summary": "Protection, coordination and breaker application.",
   "book_chapters": "28",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Not in the requested list but needed: the Buff Book successor."
  },
  {
   "id": "STD-051",
   "designation": "IEEE 3006 series",
   "title": "IEEE 3006.x - Recommended Practices for Industrial and Commercial Power System Reliability",
   "issuing_org": "IEEE SA (IAS ICPS)",
   "current_edition": "Per-part editions vary",
   "prior_editions_or_amendments": "Replaces Gold Book 493",
   "category": "Recommended practice",
   "scope_summary": "Reliability analysis, design and evaluation of existing systems.",
   "book_chapters": "35",
   "source_url": "https://www.tdworld.com/safety-and-training/article/20957451/ieee-color-books-getting-a-21st-century-makeover",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Gold Book to 3006 link supported by search snippets; part editions not verified."
  },
  {
   "id": "STD-052",
   "designation": "IEEE 3007 series",
   "title": "IEEE 3007.x - Recommended Practices for Industrial and Commercial Power System Operation, Maintenance and Safety",
   "issuing_org": "IEEE SA (IAS ICPS)",
   "current_edition": "Per-part editions vary",
   "prior_editions_or_amendments": "Replaces Yellow Book 902 and related maintenance books",
   "category": "Recommended practice",
   "scope_summary": "Operation, maintenance and electrical safety practices.",
   "book_chapters": "48;28",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Yellow Book to 3007 supported by search snippets; part editions not verified."
  },
  {
   "id": "STD-053",
   "designation": "IEEE Color Books 141, 142, 241, 242, 399, 446, 493, 1015",
   "title": "Red, Green, Gray, Buff, Brown, Orange, Gold, Blue Books",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "Last editions 1990s to 2000s",
   "prior_editions_or_amendments": "Superseded or being superseded by the 3000 series",
   "category": "Recommended practice",
   "scope_summary": "Legacy industrial and commercial power system books; do not cite as current.",
   "book_chapters": "20;25;27;28;35",
   "source_url": "https://standards.ieee.org/wp-content/uploads/import/documents/tocs/colorbks.pdf",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Legacy list; mapping to 3001-3007 incomplete. Check each book's IEEE SA status."
  },
  {
   "id": "STD-054",
   "designation": "IEEE 1686-2022",
   "title": "IEEE Standard for Intelligent Electronic Devices Cyber Security Capabilities",
   "issuing_org": "IEEE SA (PSIM)",
   "current_edition": "2022 (to confirm)",
   "prior_editions_or_amendments": "1686-2013",
   "category": "Industry standard",
   "scope_summary": "Cybersecurity capabilities IEDs must provide.",
   "book_chapters": "31",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-055",
   "designation": "IEEE 1815 (DNP3)",
   "title": "IEEE Standard for Electric Power Systems Communications - Distributed Network Protocol (DNP3)",
   "issuing_org": "IEEE SA (PSCC)",
   "current_edition": "1815-2012 (Inactive-Reserved per listing); revision reported near ballot May 2025; no 1815-2022 found",
   "prior_editions_or_amendments": "1815-2010",
   "category": "Industry standard",
   "scope_summary": "DNP3 protocol for SCADA/utility communications.",
   "book_chapters": "31",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "No '1815-2022' located. See also 1815.2-2025."
  },
  {
   "id": "STD-056",
   "designation": "IEEE 1815.2-2025",
   "title": "IEEE Standard for Distributed Network Protocol (DNP3) - DER profile (title wording unconfirmed)",
   "issuing_org": "IEEE SA (PSCC)",
   "current_edition": "2025 (publication date 2026-02-05 per listing)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "DNP3 profile for communicating with DER.",
   "book_chapters": "31;29",
   "source_url": "https://standards.ieee.org/ieee/1815.2/7731/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Active; full title not retrieved."
  },
  {
   "id": "STD-057",
   "designation": "California Electric Rule 21",
   "title": "Rule 21 Generating Facility Interconnection",
   "issuing_org": "CPUC / PG&E, SCE, SDG&E",
   "current_edition": "Continuously amended; revision not confirmed",
   "prior_editions_or_amendments": "Resolutions E-5000, E-5036 (IEEE 1547.1-2020 test regime, Phase 2/3)",
   "category": "Utility interconnection rule",
   "scope_summary": "California utility tariff governing DER interconnection, adopting IEEE 1547-2018 with UL 1741 SB and 2030.5/CSIP.",
   "book_chapters": "36;43;44",
   "source_url": "https://www.nrel.gov/grid/ieee-standard-1547/guide-to-updating-interconnection-rules",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Version/date not confirmed; cite the current tariff sheet. Per-utility tariffs."
  },
  {
   "id": "STD-058",
   "designation": "Hawaii Rule 14H",
   "title": "Hawaiian Electric Rule 14H Interconnection of Distributed Generating Systems",
   "issuing_org": "Hawaii PUC / Hawaiian Electric",
   "current_edition": "Version not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Utility interconnection rule",
   "scope_summary": "Hawaiian Electric Companies' DER interconnection tariff; early smart-inverter requirements.",
   "book_chapters": "36;43",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "No tariff page found; verify with HECO."
  },
  {
   "id": "STD-059",
   "designation": "New York Standardized Interconnection Requirements (SIR)",
   "title": "Standardized Interconnection Requirements and Application Process for New Distributed Generators",
   "issuing_org": "NY PSC / DPS",
   "current_edition": "Amended several times; storage up to 5 MW added Oct 2018; current version not confirmed",
   "prior_editions_or_amendments": "Orig. Dec 1999 (up to 300 kW)",
   "category": "Utility interconnection rule",
   "scope_summary": "New York statewide DER interconnection rules; utilities require IEEE 1547-2018 settings.",
   "book_chapters": "36;43;44",
   "source_url": "https://cleanenergyauthority.com/solar-rebates-and-incentives/new-york/interconnection-standards",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Version not confirmed; cite DPS current SIR."
  },
  {
   "id": "STD-060",
   "designation": "NFPA 70-2026",
   "title": "National Electrical Code",
   "issuing_org": "NFPA",
   "current_edition": "2026 (listed as published 2025-09-09)",
   "prior_editions_or_amendments": "70-2023, 70-2020",
   "category": "Adopted code (model code adopted by jurisdictions)",
   "scope_summary": "US model electrical installation code; Articles 480, 690, 691, 692, 705, 706, 710, 712 cover storage, PV, fuel cells, interconnected sources and microgrids.",
   "book_chapters": "41;44;20;27",
   "source_url": "https://shop.iccsafe.org/nfpa-70r-national-electrical-coder-necr-2026-edition.html",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "2026 NEC is the current published edition; 2026 date from reseller listing, not NFPA. Jurisdictions adopt different cycles (many on 2020/2023). 2026 adds Annex L preview of 2029 organization."
  },
  {
   "id": "STD-061",
   "designation": "NFPA 70E-2024",
   "title": "Standard for Electrical Safety in the Workplace",
   "issuing_org": "NFPA",
   "current_edition": "2024 (13th ed.)",
   "prior_editions_or_amendments": "70E-2021, 70E-2018",
   "category": "Industry standard",
   "scope_summary": "Electrical safety program, shock and arc-flash risk assessment, PPE and work practices for workers.",
   "book_chapters": "28;44;48",
   "source_url": "https://shop.standards.ie/en-ie/standards/nfpa-70e-2024-829298_saig_nfpa_nfpa_3290542/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition confirmed via reseller/IEEE event pages; issue date not confirmed. 2027 edition cycle not checked."
  },
  {
   "id": "STD-062",
   "designation": "NFPA 70B-2023",
   "title": "Standard for Electrical Equipment Maintenance",
   "issuing_org": "NFPA",
   "current_edition": "2023 (effective 2023-01-16)",
   "prior_editions_or_amendments": "70B-2019 and earlier were Recommended Practice",
   "category": "Industry standard",
   "scope_summary": "Electrical equipment maintenance program requirements; now a mandatory-language standard.",
   "book_chapters": "48;47",
   "source_url": "https://electricityforum.com/iep/electrical-test-equipment/nfpa-70b-2023",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Converted from Recommended Practice to Standard in 2023; 2026 edition development noted by NECA."
  },
  {
   "id": "STD-063",
   "designation": "NFPA 110-2025",
   "title": "Standard for Emergency and Standby Power Systems",
   "issuing_org": "NFPA",
   "current_edition": "2025",
   "prior_editions_or_amendments": "110-2022",
   "category": "Industry standard",
   "scope_summary": "Installation, performance, maintenance and testing of emergency and standby power systems (generators, ATS, fuel).",
   "book_chapters": "6;11;24;46",
   "source_url": "https://webstore.ansi.org/standards/nfpa/nfpa1102025",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "2025 edition confirmed by ANSI webstore listing; issue date unclear in sources. A TIA comment period was listed to 2026-10-14."
  },
  {
   "id": "STD-064",
   "designation": "NFPA 111-2025",
   "title": "Standard on Stored Electrical Energy Emergency and Standby Power Systems",
   "issuing_org": "NFPA",
   "current_edition": "2025 (per retailer listings)",
   "prior_editions_or_amendments": "111-2022",
   "category": "Industry standard",
   "scope_summary": "Battery and stored-energy emergency power systems (UPS-type) installation and testing.",
   "book_chapters": "16;23",
   "source_url": "https://www.fire-police-ems.com/NFPA111-2025.shtml",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition seen on retailer page only."
  },
  {
   "id": "STD-065",
   "designation": "NFPA 855-2026",
   "title": "Standard for the Installation of Stationary Energy Storage Systems",
   "issuing_org": "NFPA",
   "current_edition": "2026 (issued 2025-08-20; effective 2025-09-09 per Standards Council agenda); Errata 855-26-1 dated 2025-10-13",
   "prior_editions_or_amendments": "855-2023; 855-2020",
   "category": "Adopted code (model code adopted by jurisdictions)",
   "scope_summary": "Installation, hazard mitigation, spacing, fire protection, commissioning and decommissioning for stationary ESS; 2026 broadens hazard mitigation analysis and refers to fire/explosion test protocols.",
   "book_chapters": "16;41;44;45",
   "source_url": "https://shop.iccsafe.org/nfpa-855-2026-standard-for-the-installation-of-stationary-energy-storage-systems.html",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "2026 is current. IFC-2024 aligns with the 2023 edition; most jurisdictions still enforce 2020/2023. Dates from Council agenda are pre-action documents."
  },
  {
   "id": "STD-066",
   "designation": "NFPA 2-2023",
   "title": "Hydrogen Technologies Code",
   "issuing_org": "NFPA",
   "current_edition": "2023",
   "prior_editions_or_amendments": "2-2020",
   "category": "Adopted code (model code adopted by jurisdictions)",
   "scope_summary": "Generation, storage, piping and use of hydrogen; fuel cell and electrolyzer installations.",
   "book_chapters": "12;41",
   "source_url": "https://webstore.ansi.org/standards/nfpa/nfpa2023",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "2023 listed current in multiple sources; later cycle not checked."
  },
  {
   "id": "STD-067",
   "designation": "NFPA 37",
   "title": "Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines",
   "issuing_org": "NFPA",
   "current_edition": "2024 (published 2023-12-21; TIA 24-1 issued 2024-04-18); 2021 superseded; next edition 2027 in preparation",
   "prior_editions_or_amendments": "37-2021",
   "category": "Industry standard",
   "scope_summary": "Installation and fuel supply for stationary engines and turbines.",
   "book_chapters": "11;24",
   "source_url": "https://webstore.ansi.org/standards/nfpa/nfpa372024",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Pass 2 update: 2024 edition per reseller listings and an Iowa adoption rule; nfpa.org page not opened. IFC 2024 Ch. 6 controls if it conflicts."
  },
  {
   "id": "STD-068",
   "designation": "NFPA 1-2024",
   "title": "Fire Code",
   "issuing_org": "NFPA",
   "current_edition": "2024",
   "prior_editions_or_amendments": "1-2021",
   "category": "Adopted code (model code adopted by jurisdictions)",
   "scope_summary": "NFPA model fire code; ESS provisions refer to NFPA 855.",
   "book_chapters": "41;44",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition from state fire marshal list and NFPA documents; 2027 edition will reference 855-2026 per secondary source."
  },
  {
   "id": "STD-069",
   "designation": "NFPA 72-2025",
   "title": "National Fire Alarm and Signaling Code",
   "issuing_org": "NFPA",
   "current_edition": "2025",
   "prior_editions_or_amendments": "72-2022",
   "category": "Industry standard",
   "scope_summary": "Fire alarm and signaling design, relevant to ESS detection and notification.",
   "book_chapters": "16;44",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition from state fire marshal list and NFPA document; brief entry."
  },
  {
   "id": "STD-070",
   "designation": "ICC IFC-2024",
   "title": "International Fire Code (Section 1207 Electrical Energy Storage Systems)",
   "issuing_org": "ICC",
   "current_edition": "2024",
   "prior_editions_or_amendments": "IFC-2021; 2027 cycle in progress",
   "category": "Adopted code (model code adopted by jurisdictions)",
   "scope_summary": "Model fire code; 2024 ESS provisions aligned with NFPA 855-2023 thresholds, and refer to NFPA 855 for matters not covered.",
   "book_chapters": "16;41;44",
   "source_url": "https://www.sandia.gov/energystoragesafety/2024/05/07/nfpa-855-2023-edition/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "2027 IFC reportedly will streamline ESS and mandate NFPA 855; section numbering to confirm (2024 edition shows ESS in 1207 per Washington rulemaking)."
  },
  {
   "id": "STD-071",
   "designation": "ICC IBC-2024",
   "title": "International Building Code",
   "issuing_org": "ICC",
   "current_edition": "2024",
   "prior_editions_or_amendments": "IBC-2021",
   "category": "Adopted code (model code adopted by jurisdictions)",
   "scope_summary": "Model building code; occupancy and construction provisions affecting ESS rooms and enclosures.",
   "book_chapters": "41;44",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Not searched. 'Chapter 12 ESS provisions' in the brief belong to IFC, not IBC; verify."
  },
  {
   "id": "STD-072",
   "designation": "ANSI/CAN/UL 9540:2023",
   "title": "Energy Storage Systems and Equipment",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "3rd edition, 2023 (published 2023-06-28); revised Ed.3+R dated 2025-03-07, effective 2027-03-07 per Intertek notice",
   "prior_editions_or_amendments": "2nd ed. 2020 (withdrawn); 1st ed. 2016",
   "category": "Product certification standard",
   "scope_summary": "Safety certification of complete ESS (cells to enclosure, controls, thermal management, fire protection); references UL 1973, 1741, 9540A.",
   "book_chapters": "16;41;42",
   "source_url": "https://ulse.org/news/ulse-publishes-third-edition-ul-9540-energy-storage-systems-and-equipment",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "There is NO 4th edition of UL 9540; '4th edition' belongs to 9540A. Cite 3rd ed. 2023."
  },
  {
   "id": "STD-073",
   "designation": "ANSI/CAN/UL 9540A",
   "title": "Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage Systems",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "6th edition published 2026-03-13",
   "prior_editions_or_amendments": " effective 2027-01-01 per UL; 5th edition 2025 still in use during the transition",
   "category": "4th ed. 2019 (+revisions); 3rd ed. 2018",
   "scope_summary": "Test method",
   "book_chapters": "Cell, module, unit and installation-level tests of thermal runaway and fire propagation; data feed hazard mitigation analysis. 6th adds large-scale fire test at installation level.",
   "source_url": "16;42",
   "verification_status": "https://www.ul.com/offerings/ul-9540a-test-method",
   "verified_date": "partial",
   "notes": "2026-11-09",
   "null": [
    "Checked 2026-11-11 against UL and Intertek pages (standard text not read). UL states the 6th edition large-scale installation-level test has pass/fail criteria and the unit-level test is reserved for residential systems or active-prevention evaluation. Reports must name the edition tested. A test method",
    " not a listing standard."
   ]
  },
  {
   "id": "STD-074",
   "designation": "UL 9540B",
   "title": "Large-Scale Fire Test for Residential Battery Energy Storage Systems (Outline of Investigation)",
   "issuing_org": "UL Solutions",
   "current_edition": "Outline of Investigation announced 2024-06-28; consensus-standard status unconfirmed",
   "prior_editions_or_amendments": "None",
   "category": "Test method",
   "scope_summary": "Large-scale fire propagation test for residential ESS with ignition of vented gas; complements 9540A.",
   "book_chapters": "16;42",
   "source_url": "https://www.ul.com/news/ul-solutions-debuts-new-testing-protocol-help-advance-safety-residential-battery-energy",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Published as an Outline of Investigation, not an ANSI standard as of 2024 sources. Not a substitute for 9540A under IFC/NFPA 855."
  },
  {
   "id": "STD-075",
   "designation": "ANSI/CAN/UL 1741:2021",
   "title": "Standard for Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "3rd edition 2021-09-28, revised (Ed.3+R) 2023-05-19 incorporating Supplement SB; a 2026 revision (ANSI webstore: adds Supplement SC for bidirectional EV supply equipment; sources differ on its date, May or August 2026); later 2025 Intertek notice effective 2027-10-22",
   "prior_editions_or_amendments": "2nd ed. 2010 + Supplement SA; Ed.3 2021",
   "category": "Product certification standard",
   "scope_summary": "Certifies inverters and interconnection equipment; SB tests conformance to IEEE 1547-2018 via 1547.1-2020.",
   "book_chapters": "17;18;42;43",
   "source_url": "https://webstore.ansi.org/standards/ul/ul1741ed2021",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "No Edition 4 found. SB is now folded into the base 3rd edition. SA is legacy (Rule 21 Phase 1 / HI)."
  },
  {
   "id": "STD-076",
   "designation": "ANSI/CAN/UL 1973:2022",
   "title": "Batteries for Use in Stationary and Motive Auxiliary Power Applications",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "3rd edition, 2022-02-25; 2024 revision (Ed.3+R) added items",
   "prior_editions_or_amendments": "2nd ed. 2018",
   "category": "Product certification standard",
   "scope_summary": "Safety and performance of stationary battery systems and modules (abuse, thermal, electrical).",
   "book_chapters": "13;14;16;42",
   "source_url": "https://shop.standards.ie/en-ie/standards/ul-1973-3ed-2022-02-1070573_saig_ul_ul_3116406",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Singapore SS UL 1973:2026 is a national adoption of the 2022 content, not a new UL edition."
  },
  {
   "id": "STD-077",
   "designation": "UL 1642",
   "title": "Lithium Batteries",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "5th edition 2012 (latest seen; possible later revisions)",
   "prior_editions_or_amendments": "4th ed.",
   "category": "Product certification standard",
   "scope_summary": "Safety of lithium cells.",
   "book_chapters": "13;16;42",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Search only gave 2012; verify."
  },
  {
   "id": "STD-078",
   "designation": "UL 2580",
   "title": "Batteries for Use in Electric Vehicles",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "3rd edition (2020, to confirm)",
   "prior_editions_or_amendments": "2nd ed. 2013",
   "category": "Product certification standard",
   "scope_summary": "Safety of EV traction batteries, used for second-life evaluation.",
   "book_chapters": "13;8;16",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; no edition data found."
  },
  {
   "id": "STD-079",
   "designation": "UL 62109-1",
   "title": "Safety of Power Converters for Use in Photovoltaic Power Systems - Part 1: General Requirements",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "1st ed. 2014; a newer edition reportedly published (not confirmed)",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "Safety requirements for PV and storage power converters.",
   "book_chapters": "9;17",
   "source_url": "https://incompliancemag.com/ul-62109-1/",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Search hit an InCompliance article without edition details; verify."
  },
  {
   "id": "STD-080",
   "designation": "UL 1778",
   "title": "Uninterruptible Power Systems",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "5th edition 2014 (Ed.5+R 2023-04-28)",
   "prior_editions_or_amendments": "4th ed. 2005",
   "category": "Product certification standard",
   "scope_summary": "Safety of UPS equipment.",
   "book_chapters": "17;24",
   "source_url": "https://w3inte.intertek.co.th/siteassets/resources/sun/2023/ul-1778-csa-c22-2-no-107-3-sun-rev-4-28-2023-ed-4-28-2025.pdf",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "No 6th edition found."
  },
  {
   "id": "STD-081",
   "designation": "UL 891",
   "title": "Switchboards",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "12th edition 2019-07-19, revised 2025-03-21 (Ed.12+R); effective 2027-03-21",
   "prior_editions_or_amendments": "UL 891-2005",
   "category": "Product certification standard",
   "scope_summary": "Dead-front switchboards up to 1000 V.",
   "book_chapters": "20",
   "source_url": "https://webstore.ansi.org/standards/ul/ul891ed122019",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Pass 2 update: trinational with CSA C22.2 No. 244 and NMX-J-118/2-ANCE. Intertek notice; UL page not opened."
  },
  {
   "id": "STD-082",
   "designation": "UL 1558",
   "title": "Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "2025-04-02 (listing)",
   "prior_editions_or_amendments": "UL 1558:2018 (unconfirmed)",
   "category": "Product certification standard",
   "scope_summary": "LV power circuit breaker switchgear.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition date from listing snippet only."
  },
  {
   "id": "STD-083",
   "designation": "UL 489",
   "title": "Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "2016 (listing); newer revision possible",
   "prior_editions_or_amendments": "UL 489-2013",
   "category": "Product certification standard",
   "scope_summary": "MCCB, including DC-rated devices.",
   "book_chapters": "20;28",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition date from a listing; a Sept 2025 notice exists."
  },
  {
   "id": "STD-084",
   "designation": "ANSI/CAN/UL 3741",
   "title": "Photovoltaic Hazard Control",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "1st edition 2020 (published 2020-12-08); revision 2025-10-20 (effective 2027-10-20)",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "Safety of PV hazard control systems (rapid shutdown) as a system.",
   "book_chapters": "9;44",
   "source_url": "https://scc-ccn.ca/standardsdb/standards/4030805",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Still first edition."
  },
  {
   "id": "STD-085",
   "designation": "UL 2703",
   "title": "Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "1st edition 2015-01-28 with revisions (16 Dec 2019; 11 Jun 2025); ANSI store lists 2026 publication",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "PV racking, grounding and bonding.",
   "book_chapters": "9",
   "source_url": "https://webstore.ansi.org/standards/ansi/ul2703ed20152026",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Pass 2 update: no separate 2023 edition exists; cite Ed.1 plus revision date."
  },
  {
   "id": "STD-086",
   "designation": "UL 62133-2",
   "title": "Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes - Safety Requirements for Portable Sealed Secondary Cells... Part 2: Lithium Systems",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "Portable lithium cell safety (IEC 62133-2 based).",
   "book_chapters": "13",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-087",
   "designation": "ANSI/UL 1699B",
   "title": "Photovoltaic (PV) DC Arc-Fault Circuit Protection",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "1st edition 2018 (listing shows published 2024-07-09, likely revision)",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "DC arc-fault protection for PV circuits.",
   "book_chapters": "9;20",
   "source_url": "https://webstore.ansi.org/standards/ul/ul1699bed2018",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition number 1; 2024 date probably a revision date."
  },
  {
   "id": "STD-088",
   "designation": "UL 1974",
   "title": "Evaluation for Repurposing Batteries",
   "issuing_org": "UL Standards & Engagement",
   "current_edition": "2nd edition, ANSI/CAN/UL 1974:2023 (published 2023-11-09/10); title now Evaluation for Repurposing or Remanufacturing Batteries",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "Evaluation of second-life batteries.",
   "book_chapters": "13;14",
   "source_url": "https://scc-ccn.ca/standardsdb/standards/4032178",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Pass 2 update: SCC and UL announcement; earlier ANSI/CAN/UL 1974 withdrawn."
  },
  {
   "id": "STD-089",
   "designation": "IEC 62933-5-2:2025",
   "title": "Electrical Energy Storage (EES) Systems - Part 5-2: Safety Requirements for Grid-Integrated EES Systems - Electrochemical-Based Systems",
   "issuing_org": "IEC TC 120",
   "current_edition": "Edition 2, 2025 (published 2025-12-08)",
   "prior_editions_or_amendments": "Edition 1, 2020 (superseded); BS EN IEC 62933-5-2:2024 national adoption",
   "category": "Industry standard",
   "scope_summary": "Safety requirements for grid-connected electrochemical storage over the system life cycle.",
   "book_chapters": "16;42",
   "source_url": "https://scc-ccn.ca/standardsdb/standards/2058039",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Ed. 2 replaces 2020. Check which edition a national adoption cites."
  },
  {
   "id": "STD-090",
   "designation": "IEC 62933-5-1",
   "title": "EES Systems - Part 5-1: Safety Considerations for Grid-Integrated EES Systems - General Specification",
   "issuing_org": "IEC TC 120",
   "current_edition": "2017 (+ amendment; to confirm)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "General safety considerations for grid EES.",
   "book_chapters": "16;42",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-091",
   "designation": "IEC 62933-2-1",
   "title": "EES Systems - Part 2-1: Unit Parameters and Testing Methods - General Specification",
   "issuing_org": "IEC TC 120",
   "current_edition": "2017 (to confirm)",
   "prior_editions_or_amendments": "None",
   "category": "Test method",
   "scope_summary": "Unit parameters and test methods for EES.",
   "book_chapters": "13;42;47",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-092",
   "designation": "IEC 62619",
   "title": "Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes - Safety Requirements for Secondary Lithium Cells and Batteries for Use in Industrial Applications",
   "issuing_org": "IEC TC 21",
   "current_edition": "Edition 2, 2022",
   "prior_editions_or_amendments": "Edition 1, 2017",
   "category": "Industry standard",
   "scope_summary": "Safety tests for industrial lithium cells and batteries.",
   "book_chapters": "13;16;42",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Ed. 2:2022 seen on a distributor ranking page only."
  },
  {
   "id": "STD-093",
   "designation": "IEC 62620",
   "title": "Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes - Large Format Secondary Lithium Cells and Batteries for Use in Industrial Applications",
   "issuing_org": "IEC TC 21",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "2014 ed. 1 (from knowledge)",
   "category": "Industry standard",
   "scope_summary": "Performance of large format industrial lithium cells.",
   "book_chapters": "13",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "No data found in searches."
  },
  {
   "id": "STD-094",
   "designation": "IEC 62477-1:2022",
   "title": "Safety Requirements for Power Electronic Converter Systems and Equipment - Part 1: General",
   "issuing_org": "IEC TC 22",
   "current_edition": "Edition 2.0, 2022 (May); EN IEC 62477-1:2023/2024 European versions",
   "prior_editions_or_amendments": "Edition 1, 2012 (+AMD1:2016)",
   "category": "Industry standard",
   "scope_summary": "General safety requirements for power electronic converter systems up to 35 kV AC / 1.5 kV DC.",
   "book_chapters": "17",
   "source_url": "https://standards.iteh.ai/catalog/standards/iec/da24595c-4636-42a7-8142-21708c488b49/iec-62477-1-2022",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": ""
  },
  {
   "id": "STD-095",
   "designation": "IEC 61850 series",
   "title": "Communication Networks and Systems for Power Utility Automation",
   "issuing_org": "IEC TC 57",
   "current_edition": "Multi-part, parts versioned separately (e.g. 61850-7-420 for DER)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Substation and DER communications models and protocols.",
   "book_chapters": "31;29",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Cite part and edition. From knowledge."
  },
  {
   "id": "STD-096",
   "designation": "IEC TR 61850-90-7",
   "title": "Object Models for Power Converters in Distributed Energy Resources (DER) Systems",
   "issuing_org": "IEC TC 57",
   "current_edition": "2013 (technical report)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "DER inverter object models and functions.",
   "book_chapters": "31;18",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-097",
   "designation": "IEC 61400-1",
   "title": "Wind Energy Generation Systems - Part 1: Design Requirements",
   "issuing_org": "IEC TC 88",
   "current_edition": "Edition 4, 2019",
   "prior_editions_or_amendments": "Edition 3, 2005 + AMD1:2010",
   "category": "Industry standard",
   "scope_summary": "Design requirements for wind turbines.",
   "book_chapters": "10",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-098",
   "designation": "IEC 61400-12-1",
   "title": "Wind Energy Generation Systems - Part 12-1: Power Performance Measurements of Electricity Producing Wind Turbines",
   "issuing_org": "IEC TC 88",
   "current_edition": "Edition 3, 2022 (published 2022-09-05; Cor. 1 of 2025-05 included)",
   "prior_editions_or_amendments": "Edition 2, 2017; Edition 1, 2005. Ed. 3 cancels and replaces 61400-12-1:2017 and 61400-12-2:2013; Ed. 4 in development",
   "category": "Test method",
   "scope_summary": "Power curve measurement of wind turbines.",
   "book_chapters": "10;47",
   "source_url": "https://webstore.iec.ch/publication/68499",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Pass 2 correction: prior register entry \"Edition 2, 2022\" was wrong (Ed. 2 = 2017, Ed. 3 = 2022). IEC webstore. Small-wind procedure now inside this part."
  },
  {
   "id": "STD-099",
   "designation": "IEC 61724-1",
   "title": "Photovoltaic System Performance - Part 1: Monitoring",
   "issuing_org": "IEC TC 82",
   "current_edition": "Edition 2, 2021 (to confirm)",
   "prior_editions_or_amendments": "Edition 1, 2017",
   "category": "Test method",
   "scope_summary": "Monitoring classes (A/B/C) and PV performance metrics.",
   "book_chapters": "9;47",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-100",
   "designation": "IEC 60909-0",
   "title": "Short-Circuit Currents in Three-Phase AC Systems - Part 0: Calculation of Currents",
   "issuing_org": "IEC TC 73",
   "current_edition": "Edition 2, 2016 (to confirm)",
   "prior_editions_or_amendments": "Edition 1, 2001",
   "category": "Industry standard",
   "scope_summary": "Calculation method for short-circuit currents; basis for IEC fault levels.",
   "book_chapters": "25;26",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; note IEC 60909 inverter-source guidance limited."
  },
  {
   "id": "STD-101",
   "designation": "IEC 60076 series",
   "title": "Power Transformers",
   "issuing_org": "IEC TC 14",
   "current_edition": "Parts versioned separately (e.g. 60076-1:2011)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Power transformer requirements and tests.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Cite part and edition."
  },
  {
   "id": "STD-102",
   "designation": "IEC 62040-3",
   "title": "Uninterruptible Power Systems (UPS) - Part 3: Method of Specifying the Performance and Test Requirements",
   "issuing_org": "IEC SC 22H",
   "current_edition": "Edition 3.0, 2021",
   "prior_editions_or_amendments": "Edition 2, 2011",
   "category": "Test method",
   "scope_summary": "UPS performance classification and test.",
   "book_chapters": "17;24",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "2021 seen on bookseller catalogue only."
  },
  {
   "id": "STD-103",
   "designation": "IEC TS 62898-1",
   "title": "Microgrids - Part 1: Guidelines for Microgrid Projects Planning and Specification",
   "issuing_org": "IEC TC 8",
   "current_edition": "TS ed. 1, 2017 + AMD1:2023 (published 2023-08-29)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Planning and specification guidance for microgrid projects.",
   "book_chapters": "21;33",
   "source_url": "https://iteh.eu/catalog/standards/iec/3af8506d-c519-4f3d-906d-971a35987f7c/iec-ts-62898-1-2017-amd1-2023",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Technical Specification, not a full standard. Cite with AMD1."
  },
  {
   "id": "STD-104",
   "designation": "IEC TS 62898-2",
   "title": "Microgrids - Part 2: Guidelines for Operation",
   "issuing_org": "IEC TC 8",
   "current_edition": "TS ed. 1, 2018 (to confirm)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Operation and control guidelines for microgrids.",
   "book_chapters": "29;30",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "No data in searches."
  },
  {
   "id": "STD-105",
   "designation": "IEC TS 62898-3-1",
   "title": "Microgrids - Part 3-1: Technical Requirements - Protection and Dynamic Control",
   "issuing_org": "IEC TC 8",
   "current_edition": "TS ed. 1, 2020 + AMD1:2023 (consolidated CSV available)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Protection and dynamic control requirements for microgrids.",
   "book_chapters": "22;28;30",
   "source_url": "https://scc-ccn.ca/standardsdb/standards/2053275",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Buy the consolidated version."
  },
  {
   "id": "STD-106",
   "designation": "IEC 62443 series",
   "title": "Industrial Communication Networks - Network and System Security",
   "issuing_org": "IEC TC 65 / ISA",
   "current_edition": "Parts versioned separately",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Cybersecurity for industrial automation and control systems.",
   "book_chapters": "31",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Cite part and edition."
  },
  {
   "id": "STD-107",
   "designation": "IEC 60364 series",
   "title": "Low-Voltage Electrical Installations",
   "issuing_org": "IEC TC 64",
   "current_edition": "Parts versioned separately",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "International LV installation rules.",
   "book_chapters": "20;27",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Cite part and edition."
  },
  {
   "id": "STD-108",
   "designation": "IEC 61439 series",
   "title": "Low-Voltage Switchgear and Controlgear Assemblies",
   "issuing_org": "IEC SC 121B",
   "current_edition": "61439-1 Edition 3 2020 (to confirm)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "LV assemblies design verification.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-109",
   "designation": "IEC 62271 series",
   "title": "High-Voltage Switchgear and Controlgear",
   "issuing_org": "IEC TC 17",
   "current_edition": "Parts versioned separately",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "HV switchgear.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Cite part and edition."
  },
  {
   "id": "STD-110",
   "designation": "IEC 61000-4-30",
   "title": "EMC - Part 4-30: Testing and Measurement Techniques - Power Quality Measurement Methods",
   "issuing_org": "IEC TC 77A",
   "current_edition": "Edition 3 2015 + AMD1:2021 (to confirm; ed. 4 may exist)",
   "prior_editions_or_amendments": "Edition 2, 2008",
   "category": "Test method",
   "scope_summary": "Class A/S power quality measurement.",
   "book_chapters": "3;47",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-111",
   "designation": "IEC TR 61000-3-6 / -3-7",
   "title": "EMC - Assessment of Emission Limits for Distorting Loads / Fluctuating Loads in MV and HV Power Systems",
   "issuing_org": "IEC SC 77A",
   "current_edition": "Ed. 2, 2008 (to confirm; newer edition possible)",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Harmonic and flicker emission assessment.",
   "book_chapters": "3;36",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-112",
   "designation": "ISO 8528-1:2018",
   "title": "Reciprocating Internal Combustion Engine Driven Alternating Current Generating Sets - Part 1: Application, Ratings and Performance",
   "issuing_org": "ISO",
   "current_edition": "2018 (revision in progress)",
   "prior_editions_or_amendments": "2005",
   "category": "Industry standard",
   "scope_summary": "Genset ratings (ESP, PRP, COP, LTP) and application.",
   "book_chapters": "11;24",
   "source_url": "https://csres-cnrse.nrc-cnrc.gc.ca/en/node/4683",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "No 2025 edition found; 'ISO 8528-1:2025' would be a draft."
  },
  {
   "id": "STD-113",
   "designation": "ISO 8528-5",
   "title": "Reciprocating Internal Combustion Engine Driven AC Generating Sets - Part 5: Generating Sets",
   "issuing_org": "ISO",
   "current_edition": "2025 (edition 6 per listing); 2018 listed historical",
   "prior_editions_or_amendments": "8528-5:2018; 2022",
   "category": "Industry standard",
   "scope_summary": "Generating set performance classes (G1-G3) and transient response.",
   "book_chapters": "11;32;6",
   "source_url": "https://shop.standards.ie/en-ie/standards/iso-8528-5-2025-577626_saig_iso_iso_3605027",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Sources inconsistent on 2018/2022/2025; cite 2025 only after checking iso.org."
  },
  {
   "id": "STD-114",
   "designation": "ANSI/NETA ATS-2025",
   "title": "Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems",
   "issuing_org": "NETA",
   "current_edition": "2025 (ANSI approved 2025-02-20)",
   "prior_editions_or_amendments": "ATS-2021",
   "category": "Industry standard",
   "scope_summary": "Acceptance test procedures; new BESS (7.28) and PV (7.29) sections.",
   "book_chapters": "46;45",
   "source_url": "https://webstore.ansi.org/standards/neta/ansinetaats2025",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": ""
  },
  {
   "id": "STD-115",
   "designation": "ANSI/NETA MTS-2023",
   "title": "Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems",
   "issuing_org": "NETA",
   "current_edition": "2023",
   "prior_editions_or_amendments": "MTS-2019",
   "category": "Industry standard",
   "scope_summary": "Maintenance test procedures.",
   "book_chapters": "48;47",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Latest per NETA update 2026; revision planned."
  },
  {
   "id": "STD-116",
   "designation": "SAE J1772",
   "title": "SAE Electric Vehicle and Plug in Hybrid Electric Vehicle Conductive Charge Coupler",
   "issuing_org": "SAE International",
   "current_edition": "Edition not confirmed (check 2024-2025 revision)",
   "prior_editions_or_amendments": "Multiple",
   "category": "Industry standard",
   "scope_summary": "AC and DC (CCS1) conductive charging connector.",
   "book_chapters": "8",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Not searched."
  },
  {
   "id": "STD-117",
   "designation": "SAE J3400",
   "title": "North American Charging System (NACS) for Electric Vehicles",
   "issuing_org": "SAE International",
   "current_edition": "J3400_202409 (revised Sept 2024); J3400/1_202504 adapter",
   "prior_editions_or_amendments": "TIR Dec 2023",
   "category": "Recommended practice",
   "scope_summary": "NACS connector; elevated from TIR to Recommended Practice in 2024.",
   "book_chapters": "8",
   "source_url": "https://saemobilus.sae.org/standards/j3400_202409-north-american-charging-system-nacs-electric-vehicles",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Do not cite J3400:2023 as current. J3400/1 covers J3400-J1772 adapters."
  },
  {
   "id": "STD-118",
   "designation": "FERC Order No. 2222",
   "title": "Participation of Distributed Energy Resource Aggregations in Markets Operated by RTOs and ISOs",
   "issuing_org": "FERC",
   "current_edition": "Issued 2020-09-17 (compliance ongoing)",
   "prior_editions_or_amendments": "Order 2222-A, 2222-B",
   "category": "Regulatory rule",
   "scope_summary": "Requires RTO/ISO market participation by DER aggregations; compliance timelines vary by region (ISO-NE proposed 2026-11-01; NYISO and others extended).",
   "book_chapters": "40;29",
   "source_url": "",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Compliance status from RTOInsider/ISO-NE; not a FERC page. Issue date from knowledge."
  },
  {
   "id": "STD-119",
   "designation": "FERC Order No. 841",
   "title": "Electric Storage Participation in Markets Operated by RTOs and ISOs",
   "issuing_org": "FERC",
   "current_edition": "Issued 2018-02-15",
   "prior_editions_or_amendments": "841-A",
   "category": "Regulatory rule",
   "scope_summary": "Requires RTOs/ISOs to enable storage wholesale market participation.",
   "book_chapters": "40;15",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-120",
   "designation": "NERC PRC-024-4",
   "title": "Frequency and Voltage Protection Settings for Generating Resources",
   "issuing_org": "NERC",
   "current_edition": "PRC-024-4 (FERC Order 909, 2025-07-24)",
   "prior_editions_or_amendments": "PRC-024-3 retired",
   "category": "Regulatory rule",
   "scope_summary": "Frequency and voltage ride-through settings for synchronous machines, Type 1-2 wind, synchronous condensers.",
   "book_chapters": "18;36;43",
   "source_url": "https://www.govinfo.gov/content/pkg/FR-2025-07-29/html/2025-14304.htm",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "PRC-024-3 is superseded; rule effective 2025-08-28 per Federal Register."
  },
  {
   "id": "STD-121",
   "designation": "NERC PRC-029-1",
   "title": "Frequency and Voltage Ride-through Requirements for Inverter-Based Resources",
   "issuing_org": "NERC",
   "current_edition": "PRC-029-1 (FERC Order 909, 2025-07-24); main effective date reported 2026-10-01",
   "prior_editions_or_amendments": "Replaces IBR coverage in PRC-024-3",
   "category": "Regulatory rule",
   "scope_summary": "Ride-through for bulk-system IBR; legacy exemption request window; FERC directed follow-up on HVDC and long-lead projects.",
   "book_chapters": "18;36;43",
   "source_url": "https://www.nerc.com/news/Pages/Statement-on-FERC-July-Open-Meeting.aspx",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "2026-10-01 effective date is from ESIG recap and inference; verify in NERC implementation plan."
  },
  {
   "id": "STD-122",
   "designation": "NERC CIP series",
   "title": "Critical Infrastructure Protection Reliability Standards (CIP-002 and others)",
   "issuing_org": "NERC",
   "current_edition": "Versions differ per standard",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "Bulk electric system cyber and physical security standards.",
   "book_chapters": "31",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Series note; cite standard and version."
  },
  {
   "id": "STD-123",
   "designation": "ANSI C12.20",
   "title": "American National Standard for Electricity Meters - 0.1, 0.2, and 0.5 Accuracy Classes",
   "issuing_org": "NEMA / ANSI",
   "current_edition": "2015 (to confirm)",
   "prior_editions_or_amendments": "C12.20-2010",
   "category": "Industry standard",
   "scope_summary": "Accuracy classes for revenue meters.",
   "book_chapters": "5;47",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; published by NEMA."
  },
  {
   "id": "STD-124",
   "designation": "ANSI/ASHRAE/IES 90.1",
   "title": "Energy Standard for Sites and Buildings Except Low-Rise Residential Buildings",
   "issuing_org": "ASHRAE",
   "current_edition": "2022 (to confirm; newer cycle possible)",
   "prior_editions_or_amendments": "90.1-2019",
   "category": "Adopted code (model code adopted by jurisdictions)",
   "scope_summary": "Commercial building energy code (brief).",
   "book_chapters": "8;41",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-125",
   "designation": "OSHA 29 CFR 1910.269",
   "title": "Electric Power Generation, Transmission, and Distribution",
   "issuing_org": "OSHA",
   "current_edition": "Current CFR",
   "prior_editions_or_amendments": "2014 revision",
   "category": "Regulatory rule",
   "scope_summary": "Worker safety for generation/transmission/distribution work.",
   "book_chapters": "28;48",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-126",
   "designation": "OSHA 29 CFR 1910 Subpart S",
   "title": "Electrical",
   "issuing_org": "OSHA",
   "current_edition": "Current CFR",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "Electrical safety requirements for general industry.",
   "book_chapters": "28;44",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-127",
   "designation": "40 CFR Part 60 Subpart IIII",
   "title": "Standards of Performance for Stationary Compression Ignition Internal Combustion Engines (NSPS)",
   "issuing_org": "EPA",
   "current_edition": "Current CFR",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "NSPS for stationary diesel engines.",
   "book_chapters": "11;24",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-128",
   "designation": "40 CFR Part 60 Subpart JJJJ",
   "title": "Standards of Performance for Stationary Spark Ignition Internal Combustion Engines (NSPS)",
   "issuing_org": "EPA",
   "current_edition": "Current CFR",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "NSPS for stationary spark-ignition engines.",
   "book_chapters": "11;12",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-129",
   "designation": "40 CFR Part 63 Subpart ZZZZ",
   "title": "NESHAP for Stationary Reciprocating Internal Combustion Engines",
   "issuing_org": "EPA",
   "current_edition": "Current CFR (court-driven changes to emergency engine rules)",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "Hazardous air pollutant standards for stationary RICE.",
   "book_chapters": "11;24",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge."
  },
  {
   "id": "STD-130",
   "designation": "IEEE 1459",
   "title": "IEEE Standard Definitions for the Measurement of Electric Power Quantities Under Sinusoidal, Nonsinusoidal, Balanced, or Unbalanced Conditions",
   "issuing_org": "IEEE SA",
   "current_edition": "1459-2025 (current); 1459-2010 is Inactive-Reserved (inactivated 2021-03-25)",
   "prior_editions_or_amendments": "1459-2000 superseded; 1459-2010 inactive",
   "category": "Industry standard",
   "scope_summary": "Definitions of active, reactive, apparent, non-active and distortion power for single- and three-phase systems.",
   "book_chapters": "1;2",
   "source_url": "https://standards.ieee.org/ieee/1459/7578/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Chapters cite 1459-2010; authors should cite 1459-2025 or state that 2010 is inactive. Status from IEEE SA page snippet; 2025 text not opened."
  },
  {
   "id": "STD-131",
   "designation": "IEEE 1366-2022",
   "title": "IEEE Guide for Electric Power Distribution Reliability Indices",
   "issuing_org": "IEEE SA (PES T&D)",
   "current_edition": "2022 (resellers: published Nov 2022)",
   "prior_editions_or_amendments": "1366-2012; 1366-2003",
   "category": "Guide",
   "scope_summary": "SAIDI, SAIFI, CAIDI, MAIFI definitions and major event day method.",
   "book_chapters": "35;appC",
   "source_url": "https://www.en-standard.eu/ieee-1366-2022-ieee-guide-for-electric-power-distribution-reliability-indices/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition confirmed from reseller listings only; IEEE SA page not opened."
  },
  {
   "id": "STD-132",
   "designation": "IEEE 1588-2019",
   "title": "IEEE Standard for a Precision Clock Synchronization Protocol for Networked Measurement and Control Systems",
   "issuing_org": "IEEE SA (IM/TC-9)",
   "current_edition": "2019 (approved 2019-11-07)",
   "prior_editions_or_amendments": "1588-2008; also adopted as IEC 61588:2021",
   "category": "Industry standard",
   "scope_summary": "Precision Time Protocol (PTP) for sub-microsecond clock sync.",
   "book_chapters": "29;31;46",
   "source_url": "https://webstore.ansi.org/Standards/IEEE/IEEE15882019",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller/catalog confirmation; IEEE SA page not opened. Power profile is C37.238."
  },
  {
   "id": "STD-133",
   "designation": "IEEE C37.112-2018",
   "title": "IEEE Standard for Inverse-Time Characteristics Equations for Overcurrent Relays",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2018 (published 2019-02-05)",
   "prior_editions_or_amendments": "C37.112-1996 (superseded)",
   "category": "Industry standard",
   "scope_summary": "Analytic equations for inverse-time overcurrent relay curves, integral form, reset characteristics.",
   "book_chapters": "28;exD",
   "source_url": "https://standards.ieee.org/ieee/C37.112/7036",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA lists Active."
  },
  {
   "id": "STD-134",
   "designation": "IEEE C37.102-2023",
   "title": "IEEE Guide for AC Generator Protection",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2023 (resellers: released 2024-06)",
   "prior_editions_or_amendments": "C37.102-2006 (Inactive-Reserved); 1995",
   "category": "Guide",
   "scope_summary": "Protection of synchronous generators: faults, loss of field, reverse power, abnormal frequency.",
   "book_chapters": "25;26",
   "source_url": "https://standards.ieee.org/ieee/C37.102/7035/",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA lists Active."
  },
  {
   "id": "STD-135",
   "designation": "IEEE C37.110-2023",
   "title": "IEEE Guide for the Application of Current Transformers Used for Protective Relaying Purposes",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2023 (approved 2023-05-24)",
   "prior_editions_or_amendments": "C37.110-2007 (inactive, withdrawn 2021-03-25)",
   "category": "Guide",
   "scope_summary": "CT saturation, burden and accuracy for protection applications.",
   "book_chapters": "20;26",
   "source_url": "https://standards.ieee.org/ieee/C37.110/6175",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA lists Active."
  },
  {
   "id": "STD-136",
   "designation": "IEEE C37.111-2013 (IEEE/IEC 60255-24)",
   "title": "IEEE/IEC International Standard - Measuring Relays and Protection Equipment - Part 24: Common Format for Transient Data Exchange (COMTRADE) for Power Systems",
   "issuing_org": "IEEE SA / IEC TC 95",
   "current_edition": "2013 (also IEC 60255-24:2013 Ed. 2)",
   "prior_editions_or_amendments": "C37.111-1999; C37.111-1991",
   "category": "Industry standard",
   "scope_summary": "COMTRADE file format for fault and event waveform records.",
   "book_chapters": "48",
   "source_url": "https://reference.globalspec.com/standard/11003303/c37-111-2013",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Sources conflict on IEEE-side status (ANSI store shows Historical). Cite the IEC 60255-24:2013 number."
  },
  {
   "id": "STD-137",
   "designation": "IEEE C37.118.1 (superseded by IEEE/IEC 60255-118-1-2018)",
   "title": "IEEE Standard for Synchrophasor Measurements for Power Systems / IEEE/IEC 60255-118-1",
   "issuing_org": "IEEE SA",
   "current_edition": "IEEE/IEC 60255-118-1-2018 (published 2018-12-19) is current; C37.118.1-2011 and amendment C37.118.1a-2014 are Superseded",
   "prior_editions_or_amendments": "C37.118.1-2011; C37.118.1a-2014",
   "category": "Industry standard",
   "scope_summary": "PMU measurement and performance requirements (P and M class).",
   "book_chapters": "29;31;46",
   "source_url": "https://standards.ieee.org/ieee/C37.118.1/5621/",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Authors cite C37.118.1-2011: replace with IEEE/IEC 60255-118-1-2018. C37.118.2 (data transfer) not checked."
  },
  {
   "id": "STD-138",
   "designation": "IEEE C37.238-2017",
   "title": "IEEE Standard Profile for Use of IEEE 1588 Precision Time Protocol in Power System Applications",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2017 (published 2017-06-19); amendment C37.238a-2023 (leap second TLV)",
   "prior_editions_or_amendments": "C37.238-2011",
   "category": "Industry standard",
   "scope_summary": "PTP power profile; aligns with IEC/IEEE 61850-9-3.",
   "book_chapters": "29;31",
   "source_url": "https://standards.ieee.org/ieee/C37.238/6650",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA lists Active."
  },
  {
   "id": "STD-139",
   "designation": "IEEE C37.101",
   "title": "IEEE Guide for Generator Ground Protection",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "Edition not confirmed (2006 last known)",
   "prior_editions_or_amendments": "None identified",
   "category": "Guide",
   "scope_summary": "Generator grounding and ground-fault protection.",
   "book_chapters": "25",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-140",
   "designation": "IEEE C37.117-2007",
   "title": "IEEE Guide for the Application of Protective Relays Used for Abnormal Frequency Load Shedding and Restoration",
   "issuing_org": "IEEE SA (PSRC)",
   "current_edition": "2007 (as cited; current status not confirmed)",
   "prior_editions_or_amendments": "None identified",
   "category": "Guide",
   "scope_summary": "Under-frequency load shedding and restoration.",
   "book_chapters": "32",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; status not checked."
  },
  {
   "id": "STD-141",
   "designation": "IEEE C37.46",
   "title": "IEEE Standard for High-Voltage Expulsion and Current-Limiting Type Power Class Fuses and Fuse Disconnecting Switches",
   "issuing_org": "IEEE SA (SWG)",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "None identified",
   "category": "Industry standard",
   "scope_summary": "Ratings and tests for power-class HV fuses.",
   "book_chapters": "appB",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-142",
   "designation": "IEEE C37.06",
   "title": "IEEE Standard for AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis - Preferred Ratings and Related Required Capabilities for Voltages Above 1000 V",
   "issuing_org": "IEEE SA (SWG)",
   "current_edition": "2009 (to confirm)",
   "prior_editions_or_amendments": "None identified",
   "category": "Industry standard",
   "scope_summary": "Preferred ratings of HV breakers.",
   "book_chapters": "20;appB",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched. Cited with C37.04."
  },
  {
   "id": "STD-143",
   "designation": "IEEE C37.20.7-2024",
   "title": "IEEE Recommended Practice for Testing Switchgear Rated Up to 52 kV for Internal Arcing Faults",
   "issuing_org": "IEEE SA (SWG)",
   "current_edition": "2024 (reseller listing shows latest)",
   "prior_editions_or_amendments": "C37.20.7-2017 (+Cor 1-2021); 2007 (guide for 38 kV)",
   "category": "Recommended practice",
   "scope_summary": "Internal arcing fault testing of metal-enclosed switchgear.",
   "book_chapters": "28",
   "source_url": "https://shop.standards.ie/en-ie/standards/ieee-c37-20-7-2024-1350548_saig_ieee_ieee_3367941",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Document type changed from Guide to Recommended Practice and voltage scope to 52 kV. Reseller only."
  },
  {
   "id": "STD-144",
   "designation": "IEEE C57.13-2016",
   "title": "IEEE Standard Requirements for Instrument Transformers",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2016 (published 2016-06-29)",
   "prior_editions_or_amendments": "C57.13-2008; 1993",
   "category": "Industry standard",
   "scope_summary": "Metering and relaying CT/VT requirements and accuracy classes.",
   "book_chapters": "20;47;appB",
   "source_url": "https://shop.standards.ie/en-ie/standards/ieee-c57-13-2016-571689_saig_ieee_ieee_2763321",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller confirmation; IEEE SA page not opened."
  },
  {
   "id": "STD-145",
   "designation": "IEEE C57.13.6-2005",
   "title": "IEEE Standard for High Accuracy Instrument Transformers",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2005 (no later edition found)",
   "prior_editions_or_amendments": "None identified",
   "category": "Industry standard",
   "scope_summary": "0.15 and 0.15S accuracy classes for CTs and 0.15 for VTs.",
   "book_chapters": "20",
   "source_url": "https://standards.globalspec.com/std/818643/ieee-c57-13-6",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "The 0.15/0.15S classes live here, not in C57.13 base (author flagged). Reseller only."
  },
  {
   "id": "STD-146",
   "designation": "IEEE C57.109-2018",
   "title": "IEEE Guide for Liquid-Immersed Transformers Through-Fault-Current Duration",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2018 (published 2018-10-05); revision PAR approved 2026-02-12",
   "prior_editions_or_amendments": "C57.109-1993 (inactive); 1985",
   "category": "Guide",
   "scope_summary": "Through-fault withstand curves by transformer category.",
   "book_chapters": "28",
   "source_url": "https://standards.ieee.org/ieee/C57.109/6120",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA lists Active."
  },
  {
   "id": "STD-147",
   "designation": "IEEE C57.12.59",
   "title": "IEEE Guide for Dry-Type Transformer Through-Fault Current Duration",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2015 believed; not confirmed",
   "prior_editions_or_amendments": "None identified",
   "category": "Guide",
   "scope_summary": "Through-fault duration for dry-type transformers.",
   "book_chapters": "28",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-148",
   "designation": "IEEE C57.32-2015",
   "title": "IEEE Standard for Requirements, Terminology, and Test Procedures for Neutral Grounding Devices",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2015; amendment C57.32a-2020; withdrawal reported by resellers (2026-03-26) while IEEE page shows Active; revision PAR active",
   "prior_editions_or_amendments": "C57.32-2002; 32-1972",
   "category": "Industry standard",
   "scope_summary": "Neutral grounding resistors and reactors.",
   "book_chapters": "27",
   "source_url": "https://standards.ieee.org/ieee/C57.32/5393/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Sources conflict; check IEEE SA before citing. Revision PC57.32 in progress."
  },
  {
   "id": "STD-149",
   "designation": "IEEE C57.91",
   "title": "IEEE Guide for Loading Mineral-Oil-Immersed Transformers and Step-Voltage Regulators",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2011 (+Cor 1-2012) believed; not confirmed",
   "prior_editions_or_amendments": "1995",
   "category": "Guide",
   "scope_summary": "Transformer thermal loading and loss of life.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; search returned only C57.12.91."
  },
  {
   "id": "STD-150",
   "designation": "IEEE C57.96",
   "title": "IEEE Guide for Loading Dry-Type Distribution and Power Transformers",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2013 believed; not confirmed",
   "prior_editions_or_amendments": "1999",
   "category": "Guide",
   "scope_summary": "Dry-type transformer loading.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-151",
   "designation": "IEEE C57.159",
   "title": "IEEE Guide on Transformers for Application in Distributed Photovoltaic (DPV) Power Generation Systems",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2016 believed; not confirmed",
   "prior_editions_or_amendments": "None identified",
   "category": "Guide",
   "scope_summary": "Transformers serving PV and inverter loads.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; designation and title flagged by author."
  },
  {
   "id": "STD-152",
   "designation": "IEEE C57.12.01",
   "title": "IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers",
   "issuing_org": "IEEE SA (TC)",
   "current_edition": "2020 believed; not confirmed",
   "prior_editions_or_amendments": "2015; 2005",
   "category": "Industry standard",
   "scope_summary": "Dry-type transformer general requirements, rise classes.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; search returned only C57.12.91 (dry-type test code, active 2026 edition seen)."
  },
  {
   "id": "STD-153",
   "designation": "IEEE C62.92 series (C62.92.1, C62.92.6)",
   "title": "IEEE Guide for Application of Neutral Grounding in Electrical Utility Systems (Parts I to VI)",
   "issuing_org": "IEEE SA (SPD)",
   "current_edition": "Per-part editions vary; C62.92.6 believed 2017",
   "prior_editions_or_amendments": "Per part",
   "category": "Guide",
   "scope_summary": "Neutral grounding methods; Part VI covers current-regulated (inverter) sources.",
   "book_chapters": "27;exE",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; part titles and editions unconfirmed."
  },
  {
   "id": "STD-154",
   "designation": "IEEE C2 (NESC)",
   "title": "National Electrical Safety Code",
   "issuing_org": "IEEE SA",
   "current_edition": "2023 edition believed current; 2027 edition in development",
   "prior_editions_or_amendments": "2017; 2012",
   "category": "Industry standard",
   "scope_summary": "Utility overhead/underground and substation safety rules.",
   "book_chapters": "41",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-155",
   "designation": "IEEE 3002.2-2018",
   "title": "IEEE Recommended Practice for Conducting Load-Flow Studies and Analysis of Industrial and Commercial Power Systems",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "2018",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "Load-flow study practice.",
   "book_chapters": "4",
   "source_url": "https://webstore.ansi.org/standards/ieee/ieee30022018-1732941",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Webstore URL seen; edition from knowledge."
  },
  {
   "id": "STD-156",
   "designation": "IEEE 3002.3-2018",
   "title": "IEEE Recommended Practice for Conducting Short-Circuit Studies and Analysis of Industrial and Commercial Power Systems",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "2018 (approved 2018-09-27; published 2019-03-29)",
   "prior_editions_or_amendments": "Replaces IEEE 399 (Brown Book) short-circuit chapter",
   "category": "Recommended practice",
   "scope_summary": "Short-circuit modeling and device duty.",
   "book_chapters": "4;20;25",
   "source_url": "https://ieeexplore.ieee.org/document/8672198",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEEE Xplore lists active."
  },
  {
   "id": "STD-157",
   "designation": "IEEE 3002.7-2018",
   "title": "IEEE Recommended Practice for Conducting Motor-Starting Studies and Analysis of Industrial and Commercial Power Systems",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "2018 (publication date listed 2019-04-26)",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "Motor-starting current and voltage-dip studies.",
   "book_chapters": "6;18;exD",
   "source_url": "https://standards.ieee.org/ieee/3002.7/4435",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA lists Active."
  },
  {
   "id": "STD-158",
   "designation": "IEEE 3003.1-2019",
   "title": "IEEE Recommended Practice for System Grounding of Industrial and Commercial Power Systems",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "2019",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "System grounding methods.",
   "book_chapters": "27;appC",
   "source_url": "https://reference.globalspec.com/ref/13420532/3003-1-2019",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA page for 3003.1 not retrieved."
  },
  {
   "id": "STD-159",
   "designation": "IEEE 3003.2-2014",
   "title": "IEEE Recommended Practice for Equipment Grounding and Bonding in Industrial and Commercial Power Systems",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "2014; revision PAR approved 2025-09-10",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "Equipment grounding and bonding.",
   "book_chapters": "27",
   "source_url": "https://standards.ieee.org/ieee/3003.2/4439",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "One IEEE SA listing shows Inactive-Reserved; conflict not resolved."
  },
  {
   "id": "STD-160",
   "designation": "IEEE 3006.5-2014",
   "title": "IEEE Recommended Practice for the Use of Probability Methods for Conducting a Reliability Analysis of Industrial and Commercial Power Systems Equipment",
   "issuing_org": "IEEE SA (IAS)",
   "current_edition": "2014 believed",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "Probabilistic reliability analysis.",
   "book_chapters": "35",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Title and edition from memory; authors flagged 3006.5/.7/.9 (2013-2014 believed)."
  },
  {
   "id": "STD-161",
   "designation": "IEEE 81-2012",
   "title": "IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System",
   "issuing_org": "IEEE SA (PES SUB)",
   "current_edition": "2012; one reseller lists Withdrawn",
   "prior_editions_or_amendments": "81-1983",
   "category": "Guide",
   "scope_summary": "Fall-of-potential and soil resistivity testing.",
   "book_chapters": "27;45",
   "source_url": "https://shop.standards.ie/en-ie/standards/ieee-81-2012-570505_saig_ieee_ieee_1305533",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Possible withdrawal not confirmed on IEEE SA."
  },
  {
   "id": "STD-162",
   "designation": "IEEE 485-2020",
   "title": "IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications",
   "issuing_org": "IEEE SA (PES SB)",
   "current_edition": "2020 (approved 2020-05-06)",
   "prior_editions_or_amendments": "485-2010; 485-1997",
   "category": "Recommended practice",
   "scope_summary": "DC load and lead-acid battery sizing method.",
   "book_chapters": "21",
   "source_url": "https://standards.ieee.org/standard/485-2020/",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEEE SA lists Active. Believed 2020 confirmed."
  },
  {
   "id": "STD-163",
   "designation": "IEEE 1204-1997",
   "title": "IEEE Guide for Planning DC Links Terminating at AC Locations Having Low Short-Circuit Capacities",
   "issuing_org": "IEEE SA (PES)",
   "current_edition": "1997; status not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "HVDC links to weak AC systems (SCR criteria).",
   "book_chapters": "18;appC",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Title from a library catalog (secondary); IEEE SA status not found. Not a monitoring guide."
  },
  {
   "id": "STD-164",
   "designation": "IEEE 43",
   "title": "IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery",
   "issuing_org": "IEEE SA (EM)",
   "current_edition": "43-2013 believed; not confirmed",
   "prior_editions_or_amendments": "43-2000",
   "category": "Recommended practice",
   "scope_summary": "Insulation resistance and polarization index.",
   "book_chapters": "45",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-165",
   "designation": "IEEE 400 series",
   "title": "IEEE Guide for Field Testing and Evaluation of the Insulation of Shielded Power Cable Systems",
   "issuing_org": "IEEE SA (IC)",
   "current_edition": "400-2012 believed; sub-parts 400.1/.2/.3 vary",
   "prior_editions_or_amendments": "Earlier 2001",
   "category": "Guide",
   "scope_summary": "Cable field tests (VLF, PD, DC).",
   "book_chapters": "45",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-166",
   "designation": "IEEE 315",
   "title": "IEEE Standard Graphic Symbols for Electrical and Electronics Diagrams",
   "issuing_org": "IEEE SA",
   "current_edition": "315-1975 (reaffirmed 1993); confirm status",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Electrical diagram symbols.",
   "book_chapters": "36",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-167",
   "designation": "IEEE 1547.4-2011",
   "title": "IEEE Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems",
   "issuing_org": "IEEE SA (SCC21)",
   "current_edition": "2011; Inactive-Reserved (inactivated 2022-03-24); successor P1547.4 in development",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Intentional island (microgrid) design guidance.",
   "book_chapters": "22",
   "source_url": "https://standards.ieee.org/ieee/1547.4/3532/",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Do not cite as active; successor project retitled for intentional electric power system islands."
  },
  {
   "id": "STD-168",
   "designation": "IEEE 802.1Q",
   "title": "IEEE Standard for Local and Metropolitan Area Networks - Bridges and Bridged Networks",
   "issuing_org": "IEEE SA (802.1)",
   "current_edition": "802.1Q-2022 believed; not confirmed",
   "prior_editions_or_amendments": "Earlier 2018",
   "category": "Industry standard",
   "scope_summary": "VLAN and priority tagging.",
   "book_chapters": "31;appC",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-169",
   "designation": "IEC 60038",
   "title": "IEC Standard Voltages",
   "issuing_org": "IEC TC 8",
   "current_edition": "Edition 7.1 (7.0 2009 + AMD1:2021 consolidated, 2021-12-15)",
   "prior_editions_or_amendments": "Edition 7.0 (2009-06-17)",
   "category": "Industry standard",
   "scope_summary": "Preferred nominal system voltages.",
   "book_chapters": "1;appB",
   "source_url": "https://webstore.iec.ch/publication/153",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEC webstore: Ed. 7.0 superseded by 2009+AMD1:2021 CSV (added 30 kV, 1,100 kV)."
  },
  {
   "id": "STD-170",
   "designation": "IEC 60050-192",
   "title": "International Electrotechnical Vocabulary - Part 192: Dependability",
   "issuing_org": "IEC TC 1",
   "current_edition": "Edition 1 (2015) believed",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Dependability terminology.",
   "book_chapters": "35",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-171",
   "designation": "IEC 60228",
   "title": "Conductors of Insulated Cables",
   "issuing_org": "IEC TC 20",
   "current_edition": "Edition 4.0, 2023 (December)",
   "prior_editions_or_amendments": "Edition 3.0 2004",
   "category": "Industry standard",
   "scope_summary": "Conductor classes and nominal cross-sections 0.5 to 3,500 mm2.",
   "book_chapters": "appA",
   "source_url": "https://scc-ccn.ca/standardsdb/standards/2053473",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Catalog confirmation only. Authors citing earlier edition should update."
  },
  {
   "id": "STD-172",
   "designation": "IEC 60255-149:2013",
   "title": "Measuring Relays and Protection Equipment - Part 149: Functional Requirements for Thermal Electrical Relays",
   "issuing_org": "IEC TC 95",
   "current_edition": "2013",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Thermal overload relay functional requirements.",
   "book_chapters": "17",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-173",
   "designation": "IEC 60255-151",
   "title": "Measuring Relays and Protection Equipment - Part 151: Functional Requirements for Over/Under Current Protection",
   "issuing_org": "IEC TC 95",
   "current_edition": "Edition 1.0 (2009) believed",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Overcurrent relay time-current characteristics.",
   "book_chapters": "28",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Search returned no information; edition from knowledge."
  },
  {
   "id": "STD-174",
   "designation": "IEC 60300-3-3",
   "title": "Dependability Management - Part 3-3: Application Guide - Life Cycle Costing",
   "issuing_org": "IEC TC 56",
   "current_edition": "2004 believed; revision status unknown",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Life-cycle cost methods.",
   "book_chapters": "37",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-175",
   "designation": "IEC 60529",
   "title": "Degrees of Protection Provided by Enclosures (IP Code)",
   "issuing_org": "IEC TC 70",
   "current_edition": "Edition 2.2 (1989 + AMD1:1999 + AMD2:2013 consolidated); Cor. 2015",
   "prior_editions_or_amendments": "Edition 2.1 (2001)",
   "category": "Industry standard",
   "scope_summary": "IP rating system.",
   "book_chapters": "16;appH",
   "source_url": "https://webstore.iec.ch/en/publication/2452",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEC webstore consolidated version."
  },
  {
   "id": "STD-176",
   "designation": "IEC 60870-5-104",
   "title": "Telecontrol Equipment and Systems - Part 5-104: Transmission Protocols - Network Access for IEC 60870-5-101",
   "issuing_org": "IEC TC 57",
   "current_edition": "Edition 2.0 (2006) believed; amendment status not confirmed",
   "prior_editions_or_amendments": "Edition 1.0 2000",
   "category": "Industry standard",
   "scope_summary": "Telecontrol over TCP/IP (SCADA).",
   "book_chapters": "31",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-177",
   "designation": "IEC 60904-3",
   "title": "Photovoltaic Devices - Part 3: Measurement Principles for Terrestrial PV Solar Devices with Reference Spectral Irradiance Data",
   "issuing_org": "IEC TC 82",
   "current_edition": "Edition 4 (2019) believed",
   "prior_editions_or_amendments": "Edition 3 2016",
   "category": "Test method",
   "scope_summary": "Reference spectrum and STC definitions.",
   "book_chapters": "9",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-178",
   "designation": "IEC 60947-2",
   "title": "Low-Voltage Switchgear and Controlgear - Part 2: Circuit-Breakers",
   "issuing_org": "IEC SC 121A",
   "current_edition": "Edition 5.1 (2016 + AMD1:2019) believed",
   "prior_editions_or_amendments": "Edition 4.2 2006",
   "category": "Industry standard",
   "scope_summary": "IEC molded-case/air breaker ratings.",
   "book_chapters": "20",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-179",
   "designation": "IEC 61000-4-7",
   "title": "Electromagnetic Compatibility - Part 4-7: General Guide on Harmonics and Interharmonics Measurements and Instrumentation",
   "issuing_org": "IEC SC 77A",
   "current_edition": "Edition 2.1 (2009; 2002 text with A1:2008 consolidated)",
   "prior_editions_or_amendments": "Edition 2.0 2002",
   "category": "Test method",
   "scope_summary": "Harmonic measurement 0 to 9 kHz, 200 ms grouping.",
   "book_chapters": "3",
   "source_url": "https://standards.nimonik.com/products/iec/61000-4-7/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Catalog confirmation; IEC webstore not opened."
  },
  {
   "id": "STD-180",
   "designation": "IEC 61000-4-15",
   "title": "Electromagnetic Compatibility - Part 4-15: Flickermeter - Functional and Design Specifications",
   "issuing_org": "IEC SC 77A",
   "current_edition": "Edition 2.0 (2010-08-24); Cor. 2012",
   "prior_editions_or_amendments": "Edition 1.1 2003",
   "category": "Test method",
   "scope_summary": "Flicker (Pst/Plt) instrument spec.",
   "book_chapters": "3",
   "source_url": "https://webstore.iec.ch/publication/22269",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEC webstore page seen."
  },
  {
   "id": "STD-181",
   "designation": "IEC 61116",
   "title": "Electromechanical Equipment - Guide for Small Hydroelectric Installations",
   "issuing_org": "IEC TC 4",
   "current_edition": "1992 believed; not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Guide",
   "scope_summary": "Small hydro electromechanical guide.",
   "book_chapters": "10",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-182",
   "designation": "IEC 61131-3",
   "title": "Programmable Controllers - Part 3: Programming Languages",
   "issuing_org": "IEC SC 65B",
   "current_edition": "Edition 3.0 (2013); several catalogs show Edition 4 (2025) replacing it",
   "prior_editions_or_amendments": "Edition 2.0 2003",
   "category": "Industry standard",
   "scope_summary": "PLC languages (ST, LD, FBD).",
   "book_chapters": "29",
   "source_url": "https://webstore.iec.ch/publication/4552",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Edition 4 (2025) reported by SNV/EVS/standards.ie; confirm on IEC webstore. Authors citing 2013 should note 2025 edition."
  },
  {
   "id": "STD-183",
   "designation": "IEC 61215 series",
   "title": "Terrestrial Photovoltaic (PV) Modules - Design Qualification and Type Approval",
   "issuing_org": "IEC TC 82",
   "current_edition": "61215-1:2021 Edition 2 (NMOT test removed); -2:2021",
   "prior_editions_or_amendments": "61215-1:2016",
   "category": "Test method",
   "scope_summary": "PV module qualification tests.",
   "book_chapters": "9",
   "source_url": "https://shop.standards.ie/en-ie/standards/iec-61215-1-2021-568472_saig_iec_iec_2922519",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Per-part editions vary. NMOT is now defined in IEC 61853-2."
  },
  {
   "id": "STD-184",
   "designation": "IEC 61400-2",
   "title": "Wind Energy Generation Systems - Part 2: Small Wind Turbines",
   "issuing_org": "IEC TC 88",
   "current_edition": "Edition 3 (2013) believed; later edition not confirmed",
   "prior_editions_or_amendments": "Edition 2 2006",
   "category": "Industry standard",
   "scope_summary": "Design requirements for small wind turbines.",
   "book_chapters": "10",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; note IEC 61400-12-1:2022 absorbed old -12-2."
  },
  {
   "id": "STD-185",
   "designation": "IEC 61508 series",
   "title": "Functional Safety of Electrical/Electronic/Programmable Electronic Safety-Related Systems",
   "issuing_org": "IEC SC 65A",
   "current_edition": "Edition 2.0 (2010) believed for Parts 1-7",
   "prior_editions_or_amendments": "Edition 1 1998-2000",
   "category": "Industry standard",
   "scope_summary": "SIL framework; Part 6 gives beta-factor guidance.",
   "book_chapters": "35;appC",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Search did not confirm edition."
  },
  {
   "id": "STD-186",
   "designation": "IEC 61557-8",
   "title": "Electrical Safety in Low-Voltage Distribution Systems up to 1000 V AC and 1500 V DC - Part 8: Insulation Monitoring Devices for IT Systems",
   "issuing_org": "IEC TC 85",
   "current_edition": "Edition 3 (2014) believed",
   "prior_editions_or_amendments": "Edition 2 2007",
   "category": "Test method",
   "scope_summary": "Insulation monitoring devices for IT systems.",
   "book_chapters": "16;27",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-187",
   "designation": "IEC 61660-1",
   "title": "Short-Circuit Currents in D.C. Auxiliary Installations in Power Plants and Substations - Part 1: Calculation of Short-Circuit Currents",
   "issuing_org": "IEC TC 73",
   "current_edition": "Edition 1.0 (1997)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "DC auxiliary short-circuit calculation.",
   "book_chapters": "25",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Author flagged 1997 edition; current edition not confirmed."
  },
  {
   "id": "STD-188",
   "designation": "IEC 61683:1999",
   "title": "Photovoltaic Systems - Power Conditioners - Procedure for Measuring Efficiency",
   "issuing_org": "IEC TC 82",
   "current_edition": "Edition 1.0 (1999)",
   "prior_editions_or_amendments": "None",
   "category": "Test method",
   "scope_summary": "Inverter efficiency measurement (stand-alone and grid-tied).",
   "book_chapters": "17;46",
   "source_url": "https://shop.standards.ie/en-ie/standards/iec-61683-1999-569256_saig_iec_iec_1300138",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Status unclear (listed current, stability date 2018); mostly superseded in practice by EN 50530 / IEC 61683 users; no bidirectional-PCS coverage."
  },
  {
   "id": "STD-189",
   "designation": "IEC 61730 series (and UL 61730)",
   "title": "Photovoltaic (PV) Module Safety Qualification",
   "issuing_org": "IEC TC 82",
   "current_edition": "61730-1:2023 Edition 3 (published 2023-09-12)",
   "prior_editions_or_amendments": "61730-1:2016",
   "category": "Test method",
   "scope_summary": "PV module safety construction and testing.",
   "book_chapters": "9",
   "source_url": "https://scc-ccn.ca/standardsdb/standards/2053066",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Part 2 edition not checked; UL 61730 edition unconfirmed."
  },
  {
   "id": "STD-190",
   "designation": "IEC 61853 series",
   "title": "Photovoltaic (PV) Module Performance Testing and Energy Rating",
   "issuing_org": "IEC TC 82",
   "current_edition": "Part 1 2011; Part 2 2016 (believed); newer editions not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Test method",
   "scope_summary": "Power matrix, NMOT, angular response.",
   "book_chapters": "9",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Search did not return editions."
  },
  {
   "id": "STD-191",
   "designation": "IEC 62006:2010",
   "title": "Hydraulic Machines - Acceptance Tests of Small Hydroelectric Installations",
   "issuing_org": "IEC TC 4",
   "current_edition": "Edition 1 (2010-10-28); Edition 2 in development",
   "prior_editions_or_amendments": "None",
   "category": "Test method",
   "scope_summary": "Field acceptance tests for small hydro (up to ~15 MW).",
   "book_chapters": "10",
   "source_url": "https://webstore.iec.ch/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Not a grid-connection standard (if a chapter uses it for asynchronous-generator grid connection, the citation is wrong)."
  },
  {
   "id": "STD-192",
   "designation": "IEC 62109-2",
   "title": "Safety of Power Converters for Use in Photovoltaic Power Systems - Part 2: Particular Requirements for Inverters",
   "issuing_org": "IEC TC 82",
   "current_edition": "Edition 1.0 (2011-06-23); Edition 2 in development (prEN IEC 62109-2:2025)",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "PV inverter safety; use with 62109-1.",
   "book_chapters": "16;27",
   "source_url": "https://webstore.iec.ch/publication/6471",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Edition 1 still current as of search."
  },
  {
   "id": "STD-193",
   "designation": "IEC 62282-3-100",
   "title": "Fuel Cell Technologies - Part 3-100: Stationary Fuel Cell Power Systems - Safety",
   "issuing_org": "IEC TC 105",
   "current_edition": "Edition 2 (2019); Edition 3 in development",
   "prior_editions_or_amendments": "Edition 1 2012",
   "category": "Product certification standard",
   "scope_summary": "Safety of stationary fuel cell systems.",
   "book_chapters": "12",
   "source_url": "https://webstore.iec.ch/publication/59566",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "IEC webstore page seen."
  },
  {
   "id": "STD-194",
   "designation": "IEC 62351 series",
   "title": "Power Systems Management and Associated Information Exchange - Data and Communications Security",
   "issuing_org": "IEC TC 57",
   "current_edition": "Per-part: 62351-3:2023 Ed. 2; 62351-6:2020 Ed. 1; others vary",
   "prior_editions_or_amendments": "Per part",
   "category": "Industry standard",
   "scope_summary": "Security for 61850, 60870-5, DNP3.",
   "book_chapters": "31",
   "source_url": "https://webstore.iec.ch/en/publication/6912",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Pack page found; individual parts not all checked."
  },
  {
   "id": "STD-195",
   "designation": "IEC 62439 series",
   "title": "Industrial Communication Networks - High Availability Automation Networks",
   "issuing_org": "IEC SC 65C",
   "current_edition": "62439-3:2021 Edition 4 (PRP/HSR; Cor. 2023); 62439-2 not confirmed",
   "prior_editions_or_amendments": "62439-3:2016",
   "category": "Industry standard",
   "scope_summary": "PRP, HSR and MRP redundancy.",
   "book_chapters": "31",
   "source_url": "https://webstore.iec.ch/publication/64423",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Part 2 (MRP) edition not found."
  },
  {
   "id": "STD-196",
   "designation": "IEC 62541 series",
   "title": "OPC Unified Architecture",
   "issuing_org": "IEC TC 65",
   "current_edition": "Multi-part; editions vary",
   "prior_editions_or_amendments": "Per part",
   "category": "Industry standard",
   "scope_summary": "OPC UA.",
   "book_chapters": "31",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-197",
   "designation": "IEC 62682",
   "title": "Management of Alarms Systems for the Process Industries",
   "issuing_org": "IEC SC 65A",
   "current_edition": "Edition 2 (2022); 2014 edition superseded",
   "prior_editions_or_amendments": "IEC 62682:2014",
   "category": "Industry standard",
   "scope_summary": "Alarm management lifecycle (aligned with ISA-18.2).",
   "book_chapters": "48",
   "source_url": "https://www.intertekinform.com/en-gb/standards/iec-62682-2014-568091_saig_iec_iec_1296811/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Superseding edition identified from one listing; IEC webstore not opened."
  },
  {
   "id": "STD-198",
   "designation": "IEC 62746-10-1:2018",
   "title": "Systems Interface Between Customer Energy Management System and the Power Management System - Part 10-1: Open Automated Demand Response",
   "issuing_org": "IEC TC 57",
   "current_edition": "Edition 1.0, 2018 (OpenADR 2.0b)",
   "prior_editions_or_amendments": "IEC PAS 62746-10-1:2014 (cancelled)",
   "category": "Industry standard",
   "scope_summary": "OpenADR 2.0b demand response profile.",
   "book_chapters": "8",
   "source_url": "https://www.boutique.afnor.org/en-gb/standard/iec-627461012018/systems-interface-between-customer-energy-management-system-and-the-power-m/xs133603/253252",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "OpenADR 3.0 is an Alliance spec, not shown as an IEC part. IEC 62746-10-3 not found."
  },
  {
   "id": "STD-199",
   "designation": "IEC 60028",
   "title": "International Standard of Resistance for Copper",
   "issuing_org": "IEC",
   "current_edition": "1925 (believed withdrawn)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Historic copper resistivity standard (IACS basis).",
   "book_chapters": "appA",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; likely withdrawn - cite IEC 60468 or ASTM B193/B230 for conductivity instead; unverified."
  },
  {
   "id": "STD-200",
   "designation": "IEC 60269",
   "title": "Low-Voltage Fuses",
   "issuing_org": "IEC SC 32B",
   "current_edition": "Series; editions vary by part",
   "prior_editions_or_amendments": "Per part",
   "category": "Industry standard",
   "scope_summary": "IEC LV fuse requirements.",
   "book_chapters": "appB",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-201",
   "designation": "EN 50530:2010 (+A1:2013)",
   "title": "Overall Efficiency of Grid Connected Photovoltaic Inverters",
   "issuing_org": "CENELEC",
   "current_edition": "EN 50530:2010 + A1:2013",
   "prior_editions_or_amendments": "None",
   "category": "Test method",
   "scope_summary": "Static/dynamic MPPT efficiency and EU weighted efficiency.",
   "book_chapters": "17",
   "source_url": "https://standards.iteh.ai/catalog/standards/clc/69b211c7-a706-4dfc-aa86-42d943292f76/en-50530-2010",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Catalog status conflicting (A1 shown withdrawn in one listing)."
  },
  {
   "id": "STD-202",
   "designation": "EN 50600 series",
   "title": "Information Technology - Data Centre Facilities and Infrastructures",
   "issuing_org": "CENELEC",
   "current_edition": "Multi-part; editions vary",
   "prior_editions_or_amendments": "Per part",
   "category": "Industry standard",
   "scope_summary": "Data centre infrastructure classes.",
   "book_chapters": "35",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-203",
   "designation": "UL 248 (248-1 General Requirements)",
   "title": "Low-Voltage Fuses",
   "issuing_org": "UL Standards and Engagement",
   "current_edition": "UL 248-1 Ed. 4 (2022-10-24); 248-9 Ed. 3 (2025-12-10); 248-21 Ed. 1 (2025)",
   "prior_editions_or_amendments": "UL 248-1 Ed. 3 (2017)",
   "category": "Product certification standard",
   "scope_summary": "Fuse classes and ratings.",
   "book_chapters": "25;28;appB",
   "source_url": "https://webstore.ansi.org/standards/ul/ul248ed2022",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Parts versioned separately; one trade article called a revision 'third edition' (conflict)."
  },
  {
   "id": "STD-204",
   "designation": "UL 67",
   "title": "Panelboards",
   "issuing_org": "UL Standards and Engagement",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "Panelboard construction and ratings.",
   "book_chapters": "appB",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-205",
   "designation": "UL 1008",
   "title": "Transfer Switch Equipment",
   "issuing_org": "UL Standards and Engagement",
   "current_edition": "Ed. 9 (2022-07); ANSI store lists a 2026 revision (published 2026-08-25); 1008M (meter-mounted) 2024/2025",
   "prior_editions_or_amendments": "Ed. 8 2018 (believed)",
   "category": "Product certification standard",
   "scope_summary": "ATS ratings, withstand and closing.",
   "book_chapters": "22;exB",
   "source_url": "https://webstore.ansi.org/standards/ul/ul1008ed20222026",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "UL page not opened; the 'Ed. 7' short-circuit language may be old."
  },
  {
   "id": "STD-206",
   "designation": "UL 1066",
   "title": "Power Circuit Breakers up to 1000 V AC and 1500 V DC Used in Enclosures",
   "issuing_org": "UL Standards and Engagement (harmonized CSA C22.2 No. 268)",
   "current_edition": "Ed. 5 (2022-08-08)",
   "prior_editions_or_amendments": "Ed. 4 2012-04-13",
   "category": "Product certification standard",
   "scope_summary": "LV power circuit breakers (ANSI C37.13 family replacement).",
   "book_chapters": "20;28",
   "source_url": "https://webstore.ansi.org/standards/ul/ul1066ed2022",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Title in ch22 should match current title."
  },
  {
   "id": "STD-207",
   "designation": "UL 3141",
   "title": "Power Control Systems",
   "issuing_org": "UL Standards and Engagement",
   "current_edition": "Edition 2 (2024) per ANSI store; began as Outline of Investigation (2020)",
   "prior_editions_or_amendments": "Outline of Investigation 2020",
   "category": "Product certification standard",
   "scope_summary": "Safety of PCS (NEC 705.13/750.30 current limiting).",
   "book_chapters": "36;43",
   "source_url": "https://webstore.ansi.org/standards/ul/ul3141ed2024-2548384",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Document-type naming inconsistent across sources; UL page not opened."
  },
  {
   "id": "STD-208",
   "designation": "UL 62109-2",
   "title": "Safety of Power Converters for Use in Photovoltaic Power Systems - Part 2",
   "issuing_org": "UL Standards and Engagement",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "US adoption of IEC 62109-2.",
   "book_chapters": "",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Only a draft was mentioned in search; 62109-1 is in STD-079."
  },
  {
   "id": "STD-209",
   "designation": "NFPA 99",
   "title": "Health Care Facilities Code",
   "issuing_org": "NFPA",
   "current_edition": "2024 (effective/pub Aug 2023)",
   "prior_editions_or_amendments": "2021; 2018",
   "category": "Industry standard",
   "scope_summary": "Essential electrical systems for health care.",
   "book_chapters": "6;11;41;exB",
   "source_url": "https://shop.iccsafe.org/nfpa-99-healthcare-facilities-code-2024.html",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller confirmation; check CMS-adopted edition (CMS has adopted 2012 historically)."
  },
  {
   "id": "STD-210",
   "designation": "NFPA 30",
   "title": "Flammable and Combustible Liquids Code",
   "issuing_org": "NFPA",
   "current_edition": "2024",
   "prior_editions_or_amendments": "2021",
   "category": "Industry standard",
   "scope_summary": "Fuel storage.",
   "book_chapters": "24",
   "source_url": "https://infostore.saiglobal.com/en-us/standards/nfpa-30-2024-829535_saig_nfpa_nfpa_3290545/",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller confirmation."
  },
  {
   "id": "STD-211",
   "designation": "NFPA 68",
   "title": "Standard on Explosion Protection by Deflagration Venting",
   "issuing_org": "NFPA",
   "current_edition": "2023 (Errata 68-23-1)",
   "prior_editions_or_amendments": "2018",
   "category": "Industry standard",
   "scope_summary": "Vent sizing for enclosures.",
   "book_chapters": "16;42;44",
   "source_url": "https://webstore.ansi.org/standards/nfpa/nfpa682023",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller confirmation."
  },
  {
   "id": "STD-212",
   "designation": "NFPA 69",
   "title": "Standard on Explosion Prevention Systems",
   "issuing_org": "NFPA",
   "current_edition": "2024 (published Dec 2023)",
   "prior_editions_or_amendments": "2019",
   "category": "Industry standard",
   "scope_summary": "Deflagration prevention incl. 25% LFL ventilation.",
   "book_chapters": "16;42;44",
   "source_url": "https://webstore.ansi.org/standards/nfpa/nfpa692024",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller confirmation."
  },
  {
   "id": "STD-213",
   "designation": "NFPA 853",
   "title": "Standard for the Installation of Stationary Fuel Cell Power Systems",
   "issuing_org": "NFPA",
   "current_edition": "Edition not confirmed (2020 believed)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Fuel cell installation.",
   "book_chapters": "12",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "No search result for a 2025 edition."
  },
  {
   "id": "STD-214",
   "designation": "NFPA 2001",
   "title": "Standard on Clean Agent Fire Extinguishing Systems",
   "issuing_org": "NFPA",
   "current_edition": "2025",
   "prior_editions_or_amendments": "2022",
   "category": "Industry standard",
   "scope_summary": "Clean agent total flooding design.",
   "book_chapters": "16",
   "source_url": "https://webstore.ansi.org/standards/nfpa/nfpa20012025",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller confirmation."
  },
  {
   "id": "STD-215",
   "designation": "NFPA 790",
   "title": "Standard for Competency of Third-Party Field Evaluation Bodies",
   "issuing_org": "NFPA",
   "current_edition": "2024 believed; not confirmed",
   "prior_editions_or_amendments": "2021",
   "category": "Industry standard",
   "scope_summary": "Competency of field evaluation bodies.",
   "book_chapters": "41;42",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Searched; no result."
  },
  {
   "id": "STD-216",
   "designation": "NFPA 791",
   "title": "Recommended Practice and Procedures for Unlabeled Electrical Equipment Evaluation",
   "issuing_org": "NFPA",
   "current_edition": "2024 believed; not confirmed",
   "prior_editions_or_amendments": "2021",
   "category": "Recommended practice",
   "scope_summary": "Field evaluation of unlisted electrical equipment.",
   "book_chapters": "42",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Searched; no result."
  },
  {
   "id": "STD-217",
   "designation": "ISO 3046-1:2002",
   "title": "Reciprocating Internal Combustion Engines - Performance - Part 1: Declarations of Power, Fuel and Lubricating Oil Consumptions, and Test Methods",
   "issuing_org": "ISO TC 70",
   "current_edition": "Edition 5 (2002); confirmed 2020; Edition 6 at DIS",
   "prior_editions_or_amendments": "1995",
   "category": "Industry standard",
   "scope_summary": "Reference conditions for engine rating.",
   "book_chapters": "11",
   "source_url": "https://www.iso.org/standard/28330.html",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "ISO page."
  },
  {
   "id": "STD-218",
   "designation": "ISO 8528-3:2020",
   "title": "Reciprocating Internal Combustion Engine Driven Alternating Current Generating Sets - Part 3: Alternating Current Generators for Generating Sets",
   "issuing_org": "ISO TC 70",
   "current_edition": "Edition 3 (2020-10); reconfirmed 2026",
   "prior_editions_or_amendments": "2012",
   "category": "Industry standard",
   "scope_summary": "Generator characteristics for gensets.",
   "book_chapters": "11",
   "source_url": "https://www.iso.org/standard/77444.html",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "ISO page."
  },
  {
   "id": "STD-219",
   "designation": "ISO 14687:2019",
   "title": "Hydrogen Fuel Quality - Product Specification",
   "issuing_org": "ISO TC 197",
   "current_edition": "2019 (consolidates former -1, -2, -3)",
   "prior_editions_or_amendments": "ISO 14687-1/-2/-3",
   "category": "Industry standard",
   "scope_summary": "Hydrogen purity grades.",
   "book_chapters": "12",
   "source_url": "https://observatory.clean-hydrogen.europa.eu/hydrogen-landscape/policies-and-standards/codes-and-standards/code-and-standard/iso-146872019",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Status conflicting across catalogs; revision in progress."
  },
  {
   "id": "STD-220",
   "designation": "ISO 6469-1",
   "title": "Electrically Propelled Road Vehicles - Safety Specifications - Part 1: Rechargeable Energy Storage System (RESS)",
   "issuing_org": "ISO TC 22",
   "current_edition": "2019 believed; not confirmed",
   "prior_editions_or_amendments": "2009",
   "category": "Industry standard",
   "scope_summary": "EV battery safety (100/500 ohm/V isolation basis).",
   "book_chapters": "16",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Search returned nothing."
  },
  {
   "id": "STD-221",
   "designation": "ISO 9613-2:2024",
   "title": "Acoustics - Attenuation of Sound During Propagation Outdoors - Part 2: Engineering Method for the Prediction of Sound Pressure Levels Outdoors",
   "issuing_org": "ISO TC 43",
   "current_edition": "2024 (replaced 1996)",
   "prior_editions_or_amendments": "ISO 9613-2:1996",
   "category": "Industry standard",
   "scope_summary": "Outdoor noise propagation (63 Hz to 8 kHz).",
   "book_chapters": "36",
   "source_url": "https://www.iso.org/standard/74047.html",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "ISO page. Authors using 1996 equations must check 2024 changes."
  },
  {
   "id": "STD-222",
   "designation": "ISO 2533:1975",
   "title": "Standard Atmosphere",
   "issuing_org": "ISO TC 20",
   "current_edition": "1975 (Add 1 1985, Add 2 1997)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Standard atmosphere for altitude derating.",
   "book_chapters": "10",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-223",
   "designation": "ISO 15118-20:2022",
   "title": "Road Vehicles - Vehicle to Grid Communication Interface - Part 20: 2nd Generation Network and Application Layer Requirements",
   "issuing_org": "ISO TC 22 / IEC TC 69",
   "current_edition": "2022 (published 2022-04-25); Amendment 1 (AC DER, MCS) in progress/2026",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Bidirectional V2G messaging.",
   "book_chapters": "8",
   "source_url": "https://www.iso.org/es/contents/data/standard/07/78/77845.html",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "ISO page."
  },
  {
   "id": "STD-224",
   "designation": "ISO 11898",
   "title": "Road Vehicles - Controller Area Network (CAN)",
   "issuing_org": "ISO TC 22",
   "current_edition": "Multi-part; editions vary",
   "prior_editions_or_amendments": "Per part",
   "category": "Industry standard",
   "scope_summary": "CAN bus.",
   "book_chapters": "31",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-225",
   "designation": "SAE J537_202309",
   "title": "Storage Batteries",
   "issuing_org": "SAE",
   "current_edition": "J537_202309 (September 2023)",
   "prior_editions_or_amendments": "J537_201604",
   "category": "Industry standard",
   "scope_summary": "12 V starting battery ratings (CCA at -18 C).",
   "book_chapters": "23",
   "source_url": "https://saemobilus.sae.org/content/J537_202309",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "SAE Mobilus page."
  },
  {
   "id": "STD-226",
   "designation": "SAE J3271",
   "title": "Megawatt Charging System (MCS) for Electric Vehicles",
   "issuing_org": "SAE",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "MCS connector (up to ~3.75 MW).",
   "book_chapters": "8",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Search found only the Sandia presentation."
  },
  {
   "id": "STD-227",
   "designation": "SAE J3072_202406",
   "title": "Interconnection Requirements for Onboard, Grid Support Inverter Systems",
   "issuing_org": "SAE",
   "current_edition": "J3072_202406 (June 2024)",
   "prior_editions_or_amendments": "J3072_202103 (superseded 2024-06-17)",
   "category": "Industry standard",
   "scope_summary": "EV on-board inverter grid support (with 1547-2018, 1547.1-2020).",
   "book_chapters": "8",
   "source_url": "https://store.sfs.fi/en/sae-j3072_202406",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller listing; used with UL 1741 SB-based certification."
  },
  {
   "id": "STD-228",
   "designation": "SAE J1939",
   "title": "Serial Control and Communications Heavy Duty Vehicle Network",
   "issuing_org": "SAE",
   "current_edition": "Multi-document series",
   "prior_editions_or_amendments": "Per document",
   "category": "Industry standard",
   "scope_summary": "Engine/genset ECU CAN.",
   "book_chapters": "31",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-229",
   "designation": "ANSI/ASQ Z1.4",
   "title": "Sampling Procedures and Tables for Inspection by Attributes",
   "issuing_org": "ASQ",
   "current_edition": "2003 (R2018) believed",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Acceptance sampling.",
   "book_chapters": "45",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-230",
   "designation": "NEMA MG 1 (ANSI/NEMA MG 00001-2024)",
   "title": "Motors and Generators",
   "issuing_org": "NEMA",
   "current_edition": "ANSI/NEMA MG 00001-2024 (active); MG 1-2021 (published 2022-06-29) superseded 2025",
   "prior_editions_or_amendments": "MG 1-2021; 2018; 2016",
   "category": "Industry standard",
   "scope_summary": "Motor/generator ratings; 1.33 pu V/Hz limit.",
   "book_chapters": "3;6;11;18;22;appC;exD",
   "source_url": "https://www.nema.org/Standards/view/Motors-and-Generators",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Authors citing MG 1-2021 should update to MG 00001-2024; check that the 1.33 pu V/Hz clause survived renumbering."
  },
  {
   "id": "STD-231",
   "designation": "NEMA 250",
   "title": "Enclosures for Electrical Equipment (1000 Volts Maximum)",
   "issuing_org": "NEMA",
   "current_edition": "2020 believed; not confirmed",
   "prior_editions_or_amendments": "2018",
   "category": "Industry standard",
   "scope_summary": "NEMA enclosure types.",
   "book_chapters": "16",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-232",
   "designation": "ASHRAE Guideline 14-2023",
   "title": "Measurement of Energy, Demand, and Water Savings (retitled Measurement and Verification of Energy, Demand, and Water Savings by Addendum a, 2025-10-29)",
   "issuing_org": "ASHRAE",
   "current_edition": "2023 (dated 2023-08-01; errata 2024-05-10; Addendum a 2025-10-29)",
   "prior_editions_or_amendments": "Guideline 14-2014",
   "category": "Guide",
   "scope_summary": "M&V: CV(RMSE) and NMBE calibration criteria.",
   "book_chapters": "5;7;34;47;appC",
   "source_url": "https://www.ashrae.org/file%20library/technical%20resources/standards%20and%20guidelines/standards%20addenda/g14_2023_a_20251029.pdf",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "Confirms the reviewer's belief; authors citing 14-2014 must update. Verify criteria (15%/30%, 5%/10%) unchanged in 2023 text."
  },
  {
   "id": "STD-233",
   "designation": "ASHRAE Handbook",
   "title": "ASHRAE Handbook (Fundamentals; HVAC Applications; etc.)",
   "issuing_org": "ASHRAE",
   "current_edition": "Four-volume cycle; cite volume and year",
   "prior_editions_or_amendments": "Per volume",
   "category": "Guide",
   "scope_summary": "Reference data.",
   "book_chapters": "7;9;48;appA;bibliography",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Cite the edition used."
  },
  {
   "id": "STD-234",
   "designation": "ASCE/SEI 7-22",
   "title": "Minimum Design Loads and Associated Criteria for Buildings and Other Structures",
   "issuing_org": "ASCE/SEI",
   "current_edition": "7-22 (current); ASCE 7-28 expected 2028",
   "prior_editions_or_amendments": "7-16; 7-10",
   "category": "Industry standard",
   "scope_summary": "Wind, snow, seismic loads.",
   "book_chapters": "33;36",
   "source_url": "https://basc.pnnl.gov/library/minimum-design-loads-and-associated-criteria-buildings-and-other-structures-ascesei-7-22",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Adopted edition governs. 7-22 vs 7-16 equation differences remain for authors."
  },
  {
   "id": "STD-235",
   "designation": "AACE RP 18R-97",
   "title": "Cost Estimate Classification System - As Applied in Engineering, Procurement, and Construction for the Process Industries",
   "issuing_org": "AACE International",
   "current_edition": "18R-97 (revision date to confirm)",
   "prior_editions_or_amendments": "17R-97 (generic)",
   "category": "Recommended practice",
   "scope_summary": "Class 5 to Class 1 estimates.",
   "book_chapters": "37",
   "source_url": "https://library.aacei.org/pgd01/pgd01.shtml",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Excludes power generating facilities and HV transmission; reconsider as basis for DER cost classes."
  },
  {
   "id": "STD-236",
   "designation": "AACE RP 56R-08",
   "title": "Cost Estimate Classification System - As Applied for the Building and General Construction Industries",
   "issuing_org": "AACE International",
   "current_edition": "56R-08",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "Building/general construction estimate classes.",
   "book_chapters": "37",
   "source_url": "https://library.aacei.org/pgd01/pgd01.shtml",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "NOT a power-generation RP (author's descriptor wrong). AACE lists 115R-21 (nuclear) and 69R-12 (hydro); no DER-specific RP found."
  },
  {
   "id": "STD-237",
   "designation": "ICEA P-32-382",
   "title": "Short-Circuit Characteristics of Insulated Cable",
   "issuing_org": "ICEA",
   "current_edition": "2007 (R2018)",
   "prior_editions_or_amendments": "2007 (R2013)",
   "category": "Industry standard",
   "scope_summary": "Cable withstand constants.",
   "book_chapters": "28",
   "source_url": "https://shop.standards.ie/en-ie/standards/icea-p-32-382-2007-r2018--561263_saig_icea_icea_1279842",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller listing; constants not checked."
  },
  {
   "id": "STD-238",
   "designation": "ASTM B258",
   "title": "Standard Specification for Nominal Diameters and Cross-Sectional Areas of AWG Sizes of Solid Round Wires Used as Electrical Conductors",
   "issuing_org": "ASTM",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "AWG dimensions.",
   "book_chapters": "appA",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-239",
   "designation": "ASTM B230/B230M",
   "title": "Standard Specification for Aluminum 1350-H19 Wire for Electrical Purposes",
   "issuing_org": "ASTM",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "1350 aluminum wire.",
   "book_chapters": "appA",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-240",
   "designation": "ASTM D975",
   "title": "Standard Specification for Diesel Fuel",
   "issuing_org": "ASTM",
   "current_edition": "Revised periodically; cite the dated revision",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "Diesel grades.",
   "book_chapters": "11;24;appC",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Not found in search."
  },
  {
   "id": "STD-241",
   "designation": "ASTM D6469",
   "title": "Standard Guide for Microbial Contamination in Fuels and Fuel Systems",
   "issuing_org": "ASTM",
   "current_edition": "D6469-20 per ANSI store (-17 historical); later revision not checked",
   "prior_editions_or_amendments": "D6469-17",
   "category": "Guide",
   "scope_summary": "Fuel microbial contamination.",
   "book_chapters": "24",
   "source_url": "https://webstore.ansi.org/standards/astm/astmd646920",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Check ASTM for newer revision."
  },
  {
   "id": "STD-242",
   "designation": "ASTM E917",
   "title": "Standard Practice for Measuring Life-Cycle Costs of Buildings and Building Systems",
   "issuing_org": "ASTM",
   "current_edition": "E917-17 believed; not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Recommended practice",
   "scope_summary": "LCC method.",
   "book_chapters": "37",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-243",
   "designation": "JCGM 100:2008 (GUM)",
   "title": "Evaluation of Measurement Data - Guide to the Expression of Uncertainty in Measurement",
   "issuing_org": "JCGM/BIPM",
   "current_edition": "2008 (corrected 2010 version)",
   "prior_editions_or_amendments": "1995",
   "category": "Guide",
   "scope_summary": "Measurement uncertainty.",
   "book_chapters": "33;46;47;bibliography",
   "source_url": "https://www.bipm.org/en/committees/jc/jcgm/publications",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Not opened in search; BIPM page not retrieved."
  },
  {
   "id": "STD-244",
   "designation": "ANSI/ISA-18.2-2016",
   "title": "Management of Alarm Systems for the Process Industries",
   "issuing_org": "ISA",
   "current_edition": "2016",
   "prior_editions_or_amendments": "ANSI/ISA-18.2-2009",
   "category": "Industry standard",
   "scope_summary": "Alarm lifecycle; basis for IEC 62682.",
   "book_chapters": "48;appC",
   "source_url": "https://shop.standards.ie/en-ie/standards/ansi-isa-18-2-2016-575481_saig_isa_isa_1316941",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller confirmation."
  },
  {
   "id": "STD-245",
   "designation": "EEMUA 191",
   "title": "Alarm Systems - A Guide to Design, Management and Procurement",
   "issuing_org": "EEMUA",
   "current_edition": "Edition 3 (2013)",
   "prior_editions_or_amendments": "Edition 2 2007",
   "category": "Guide",
   "scope_summary": "Alarm performance metrics.",
   "book_chapters": "48;appC",
   "source_url": "https://shop.standards.ie/en-ie/standards/eemua-191-2013-494362_saig_eemua_eemua_1106464",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Reseller confirmation."
  },
  {
   "id": "STD-246",
   "designation": "NERC PRC-006",
   "title": "Automatic Underfrequency Load Shedding",
   "issuing_org": "NERC",
   "current_edition": "PRC-006-5 believed current (filed with FERC; WECC variance update in progress 2026)",
   "prior_editions_or_amendments": "PRC-006-1 (FERC Order 763, 2012)",
   "category": "Regulatory rule",
   "scope_summary": "UFLS program design and documentation.",
   "book_chapters": "32",
   "source_url": "https://www.nerc.com/FilingsOrders/us/NERC%20Filings%20to%20FERC%20DL/PRC-006-5_FinalFiled.pdf",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Effective date not confirmed; check NERC list."
  },
  {
   "id": "STD-247",
   "designation": "FERC Order No. 2006",
   "title": "Standardization of Small Generator Interconnection Agreements and Procedures",
   "issuing_org": "FERC",
   "current_edition": "Issued 2005-05-12",
   "prior_editions_or_amendments": "Order 792 (2013) revised SGIP",
   "category": "Regulatory rule",
   "scope_summary": "SGIP/SGIA for generators up to 20 MW.",
   "book_chapters": "36;bibliography",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Date from knowledge."
  },
  {
   "id": "STD-248",
   "designation": "FERC Order No. 792",
   "title": "Small Generator Interconnection Agreements and Procedures",
   "issuing_org": "FERC",
   "current_edition": "Issued 2013-11-22",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "SGIP revisions (storage included).",
   "book_chapters": "36;bibliography",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Date from knowledge."
  },
  {
   "id": "STD-249",
   "designation": "FERC Order No. 755",
   "title": "Frequency Regulation Compensation in the Organized Wholesale Power Markets",
   "issuing_org": "FERC",
   "current_edition": "Issued 2011-10-20",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "Pay-for-performance regulation.",
   "book_chapters": "40;bibliography",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Date from knowledge."
  },
  {
   "id": "STD-250",
   "designation": "49 CFR 173.185",
   "title": "Lithium Cells and Batteries (DOT HMR)",
   "issuing_org": "US DOT PHMSA",
   "current_edition": "Current CFR",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "Lithium battery shipping; requires UN 38.3.",
   "book_chapters": "45;bibliography",
   "source_url": "https://www.ecfr.gov/current/title-49/subtitle-B/chapter-I/subchapter-C/part-173/subpart-E/section-173.185",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "eCFR section exists; current text not read."
  },
  {
   "id": "STD-251",
   "designation": "UN Manual of Tests and Criteria, subsection 38.3",
   "title": "UN Manual of Tests and Criteria - Part III, Subsection 38.3 (Lithium Batteries)",
   "issuing_org": "United Nations",
   "current_edition": "8th revised edition (2023) per vendors; US 49 CFR 171.7 may still incorporate 7th rev. ed. (2019) + Amd 1 (2021)",
   "prior_editions_or_amendments": "7th rev. ed.",
   "category": "Test method",
   "scope_summary": "Transport tests T1-T8.",
   "book_chapters": "42;45",
   "source_url": "https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2025-11/25-0146_30day.pdf",
   "verification_status": "partial",
   "verified_date": "2026-11-09",
   "notes": "Test summary must cite the edition used; US adoption status of the 8th edition unresolved."
  },
  {
   "id": "STD-252",
   "designation": "OSHA 29 CFR 1910.147",
   "title": "The Control of Hazardous Energy (Lockout/Tagout)",
   "issuing_org": "US OSHA",
   "current_edition": "Final rule 1989-09-01 (54 FR 36644); current CFR",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "LOTO procedures for general industry.",
   "book_chapters": "44;48;bibliography",
   "source_url": "https://osha.gov/control-hazardous-energy/standards",
   "verification_status": "verified-web",
   "verified_date": "2026-11-09",
   "notes": "OSHA page."
  },
  {
   "id": "STD-253",
   "designation": "10 CFR Part 431 (distribution transformers)",
   "title": "DOE Energy Conservation Standards - Commercial and Industrial Equipment (distribution transformers, Subpart K)",
   "issuing_org": "US DOE",
   "current_edition": "Current CFR",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "Transformer minimum efficiency.",
   "book_chapters": "20;bibliography",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-254",
   "designation": "18 CFR 292.205",
   "title": "PURPA Criteria for Qualifying Cogeneration Facilities",
   "issuing_org": "FERC",
   "current_edition": "Current CFR",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "QF efficiency standard.",
   "book_chapters": "12;bibliography",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-255",
   "designation": "UN ECE Regulation No. 100",
   "title": "Uniform Provisions Concerning Approval of Vehicles with Regard to Specific Requirements for the Electric Power Train",
   "issuing_org": "UNECE",
   "current_edition": "Revision not confirmed",
   "prior_editions_or_amendments": "None",
   "category": "Regulatory rule",
   "scope_summary": "EV electrical safety.",
   "book_chapters": "16",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-256",
   "designation": "ANSI/ACP 101-1",
   "title": "Small Wind Turbine Performance and Safety Standard (successor to AWEA 9.1)",
   "issuing_org": "ACP",
   "current_edition": "Edition not confirmed",
   "prior_editions_or_amendments": "AWEA 9.1-2009",
   "category": "Industry standard",
   "scope_summary": "Small wind rating and safety.",
   "book_chapters": "10",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Title from memory; flagged by author."
  },
  {
   "id": "STD-257",
   "designation": "ANSI/CSA FC 1",
   "title": "Stationary Fuel Cell Power Systems",
   "issuing_org": "CSA Group",
   "current_edition": "Edition not confirmed (US adoption of IEC 62282-3-100)",
   "prior_editions_or_amendments": "None",
   "category": "Product certification standard",
   "scope_summary": "US fuel cell safety.",
   "book_chapters": "12",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-258",
   "designation": "IRIG Standard 200",
   "title": "IRIG Serial Time Code Formats",
   "issuing_org": "Range Commanders Council",
   "current_edition": "Edition not confirmed (200-04 / 200-16 believed)",
   "prior_editions_or_amendments": "None",
   "category": "Industry standard",
   "scope_summary": "IRIG-B time codes.",
   "book_chapters": "29;31;46",
   "source_url": "",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "From knowledge; not searched."
  },
  {
   "id": "STD-259",
   "designation": "OpenADR 3.0",
   "title": "OpenADR 3.0 Specification",
   "issuing_org": "OpenADR Alliance",
   "current_edition": "3.0.x (Alliance spec; not an IEC part per search)",
   "prior_editions_or_amendments": "OpenADR 2.0b (IEC 62746-10-1)",
   "category": "Industry standard",
   "scope_summary": "REST demand response API.",
   "book_chapters": "8",
   "source_url": "https://www.openadr.org/",
   "verification_status": "unverified",
   "verified_date": "",
   "notes": "Version not confirmed."
  }
 ],
 "handbook_bibliography": [
  {
   "key": "Adibi 2000",
   "authors_or_org": "Adibi, M. M., ed.",
   "year": "2000",
   "title": "Power System Restoration: Methodologies and Implementation Strategies",
   "publisher_or_series": "IEEE Press / Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 23",
   "needs_verification": "no"
  },
  {
   "key": "Sandia 2015 | Sandia SAND2015-1002",
   "authors_or_org": "Akhil, A. A., et al.",
   "year": "2015",
   "title": "DOE/EPRI Electricity Storage Handbook in Collaboration with NRECA",
   "publisher_or_series": "Sandia National Laboratories, SAND2015-1002.",
   "report_number": "SAND2015-1002",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 14, 15, 33, 38",
   "needs_verification": "no"
  },
  {
   "key": "Ammerman et al. 2010",
   "authors_or_org": "Ammerman, R. F., Gammon, T., Sen, P. K., and Nelson, J. P.",
   "year": "2010",
   "title": "DC-arc models and incident-energy calculations",
   "publisher_or_series": "IEEE Transactions on Industry Applications, 46(5).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 28",
   "needs_verification": "no"
  },
  {
   "key": "P.L. 119-21",
   "authors_or_org": "An Act to provide for reconciliation pursuant to title II of H. Con. Res. 14, Public Law 119-21",
   "year": "2025",
   "title": "",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 39",
   "needs_verification": "no"
  },
  {
   "key": "Anders 1997",
   "authors_or_org": "Anders, G. J.",
   "year": "1997",
   "title": "Rating of Electric Power Cables: Ampacity Computations for Transmission, Distribution, and Industrial Applications",
   "publisher_or_series": "IEEE Press / McGraw-Hill.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 20",
   "needs_verification": "no"
  },
  {
   "key": "Anderson 1995",
   "authors_or_org": "Anderson, P. M.",
   "year": "1995",
   "title": "Analysis of Faulted Power Systems",
   "publisher_or_series": "IEEE Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 25",
   "needs_verification": "no"
  },
  {
   "key": "Anderson & Mirheydar 1990",
   "authors_or_org": "Anderson, P. M., and Mirheydar, M.",
   "year": "1990",
   "title": "A low-order system frequency response model",
   "publisher_or_series": "IEEE Transactions on Power Systems, 5(3).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 18",
   "needs_verification": "no"
  },
  {
   "key": "ANL GREET",
   "authors_or_org": "Argonne National Laboratory",
   "year": "",
   "title": "GREET Model: Fuel Specifications (lower and higher heating values and densities of fuels)",
   "publisher_or_series": "U.S. Department of Energy.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "App. A",
   "needs_verification": "yes"
  },
  {
   "key": "ASHRAE Handbook—Fundamentals",
   "authors_or_org": "ASHRAE",
   "year": "",
   "title": "ASHRAE Handbook—Fundamentals",
   "publisher_or_series": "Edition per project.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 48",
   "needs_verification": "yes"
  },
  {
   "key": "Barley & Winn 1996",
   "authors_or_org": "Barley, C. D., and Winn, C. B.",
   "year": "1996",
   "title": "Optimal Dispatch Strategy in Remote Hybrid Power Systems | Optimal dispatch strategy in remote hybrid power systems",
   "publisher_or_series": "Solar Energy 58(4–6).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 24; Ex. C",
   "needs_verification": "no"
  },
  {
   "key": "Barlow & Proschan 1965",
   "authors_or_org": "Barlow, R. E., and Proschan, F.",
   "year": "1965",
   "title": "Mathematical Theory of Reliability",
   "publisher_or_series": "Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 48",
   "needs_verification": "no"
  },
  {
   "key": "Bernardi et al. 1985",
   "authors_or_org": "Bernardi, D., Pawlikowski, E., Newman, J.",
   "year": "1985",
   "title": "A General Energy Balance for Battery Systems",
   "publisher_or_series": "Journal of The Electrochemical Society, 132(1).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 13, 14",
   "needs_verification": "no"
  },
  {
   "key": "Bidram & Davoudi 2012",
   "authors_or_org": "Bidram, A., and Davoudi, A.",
   "year": "2012",
   "title": "Hierarchical structure of microgrids control system",
   "publisher_or_series": "IEEE Transactions on Smart Grid, 3(4), 1963–1976.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 29",
   "needs_verification": "no"
  },
  {
   "key": "Billinton & Allan 1992",
   "authors_or_org": "Billinton, R., and Allan, R. N.",
   "year": "1992",
   "title": "Reliability Evaluation of Engineering Systems: Concepts and Techniques",
   "publisher_or_series": "2nd ed. Plenum Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 35",
   "needs_verification": "no"
  },
  {
   "key": "Billinton & Allan 1996",
   "authors_or_org": "Billinton, R., and Allan, R. N.",
   "year": "1996",
   "title": "Reliability Evaluation of Power Systems",
   "publisher_or_series": "2nd ed. Plenum Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 34, 35",
   "needs_verification": "no"
  },
  {
   "key": "Blackburn & Domin 2014",
   "authors_or_org": "Blackburn, J. L., and Domin, T. J.",
   "year": "2014",
   "title": "Protective Relaying: Principles and Applications",
   "publisher_or_series": "4th ed. CRC Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 20, 22, 25, 26, 27, 28",
   "needs_verification": "no"
  },
  {
   "key": "Bolinger & Bolinger 2022",
   "authors_or_org": "Bolinger, M., Bolinger, G.",
   "year": "2022",
   "title": "Land Requirements for Utility-Scale PV: An Empirical Update on Power and Energy Density",
   "publisher_or_series": "IEEE Journal of Photovoltaics 12(2).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9",
   "needs_verification": "no"
  },
  {
   "key": "Bollen 2000",
   "authors_or_org": "Bollen, M. H. J.",
   "year": "2000",
   "title": "Understanding Power Quality Problems: Voltage Sags and Interruptions",
   "publisher_or_series": "IEEE Press / Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 3",
   "needs_verification": "no"
  },
  {
   "key": "Sandia 2004",
   "authors_or_org": "Bower, W., Whitaker, C., Erdman, W., Behnke, M., & Fitzgerald, M.",
   "year": "2004",
   "title": "Performance Test Protocol for Evaluating Inverters Used in Grid-Connected Photovoltaic Systems",
   "publisher_or_series": "Sandia National Laboratories, BEW Engineering, Endecon Engineering.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 17",
   "needs_verification": "no"
  },
  {
   "key": "Braun 2003",
   "authors_or_org": "Braun, J.E.",
   "year": "2003",
   "title": "Load Control Using Building Thermal Mass",
   "publisher_or_series": "ASME Journal of Solar Energy Engineering, 125(3).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 8",
   "needs_verification": "no"
  },
  {
   "key": "Brealey et al. 2020",
   "authors_or_org": "Brealey, R. A., Myers, S. C., and Allen, F.",
   "year": "2020",
   "title": "Principles of Corporate Finance",
   "publisher_or_series": "13th ed. McGraw-Hill Education.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 39",
   "needs_verification": "no"
  },
  {
   "key": "BIPM 2019",
   "authors_or_org": "Bureau International des Poids et Mesures",
   "year": "2019",
   "title": "The International System of Units (SI)",
   "publisher_or_series": "9th edition (SI Brochure).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 1",
   "needs_verification": "no"
  },
  {
   "key": "Burton et al. 2011",
   "authors_or_org": "Burton, T., Jenkins, N., Sharpe, D., Bossanyi, E.",
   "year": "2011",
   "title": "Wind Energy Handbook",
   "publisher_or_series": "2nd ed. Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 10",
   "needs_verification": "no"
  },
  {
   "key": "CA Rule 21 | Rule 21",
   "authors_or_org": "California Public Utilities Commission and investor-owned utilities",
   "year": "",
   "title": "Electric Rule 21, Generating Facility Interconnections",
   "publisher_or_series": "Continuously amended tariff.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 31, 36, 43",
   "needs_verification": "yes"
  },
  {
   "key": "NREL 2012",
   "authors_or_org": "Coddington, M., et al.",
   "year": "2012",
   "title": "Updating Interconnection Screens for PV System Integration",
   "publisher_or_series": "National Renewable Energy Laboratory technical report.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 36",
   "needs_verification": "no"
  },
  {
   "key": "Cole & Ramasamy 2023",
   "authors_or_org": "Cole, W., and Ramasamy, V.",
   "year": "2023",
   "title": "Cost Projections for Utility-Scale Battery Storage: 2023 Update",
   "publisher_or_series": "National Renewable Energy Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 37",
   "needs_verification": "no"
  },
  {
   "key": "PNNL & Sandia 2016",
   "authors_or_org": "Conover, D.R., et al.",
   "year": "2016",
   "title": "Protocol for Uniformly Measuring and Expressing the Performance of Energy Storage Systems",
   "publisher_or_series": "Pacific Northwest National Laboratory and Sandia National Laboratories, PNNL-22010 Rev. 2.",
   "report_number": "PNNL-22010",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 40, 46, 47",
   "needs_verification": "yes"
  },
  {
   "key": "Coughlin et al. 2008",
   "authors_or_org": "Coughlin, K., Piette, M.A., Goldman, C., Kiliccote, S.",
   "year": "2008",
   "title": "Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California",
   "publisher_or_series": "Lawrence Berkeley National Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 8",
   "needs_verification": "no"
  },
  {
   "key": "Cummins T-030",
   "authors_or_org": "Cummins Power Generation",
   "year": "",
   "title": "T-030 Application Manual: Liquid Cooled Generator Sets",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 11",
   "needs_verification": "yes"
  },
  {
   "key": "Cutler et al. 2017",
   "authors_or_org": "Cutler, D., Olis, D., Elgqvist, E., Li, X., Laws, N., DiOrio, N., Walker, A., and Anderson, K.",
   "year": "2017",
   "title": "REopt: A Platform for Energy System Integration and Optimization",
   "publisher_or_series": "National Renewable Energy Laboratory, NREL/TP-7A40-70022.",
   "report_number": "NREL/TP-7A40-70022",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 34",
   "needs_verification": "no"
  },
  {
   "key": "D'Arco & Suul 2014",
   "authors_or_org": "D'Arco, S., and Suul, J. A.",
   "year": "2014",
   "title": "Equivalence of virtual synchronous machines and frequency-droops for converter-based microgrids",
   "publisher_or_series": "IEEE Transactions on Smart Grid, 5(1).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 18",
   "needs_verification": "no"
  },
  {
   "key": "NREL 2017",
   "authors_or_org": "Denholm, P., Eichman, J., Margolis, R.",
   "year": "2017",
   "title": "Evaluating the Technical and Economic Performance of PV Plus Storage Power Plants",
   "publisher_or_series": "National Renewable Energy Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 19",
   "needs_verification": "yes"
  },
  {
   "key": "Dierauf et al. 2013",
   "authors_or_org": "Dierauf, T., Growitz, A., Kurtz, S., Becerra Cruz, J.L., Riley, E., Hansen, C.",
   "year": "2013",
   "title": "Weather-Corrected Performance Ratio",
   "publisher_or_series": "National Renewable Energy Laboratory, NREL/TP-5200-57991.",
   "report_number": "NREL/TP-5200-57991; Technical Report NREL/TP-5200-57991",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9, 47",
   "needs_verification": "yes"
  },
  {
   "key": "DNV GL 2020",
   "authors_or_org": "DNV GL",
   "year": "2020",
   "title": "McMicken Battery Energy Storage System Event Technical Analysis and Recommendations",
   "publisher_or_series": "Report for Arizona Public Service.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 16",
   "needs_verification": "no"
  },
  {
   "key": "Doan 2010",
   "authors_or_org": "Doan, D. R.",
   "year": "2010",
   "title": "Arc flash calculations for exposures to DC systems",
   "publisher_or_series": "IEEE Transactions on Industry Applications, 46(6).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 28",
   "needs_verification": "no"
  },
  {
   "key": "Dobos 2014",
   "authors_or_org": "Dobos, A.P.",
   "year": "2014",
   "title": "PVWatts Version 5 Manual",
   "publisher_or_series": "NREL Technical Report NREL/TP-6A20-62641.",
   "report_number": "Technical Report NREL/TP-6A20-62641",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9",
   "needs_verification": "no"
  },
  {
   "key": "Driesse et al. 2008",
   "authors_or_org": "Driesse, A., Jain, P., & Harrison, S.",
   "year": "2008",
   "title": "Beyond the curves: modeling the electrical efficiency of photovoltaic inverters",
   "publisher_or_series": "Proceedings of the 33rd IEEE Photovoltaic Specialists Conference.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 17",
   "needs_verification": "no"
  },
  {
   "key": "Duffie & Beckman 2013",
   "authors_or_org": "Duffie, J.A., Beckman, W.A.",
   "year": "2013",
   "title": "Solar Engineering of Thermal Processes",
   "publisher_or_series": "4th ed. Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9",
   "needs_verification": "no"
  },
  {
   "key": "Dugan et al. 2012",
   "authors_or_org": "Dugan, R. C., McGranaghan, M. F., Santoso, S., and Beaty, H. W.",
   "year": "2012",
   "title": "Electrical Power Systems Quality",
   "publisher_or_series": "3rd ed. McGraw-Hill.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 2, 3",
   "needs_verification": "no"
  },
  {
   "key": "Dwight 1936",
   "authors_or_org": "Dwight, H. B.",
   "year": "1936",
   "title": "Calculation of Resistances to Ground",
   "publisher_or_series": "Electrical Engineering (AIEE), vol. 55.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 27",
   "needs_verification": "no"
  },
  {
   "key": "Eddy et al. 2017",
   "authors_or_org": "Eddy, J., Miner, N. E., and Stamp, J.",
   "year": "2017",
   "title": "Sandia's Microgrid Design Toolkit",
   "publisher_or_series": "The Electricity Journal 30(4).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 34",
   "needs_verification": "no"
  },
  {
   "key": "EVO 2022",
   "authors_or_org": "Efficiency Valuation Organization",
   "year": "2022",
   "title": "International Performance Measurement and Verification Protocol (IPMVP): Core Concepts",
   "publisher_or_series": "EVO.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 5, 47",
   "needs_verification": "no"
  },
  {
   "key": "EPRI 2021",
   "authors_or_org": "EPRI",
   "year": "2021",
   "title": "Common File Format for Distributed Energy Resources Settings Exchange and Storage",
   "publisher_or_series": "Electric Power Research Institute.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 43",
   "needs_verification": "no"
  },
  {
   "key": "EPRI 2024",
   "authors_or_org": "EPRI",
   "year": "2024",
   "title": "Insights from EPRI's Battery Energy Storage Systems (BESS) Failure Incident Database: Analysis of Failure Root Cause",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 48",
   "needs_verification": "no"
  },
  {
   "key": "ESHA 2004",
   "authors_or_org": "European Small Hydropower Association",
   "year": "2004",
   "title": "Guide on How to Develop a Small Hydropower Plant",
   "publisher_or_series": "ESHA.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 10",
   "needs_verification": "no"
  },
  {
   "key": "Faiman 2008",
   "authors_or_org": "Faiman, D.",
   "year": "2008",
   "title": "Assessing the Outdoor Operating Temperature of Photovoltaic Modules",
   "publisher_or_series": "Progress in Photovoltaics 16(4).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9",
   "needs_verification": "no"
  },
  {
   "key": "FERC Order 2006",
   "authors_or_org": "Federal Energy Regulatory Commission",
   "year": "2005",
   "title": "Standardization of Small Generator Interconnection Agreements and Procedures",
   "publisher_or_series": "Order No. 2006.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 36",
   "needs_verification": "no"
  },
  {
   "key": "FERC Order 755",
   "authors_or_org": "Federal Energy Regulatory Commission",
   "year": "2011",
   "title": "Frequency Regulation Compensation in the Organized Wholesale Power Markets",
   "publisher_or_series": "Order No. 755.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 40",
   "needs_verification": "no"
  },
  {
   "key": "FERC Order 792",
   "authors_or_org": "Federal Energy Regulatory Commission",
   "year": "2013",
   "title": "Small Generator Interconnection Agreements and Procedures",
   "publisher_or_series": "Order No. 792.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 36",
   "needs_verification": "no"
  },
  {
   "key": "FERC Order 841",
   "authors_or_org": "Federal Energy Regulatory Commission",
   "year": "2018",
   "title": "Electric Storage Participation in Markets Operated by Regional Transmission Organizations and Independent System Operators",
   "publisher_or_series": "Order No. 841.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 40",
   "needs_verification": "no"
  },
  {
   "key": "FERC Order 2222 | FERC Order No. 2222",
   "authors_or_org": "Federal Energy Regulatory Commission",
   "year": "2020",
   "title": "Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators",
   "publisher_or_series": "Order No. 2222.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 8, 40",
   "needs_verification": "no"
  },
  {
   "key": "Feng et al. 2018",
   "authors_or_org": "Feng, X., Ouyang, M., Liu, X., Lu, L., Xia, Y., He, X.",
   "year": "2018",
   "title": "Thermal Runaway Mechanism of Lithium Ion Battery for Electric Vehicles: A Review",
   "publisher_or_series": "Energy Storage Materials 10.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 13",
   "needs_verification": "no"
  },
  {
   "key": "Fisher 1930",
   "authors_or_org": "Fisher, I.",
   "year": "1930",
   "title": "The Theory of Interest",
   "publisher_or_series": "Macmillan.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 39",
   "needs_verification": "no"
  },
  {
   "key": "RMI 2015",
   "authors_or_org": "Fitzgerald, G., Mandel, J., Morris, J., Touati, H.",
   "year": "2015",
   "title": "The Economics of Battery Energy Storage: How Multi-Use, Customer-Sited Batteries Deliver the Most Services and Value to Customers and the Grid",
   "publisher_or_series": "Rocky Mountain Institute.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 38",
   "needs_verification": "no"
  },
  {
   "key": "NIST HB 135 | NIST Handbook 135",
   "authors_or_org": "Fuller, S. K., and Petersen, S. R.",
   "year": "1996",
   "title": "Life-Cycle Costing Manual for the Federal Energy Management Program",
   "publisher_or_series": "NIST Handbook 135, National Institute of Standards and Technology.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 37, 39",
   "needs_verification": "no"
  },
  {
   "key": "Giraldez et al. 2018",
   "authors_or_org": "Giraldez, J., et al.",
   "year": "2018",
   "title": "Phase I Microgrid Cost Study: Data Collection and Analysis of Microgrid Costs in the United States",
   "publisher_or_series": "National Renewable Energy Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 37",
   "needs_verification": "no"
  },
  {
   "key": "Glover et al. 2017",
   "authors_or_org": "Glover, J. D., Overbye, T. J., & Sarma, M. S.",
   "year": "2017",
   "title": "Power System Analysis and Design",
   "publisher_or_series": "6th ed. Cengage Learning.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 2, 4, 25",
   "needs_verification": "no"
  },
  {
   "key": "Grainger & Stevenson 1994",
   "authors_or_org": "Grainger, J. J., & Stevenson, W. D.",
   "year": "1994",
   "title": "Power System Analysis",
   "publisher_or_series": "McGraw-Hill.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 2, 4, 25",
   "needs_verification": "no"
  },
  {
   "key": "Guerrero et al. 2011",
   "authors_or_org": "Guerrero, J. M., Vasquez, J. C., Matas, J., de Vicuña, L. G., and Castilla, M.",
   "year": "2011",
   "title": "Hierarchical control of droop-controlled AC and DC microgrids: a general approach toward standardization",
   "publisher_or_series": "IEEE Transactions on Industrial Electronics, 58(1), 158–172.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 29, 30",
   "needs_verification": "no"
  },
  {
   "key": "Gönen 2014",
   "authors_or_org": "Gönen, T.",
   "year": "2014",
   "title": "Electric Power Distribution Engineering",
   "publisher_or_series": "3rd ed. CRC Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 4, 5, 20",
   "needs_verification": "no"
  },
  {
   "key": "Harlow 2012",
   "authors_or_org": "Harlow, J. H., ed.",
   "year": "2012",
   "title": "Electric Power Transformer Engineering",
   "publisher_or_series": "3rd ed. CRC Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 20",
   "needs_verification": "no"
  },
  {
   "key": "Rule 14H",
   "authors_or_org": "Hawaiian Electric",
   "year": "",
   "title": "Rule 14H, Interconnection of Distributed Generating Facilities",
   "publisher_or_series": "current tariff.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 43",
   "needs_verification": "yes"
  },
  {
   "key": "Hong & Fan 2016",
   "authors_or_org": "Hong, T., and Fan, S.",
   "year": "2016",
   "title": "Probabilistic electric load forecasting: A tutorial review",
   "publisher_or_series": "International Journal of Forecasting 32(3).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 7",
   "needs_verification": "no"
  },
  {
   "key": "Hunter & Elliot 1994",
   "authors_or_org": "Hunter, R., and Elliot, G. (eds.)",
   "year": "1994",
   "title": "Wind-Diesel Systems: A Guide to the Technology and Its Implementation",
   "publisher_or_series": "Cambridge University Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 24",
   "needs_verification": "no"
  },
  {
   "key": "Hyndman & Athanasopoulos 2021",
   "authors_or_org": "Hyndman, R. J., and Athanasopoulos, G.",
   "year": "2021",
   "title": "Forecasting: Principles and Practice",
   "publisher_or_series": "3rd ed. OTexts.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 7, 32",
   "needs_verification": "no"
  },
  {
   "key": "IEA PVPS 2002",
   "authors_or_org": "IEA PVPS Task 5",
   "year": "2002",
   "title": "Evaluation of Islanding Detection Methods for Photovoltaic Utility-Interactive Power Systems",
   "publisher_or_series": "Report IEA-PVPS T5-09:2002.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 22",
   "needs_verification": "no"
  },
  {
   "key": "Ihara & Schweppe 1981",
   "authors_or_org": "Ihara, S., and Schweppe, F. C.",
   "year": "1981",
   "title": "\"Physically Based Modeling of Cold Load Pickup.\"",
   "publisher_or_series": "IEEE Transactions on Power Apparatus and Systems, PAS-100(9).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 23",
   "needs_verification": "no"
  },
  {
   "key": "Incropera et al. 2007",
   "authors_or_org": "Incropera, F.P., DeWitt, D.P., Bergman, T.L. and Lavine, A.S.",
   "year": "2007",
   "title": "Fundamentals of Heat and Mass Transfer",
   "publisher_or_series": "6th ed. Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "App. A",
   "needs_verification": "no"
  },
  {
   "key": "P.L. 117-169",
   "authors_or_org": "Inflation Reduction Act of 2022, Public Law 117-169",
   "year": "2022",
   "title": "",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 39",
   "needs_verification": "no"
  },
  {
   "key": "ITI 2000 | ITIC 2000",
   "authors_or_org": "Information Technology Industry Council",
   "year": "2000",
   "title": "ITI (CBEMA) Curve Application Note",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 6, 22; Ex. B",
   "needs_verification": "no"
  },
  {
   "key": "IRS Pub 946",
   "authors_or_org": "Internal Revenue Service (annual)",
   "year": "",
   "title": "Publication 946, How to Depreciate Property",
   "publisher_or_series": "U.S. Department of the Treasury.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 39",
   "needs_verification": "yes"
  },
  {
   "key": "IATA DGR",
   "authors_or_org": "International Air Transport Association",
   "year": "",
   "title": "Dangerous Goods Regulations",
   "publisher_or_series": "current annual edition, Packing Instructions 965–967.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 45",
   "needs_verification": "yes"
  },
  {
   "key": "IREC 2017",
   "authors_or_org": "Interstate Renewable Energy Council",
   "year": "2017",
   "title": "Key Decisions for Hosting Capacity Analyses",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 36",
   "needs_verification": "no"
  },
  {
   "key": "JCGM 100:2008",
   "authors_or_org": "Joint Committee for Guides in Metrology",
   "year": "2008",
   "title": "Evaluation of Measurement Data — Guide to the Expression of Uncertainty in Measurement",
   "publisher_or_series": "JCGM 100:2008.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 33, 46, 47",
   "needs_verification": "no"
  },
  {
   "key": "Jordan et al. 2022",
   "authors_or_org": "Jordan, D.C., et al.",
   "year": "2022",
   "title": "Photovoltaic Fleet Degradation Insights",
   "publisher_or_series": "Progress in Photovoltaics 30.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9",
   "needs_verification": "no"
  },
  {
   "key": "Jordan & Kurtz 2013",
   "authors_or_org": "Jordan, D.C., Kurtz, S.R.",
   "year": "2013",
   "title": "Photovoltaic Degradation Rates—An Analytical Review",
   "publisher_or_series": "Progress in Photovoltaics 21(1).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9",
   "needs_verification": "no"
  },
  {
   "key": "Jülch 2016",
   "authors_or_org": "Jülch, V.",
   "year": "2016",
   "title": "Comparison of electricity storage options using levelized cost of storage (LCOS) method",
   "publisher_or_series": "Applied Energy, 183, 1594–1606.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 39",
   "needs_verification": "no"
  },
  {
   "key": "Kersting 2017",
   "authors_or_org": "Kersting, W. H.",
   "year": "2017",
   "title": "Distribution System Modeling and Analysis",
   "publisher_or_series": "4th ed. CRC Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 4, 20",
   "needs_verification": "no"
  },
  {
   "key": "Sandia 2007",
   "authors_or_org": "King, D. L., Gonzalez, S., Galbraith, G. M., & Boyson, W. E.",
   "year": "2007",
   "title": "Performance Model for Grid-Connected Photovoltaic Inverters",
   "publisher_or_series": "Sandia National Laboratories.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 17",
   "needs_verification": "no"
  },
  {
   "key": "King et al. 2004",
   "authors_or_org": "King, D.L., Boyson, W.E., Kratochvil, J.A.",
   "year": "2004",
   "title": "Photovoltaic Array Performance Model",
   "publisher_or_series": "Sandia National Laboratories, SAND2004-3535.",
   "report_number": "SAND2004-3535",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9",
   "needs_verification": "no"
  },
  {
   "key": "Kundur 1994",
   "authors_or_org": "Kundur, P.",
   "year": "1994",
   "title": "Power System Stability and Control",
   "publisher_or_series": "McGraw-Hill.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 2, 18, 23, 25, 30, 32",
   "needs_verification": "no"
  },
  {
   "key": "Lambert et al. 2006",
   "authors_or_org": "Lambert, T., Gilman, P., and Lilienthal, P.",
   "year": "2006",
   "title": "Micropower System Modeling with HOMER | Micropower system modeling with HOMER",
   "publisher_or_series": "Integration of Alternative Sources of Energy. Wiley-IEEE Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 11, 24, 34; Ex. C",
   "needs_verification": "no"
  },
  {
   "key": "Larminie & Dicks 2003",
   "authors_or_org": "Larminie, J. and Dicks, A.",
   "year": "2003",
   "title": "Fuel Cell Systems Explained",
   "publisher_or_series": "2nd ed. Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 12",
   "needs_verification": "no"
  },
  {
   "key": "Lazard 2024",
   "authors_or_org": "Lazard",
   "year": "2024",
   "title": "Levelized Cost of Energy+",
   "publisher_or_series": "June 2024.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 37, 39",
   "needs_verification": "no"
  },
  {
   "key": "Mai et al. 2018",
   "authors_or_org": "Mai, T., et al.",
   "year": "2018",
   "title": "Electrification Futures Study: Scenarios of Electric Technology Adoption and Power Consumption for the United States",
   "publisher_or_series": "NREL, NREL/TP-6A20-71500.",
   "report_number": "NREL/TP-6A20-71500",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 7",
   "needs_verification": "no"
  },
  {
   "key": "Manwell et al. 2009",
   "authors_or_org": "Manwell, J. F., McGowan, J. G., Rogers, A. L.",
   "year": "2009",
   "title": "Wind Energy Explained: Theory, Design and Application",
   "publisher_or_series": "2nd ed. Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 10",
   "needs_verification": "no"
  },
  {
   "key": "Marcos et al. 2011",
   "authors_or_org": "Marcos, J., Marroyo, L., Lorenzo, E., Alvira, D., and Izco, E.",
   "year": "2011",
   "title": "Power Output Fluctuations in Large Scale PV Plants: One Year Observations with One Second Resolution and a Derived Analytic Model",
   "publisher_or_series": "Progress in Photovoltaics.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 24",
   "needs_verification": "no"
  },
  {
   "key": "Marion et al. 2005",
   "authors_or_org": "Marion, B., Adelstein, J., Boyle, K., et al.",
   "year": "2005",
   "title": "Performance Parameters for Grid-Connected PV Systems",
   "publisher_or_series": "NREL conference paper, 31st IEEE Photovoltaic Specialists Conference.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9",
   "needs_verification": "no"
  },
  {
   "key": "Marqusee & Jenket 2020",
   "authors_or_org": "Marqusee, J., and Jenket, D.",
   "year": "2020",
   "title": "Reliability of Emergency and Standby Diesel Generators: Impact on Energy Resiliency Solutions",
   "publisher_or_series": "Applied Energy 268.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 35",
   "needs_verification": "no"
  },
  {
   "key": "NREL 2017",
   "authors_or_org": "McLaren, J., Gagnon, P., Anderson, K., Elgqvist, E., Fu, R., Remo, T.",
   "year": "2017",
   "title": "Identifying Potential Markets for Behind-the-Meter Battery Energy Storage: A Survey of U.S. Demand Charges",
   "publisher_or_series": "National Renewable Energy Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 38",
   "needs_verification": "yes"
  },
  {
   "key": "Mills & Wiser 2010",
   "authors_or_org": "Mills, A., and Wiser, R.",
   "year": "2010",
   "title": "Implications of Wide-Area Geographic Diversity for Short-Term Variability of Solar Power",
   "publisher_or_series": "Lawrence Berkeley National Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 24",
   "needs_verification": "no"
  },
  {
   "key": "IETF 2010",
   "authors_or_org": "Mills, D., Martin, J., Burbank, J., and Kasch, W.",
   "year": "2010",
   "title": "Network Time Protocol Version 4: Protocol and Algorithms Specification",
   "publisher_or_series": "IETF RFC 5905.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 31",
   "needs_verification": "no"
  },
  {
   "key": "Modbus 2006",
   "authors_or_org": "Modbus Organization",
   "year": "2006",
   "title": "MODBUS over Serial Line Specification and Implementation Guide",
   "publisher_or_series": "V1.02.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 31",
   "needs_verification": "no"
  },
  {
   "key": "Modbus 2012",
   "authors_or_org": "Modbus Organization",
   "year": "2012",
   "title": "MODBUS Application Protocol Specification",
   "publisher_or_series": "V1.1b3.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 31",
   "needs_verification": "no"
  },
  {
   "key": "Mohan et al. 2003",
   "authors_or_org": "Mohan, N., Undeland, T. M., & Robbins, W. P.",
   "year": "2003",
   "title": "Power Electronics: Converters, Applications, and Design",
   "publisher_or_series": "3rd ed. Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 17",
   "needs_verification": "no"
  },
  {
   "key": "PNNL 2020",
   "authors_or_org": "Mongird, K., et al.",
   "year": "2020",
   "title": "2020 Grid Energy Storage Technology Cost and Performance Assessment",
   "publisher_or_series": "Pacific Northwest National Laboratory, for U.S. DOE.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 15, 47",
   "needs_verification": "no"
  },
  {
   "key": "Moubray 1997",
   "authors_or_org": "Moubray, J.",
   "year": "1997",
   "title": "Reliability-Centered Maintenance",
   "publisher_or_series": "2nd ed. Industrial Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 48",
   "needs_verification": "no"
  },
  {
   "key": "NIST WebBook",
   "authors_or_org": "National Institute of Standards and Technology",
   "year": "",
   "title": "NIST Chemistry WebBook",
   "publisher_or_series": "NIST Standard Reference Database 69.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 12; App. A",
   "needs_verification": "yes"
  },
  {
   "key": "NLR URDB",
   "authors_or_org": "National Laboratory of the Rockies (NLR, formerly NREL) (continuously updated)",
   "year": "",
   "title": "Utility Rate Database",
   "publisher_or_series": "OpenEI.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 38",
   "needs_verification": "yes"
  },
  {
   "key": "NREL ATB 2024",
   "authors_or_org": "National Renewable Energy Laboratory",
   "year": "2024",
   "title": "Annual Technology Baseline",
   "publisher_or_series": "NREL.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 37, 39",
   "needs_verification": "yes"
  },
  {
   "key": "NREL ATB 2024",
   "authors_or_org": "National Renewable Energy Laboratory",
   "year": "2024",
   "title": "Annual Technology Baseline: Utility-Scale Battery Storage",
   "publisher_or_series": "NREL.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 15",
   "needs_verification": "yes"
  },
  {
   "key": "Naumann et al. 2018",
   "authors_or_org": "Naumann, M., Schimpe, M., Keil, P., Hesse, H.C., Jossen, A.",
   "year": "2018",
   "title": "Analysis and Modeling of Calendar Aging of a Commercial LiFePO4/Graphite Cell",
   "publisher_or_series": "Journal of Energy Storage, 17.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 14",
   "needs_verification": "no"
  },
  {
   "key": "Naumann et al. 2020",
   "authors_or_org": "Naumann, M., Spingler, F.B., Jossen, A.",
   "year": "2020",
   "title": "Analysis and Modeling of Cycle Aging of a Commercial LiFePO4/Graphite Cell",
   "publisher_or_series": "Journal of Power Sources, 451.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 14",
   "needs_verification": "no"
  },
  {
   "key": "Neher & McGrath 1957",
   "authors_or_org": "Neher, J. H., McGrath, M. H.",
   "year": "1957",
   "title": "The calculation of the temperature rise and load capability of cable systems",
   "publisher_or_series": "AIEE Transactions, Part III: Power Apparatus and Systems, 76.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 20",
   "needs_verification": "no"
  },
  {
   "key": "NERC 2017",
   "authors_or_org": "NERC",
   "year": "2017",
   "title": "Integrating Inverter-Based Resources into Low Short Circuit Strength Systems",
   "publisher_or_series": "Reliability Guideline.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 18",
   "needs_verification": "no"
  },
  {
   "key": "NERC 2018",
   "authors_or_org": "NERC",
   "year": "2018",
   "title": "Short-Circuit Modeling and System Strength",
   "publisher_or_series": "White paper.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 26",
   "needs_verification": "no"
  },
  {
   "key": "NERC 2019",
   "authors_or_org": "NERC",
   "year": "2019",
   "title": "Reliability Guideline: Primary Frequency Control",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 30",
   "needs_verification": "no"
  },
  {
   "key": "NERC 2023",
   "authors_or_org": "NERC",
   "year": "2023",
   "title": "Grid Forming Functional Specifications for BPS-Connected Battery Energy Storage Systems",
   "publisher_or_series": "White Paper.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 18",
   "needs_verification": "no"
  },
  {
   "key": "NY SIR",
   "authors_or_org": "New York PSC",
   "year": "",
   "title": "Standardized Interconnection Requirements and Application Process",
   "publisher_or_series": "current version.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 43",
   "needs_verification": "yes"
  },
  {
   "key": "NY SIR",
   "authors_or_org": "New York State Public Service Commission",
   "year": "",
   "title": "Standardized Interconnection Requirements and Application Process for New Distributed Generators",
   "publisher_or_series": "Amended periodically.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 36",
   "needs_verification": "yes"
  },
  {
   "key": "NIST 2014",
   "authors_or_org": "NIST",
   "year": "2014",
   "title": "Guidelines for Smart Grid Cybersecurity",
   "publisher_or_series": "NIST IR 7628 Rev. 1.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 31",
   "needs_verification": "no"
  },
  {
   "key": "NIST 2024",
   "authors_or_org": "NIST",
   "year": "2024",
   "title": "The NIST Cybersecurity Framework (CSF) 2.0",
   "publisher_or_series": "NIST CSWP 29.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 31",
   "needs_verification": "no"
  },
  {
   "key": "CODATA 2022",
   "authors_or_org": "NIST Physical Measurement Laboratory",
   "year": "2024",
   "title": "CODATA Internationally Recommended 2022 Values of the Fundamental Physical Constants",
   "publisher_or_series": "NIST Reference on Constants, Units, and Uncertainty.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "App. A",
   "needs_verification": "no"
  },
  {
   "key": "U.S. Standard Atmosphere 1976 | USSA 1976",
   "authors_or_org": "NOAA, NASA and U.S. Air Force",
   "year": "1976",
   "title": "U.S. Standard Atmosphere, 1976",
   "publisher_or_series": "U.S. Government Printing Office.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 10; App. A",
   "needs_verification": "no"
  },
  {
   "key": "Ogata 2010",
   "authors_or_org": "Ogata, K.",
   "year": "2010",
   "title": "Modern Control Engineering",
   "publisher_or_series": "5th ed. Prentice Hall.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 30",
   "needs_verification": "no"
  },
  {
   "key": "Olivares et al. 2014",
   "authors_or_org": "Olivares, D. E., Mehrizi-Sani, A., Etemadi, A. H., Cañizares, C. A., Iravani, R., Kazerani, M., et al.",
   "year": "2014",
   "title": "Trends in microgrid control",
   "publisher_or_series": "IEEE Transactions on Smart Grid, 5(4), 1905–1919.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 29, 30",
   "needs_verification": "no"
  },
  {
   "key": "Ong et al. 2013",
   "authors_or_org": "Ong, S., Campbell, C., Denholm, P., Margolis, R., Heath, G.",
   "year": "2013",
   "title": "Land-Use Requirements for Solar Power Plants in the United States",
   "publisher_or_series": "NREL Technical Report NREL/TP-6A20-56290.",
   "report_number": "Technical Report NREL/TP-6A20-56290",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 9, 33",
   "needs_verification": "no"
  },
  {
   "key": "OSHA 29 CFR 1910.269",
   "authors_or_org": "OSHA",
   "year": "",
   "title": "Electric Power Generation, Transmission, and Distribution",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 48",
   "needs_verification": "yes"
  },
  {
   "key": "OSHA 29 CFR 1910 Subpart S",
   "authors_or_org": "OSHA",
   "year": "",
   "title": "Electrical",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 48",
   "needs_verification": "yes"
  },
  {
   "key": "OSHA 29 CFR 1910.147",
   "authors_or_org": "OSHA",
   "year": "",
   "title": "The Control of Hazardous Energy (Lockout/Tagout)",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 48",
   "needs_verification": "yes"
  },
  {
   "key": "PNNL 2023",
   "authors_or_org": "Pacific Northwest National Laboratory for U.S. DOE",
   "year": "2023",
   "title": "Distributed Wind Market Report: 2023 Edition",
   "publisher_or_series": "U.S. Department of Energy.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 10",
   "needs_verification": "no"
  },
  {
   "key": "Paish 2002",
   "authors_or_org": "Paish, O.",
   "year": "2002",
   "title": "Small hydro power: technology and current status",
   "publisher_or_series": "Renewable and Sustainable Energy Reviews 6(6), 537–556.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 10",
   "needs_verification": "no"
  },
  {
   "key": "Plett 2015",
   "authors_or_org": "Plett, G. L.",
   "year": "2015",
   "title": "Battery Management Systems, Volume I: Battery Modeling",
   "publisher_or_series": "Artech House.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 13, 14",
   "needs_verification": "no"
  },
  {
   "key": "Preger et al. 2020",
   "authors_or_org": "Preger, Y., et al.",
   "year": "2020",
   "title": "Degradation of Commercial Lithium-Ion Cells as a Function of Chemistry and Cycling Conditions",
   "publisher_or_series": "Journal of The Electrochemical Society, 167. Sandia National Laboratories.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 14",
   "needs_verification": "no"
  },
  {
   "key": "Ramasamy et al. 2023",
   "authors_or_org": "Ramasamy, V., et al.",
   "year": "2023",
   "title": "U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks, With Minimum Sustainable Price Analysis: Q1 2023",
   "publisher_or_series": "National Renewable Energy Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 37",
   "needs_verification": "no"
  },
  {
   "key": "Rawlings et al. 2017",
   "authors_or_org": "Rawlings, J. B., Mayne, D. Q., and Diehl, M. M.",
   "year": "2017",
   "title": "Model Predictive Control: Theory, Computation, and Design",
   "publisher_or_series": "2nd ed. Nob Hill Publishing.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 32",
   "needs_verification": "no"
  },
  {
   "key": "Linden's Handbook 2011 | Reddy 2011",
   "authors_or_org": "Reddy, T. B., ed.",
   "year": "2011",
   "title": "Linden's Handbook of Batteries",
   "publisher_or_series": "4th ed. McGraw-Hill.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 13, 14",
   "needs_verification": "no"
  },
  {
   "key": "Rocabert et al. 2012",
   "authors_or_org": "Rocabert, J., Luna, A., Blaabjerg, F., and Rodríguez, P.",
   "year": "2012",
   "title": "Control of power converters in AC microgrids",
   "publisher_or_series": "IEEE Transactions on Power Electronics, 27(11).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 30",
   "needs_verification": "no"
  },
  {
   "key": "Schmalstieg et al. 2014",
   "authors_or_org": "Schmalstieg, J., Käbitz, S., Ecker, M., Sauer, D.U.",
   "year": "2014",
   "title": "A Holistic Aging Model for Li(NiMnCo)O2 Based 18650 Lithium-Ion Batteries",
   "publisher_or_series": "Journal of Power Sources, 257.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 14",
   "needs_verification": "no"
  },
  {
   "key": "Schmidt et al. 2019",
   "authors_or_org": "Schmidt, O., Melchior, S., Hawkes, A., and Staffell, I.",
   "year": "2019",
   "title": "Projecting the future levelized cost of electricity storage technologies",
   "publisher_or_series": "Joule, 3(1), 81–100.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 39",
   "needs_verification": "no"
  },
  {
   "key": "Sengupta et al. 2018",
   "authors_or_org": "Sengupta, M., Xie, Y., Lopez, A., Habte, A., Maclaurin, G., and Shelby, J.",
   "year": "2018",
   "title": "The National Solar Radiation Data Base (NSRDB)",
   "publisher_or_series": "Renewable and Sustainable Energy Reviews 89.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 7, 9, 34",
   "needs_verification": "no"
  },
  {
   "key": "Short et al. 1995",
   "authors_or_org": "Short, W., Packey, D. J., and Holt, T.",
   "year": "1995",
   "title": "A Manual for the Economic Evaluation of Energy Efficiency and Renewable Energy Technologies",
   "publisher_or_series": "National Renewable Energy Laboratory, NREL/TP-462-5173.",
   "report_number": "NREL/TP-462-5173",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 37, 39",
   "needs_verification": "no"
  },
  {
   "key": "Skogestad & Postlethwaite 2005",
   "authors_or_org": "Skogestad, S., and Postlethwaite, I.",
   "year": "2005",
   "title": "Multivariable Feedback Control: Analysis and Design",
   "publisher_or_series": "2nd ed. Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 29",
   "needs_verification": "no"
  },
  {
   "key": "Smith et al. 2017",
   "authors_or_org": "Smith, K., Saxon, A., Keyser, M., Lundstrom, B., Cao, Z., Roc, A.",
   "year": "2017",
   "title": "Life Prediction Model for Grid-Connected Li-Ion Battery Energy Storage System",
   "publisher_or_series": "American Control Conference; National Renewable Energy Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 14",
   "needs_verification": "no"
  },
  {
   "key": "NIST 2023",
   "authors_or_org": "Stouffer, K., et al.",
   "year": "2023",
   "title": "Guide to Operational Technology (OT) Security",
   "publisher_or_series": "NIST SP 800-82 Rev. 3.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 31",
   "needs_verification": "no"
  },
  {
   "key": "Sullivan et al. 2015",
   "authors_or_org": "Sullivan, M. J., Schellenberg, J., and Blundell, M.",
   "year": "2015",
   "title": "Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States",
   "publisher_or_series": "Lawrence Berkeley National Laboratory, LBNL-6941E.",
   "report_number": "LBNL-6941E",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 34, 35",
   "needs_verification": "yes"
  },
  {
   "key": "SunSpec",
   "authors_or_org": "SunSpec Alliance",
   "year": "",
   "title": "SunSpec Information Model Specification",
   "publisher_or_series": "and *SunSpec Modbus* model definitions, current release.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 31",
   "needs_verification": "yes"
  },
  {
   "key": "SunSpec",
   "authors_or_org": "SunSpec Alliance",
   "year": "",
   "title": "SunSpec Modbus",
   "publisher_or_series": "information models and *Common Smart Inverter Profile* conformance program, current release.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 43",
   "needs_verification": "yes"
  },
  {
   "key": "Teodorescu et al. 2011",
   "authors_or_org": "Teodorescu, R., Liserre, M., & Rodríguez, P.",
   "year": "2011",
   "title": "Grid Converters for Photovoltaic and Wind Power Systems",
   "publisher_or_series": "Wiley-IEEE Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 17",
   "needs_verification": "no"
  },
  {
   "key": "NIST 2008 | NIST SP 811-2008",
   "authors_or_org": "Thompson, A. and Taylor, B. N., NIST",
   "year": "2008",
   "title": "Guide for the Use of the International System of Units (SI)",
   "publisher_or_series": "NIST Special Publication 811.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 1; App. A",
   "needs_verification": "no"
  },
  {
   "key": "Ton & Smith 2012",
   "authors_or_org": "Ton, D. T. and Smith, M. A.",
   "year": "2012",
   "title": "The U.S. Department of Energy's Microgrid Initiative",
   "publisher_or_series": "The Electricity Journal, 25(8).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 21",
   "needs_verification": "no"
  },
  {
   "key": "18 CFR 292.205",
   "authors_or_org": "U.S",
   "year": "",
   "title": "Code of Federal Regulations, Title 18, §292.205",
   "publisher_or_series": "Criteria for qualifying cogeneration facilities.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 12",
   "needs_verification": "yes"
  },
  {
   "key": "DOE 10 CFR 431",
   "authors_or_org": "U.S",
   "year": "",
   "title": "Department of Energy",
   "publisher_or_series": "Energy Conservation Program for Certain Commercial and Industrial Equipment, 10 CFR Part 431, Subpart K (Distribution Transformers).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 20",
   "needs_verification": "yes"
  },
  {
   "key": "49 CFR 173.185",
   "authors_or_org": "U.S",
   "year": "",
   "title": "Department of Transportation, Pipeline and Hazardous Materials Safety Administration",
   "publisher_or_series": "Code of Federal Regulations, Title 49, §173.185 — Lithium cells and batteries. Revision in force to confirm.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 45",
   "needs_verification": "yes"
  },
  {
   "key": "EIA MER | EIA-861",
   "authors_or_org": "U.S",
   "year": "",
   "title": "Energy Information Administration",
   "publisher_or_series": "Monthly Energy Review, Appendix A: Thermal Conversion Factors. U.S. Department of Energy.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 35; App. A",
   "needs_verification": "yes"
  },
  {
   "key": "40 CFR 60 IIII",
   "authors_or_org": "U.S",
   "year": "",
   "title": "EPA",
   "publisher_or_series": "Standards of Performance for Stationary Compression Ignition Internal Combustion Engines. 40 CFR Part 60 Subpart IIII, current CFR.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 11, 41",
   "needs_verification": "yes"
  },
  {
   "key": "40 CFR 60 JJJJ",
   "authors_or_org": "U.S",
   "year": "",
   "title": "EPA",
   "publisher_or_series": "Standards of Performance for Stationary Spark Ignition Internal Combustion Engines. 40 CFR Part 60 Subpart JJJJ, current CFR.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 11, 41",
   "needs_verification": "yes"
  },
  {
   "key": "40 CFR 63 ZZZZ",
   "authors_or_org": "U.S",
   "year": "",
   "title": "EPA",
   "publisher_or_series": "National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines. 40 CFR Part 63 Subpart ZZZZ, current CFR.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 11, 41",
   "needs_verification": "yes"
  },
  {
   "key": "40 CFR Part 60 Subpart IIII",
   "authors_or_org": "U.S",
   "year": "",
   "title": "EPA",
   "publisher_or_series": "Standards of Performance for Stationary Compression Ignition Internal Combustion Engines. Code of Federal Regulations, current.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 24",
   "needs_verification": "yes"
  },
  {
   "key": "40 CFR Part 60 Subpart JJJJ",
   "authors_or_org": "U.S",
   "year": "",
   "title": "EPA",
   "publisher_or_series": "Standards of Performance for Stationary Spark Ignition Internal Combustion Engines. Code of Federal Regulations, current.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 24",
   "needs_verification": "yes"
  },
  {
   "key": "40 CFR Part 63 Subpart ZZZZ",
   "authors_or_org": "U.S",
   "year": "",
   "title": "EPA",
   "publisher_or_series": "National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines. Code of Federal Regulations, current.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 24",
   "needs_verification": "yes"
  },
  {
   "key": "OSHA 29 CFR 1910 Subpart S | OSHA 29 CFR 1910.147 | OSHA 29 CFR 1910.269",
   "authors_or_org": "U.S",
   "year": "",
   "title": "Occupational Safety and Health Administration",
   "publisher_or_series": "Electric Power Generation, Transmission, and Distribution, current CFR.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 44",
   "needs_verification": "yes"
  },
  {
   "key": "DOE 2022",
   "authors_or_org": "U.S. Department of Energy",
   "year": "2022",
   "title": "Electric Grid Supply Chain Review: Large Power Transformers and High Voltage Direct Current Systems",
   "publisher_or_series": "DOE supply chain deep-dive assessment.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 33",
   "needs_verification": "no"
  },
  {
   "key": "DOE HFTO 2022",
   "authors_or_org": "U.S. Department of Energy, Hydrogen and Fuel Cell Technologies Office",
   "year": "2022",
   "title": "Technical Targets for Proton Exchange Membrane Electrolysis",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 12",
   "needs_verification": "no"
  },
  {
   "key": "EIA 2022",
   "authors_or_org": "U.S. Energy Information Administration",
   "year": "2022",
   "title": "Commercial Buildings Energy Consumption Survey (CBECS) 2018: Consumption and Expenditures",
   "publisher_or_series": "EIA.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 5",
   "needs_verification": "no"
  },
  {
   "key": "EIA 2024",
   "authors_or_org": "U.S. Energy Information Administration",
   "year": "2024",
   "title": "Capital Cost and Performance Characteristics for Utility-Scale Electric Power Generating Technologies",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 37",
   "needs_verification": "no"
  },
  {
   "key": "EPA CHP 2017",
   "authors_or_org": "U.S. EPA Combined Heat and Power Partnership",
   "year": "2017",
   "title": "Catalog of CHP Technologies",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 11, 12",
   "needs_verification": "no"
  },
  {
   "key": "NUREG/CR-6928",
   "authors_or_org": "U.S. Nuclear Regulatory Commission",
   "year": "2007",
   "title": "Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants",
   "publisher_or_series": "",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 35",
   "needs_verification": "no"
  },
  {
   "key": "UNIFI 2022",
   "authors_or_org": "UNIFI Consortium",
   "year": "2022",
   "title": "UNIFI Specifications for Grid-Forming Inverter-Based Resources",
   "publisher_or_series": "Version 1.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 18",
   "needs_verification": "no"
  },
  {
   "key": "IRA 2022",
   "authors_or_org": "United States Congress",
   "year": "2022",
   "title": "Inflation Reduction Act of 2022",
   "publisher_or_series": "Public Law 117-169.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 40",
   "needs_verification": "no"
  },
  {
   "key": "PL 119-21",
   "authors_or_org": "United States Congress",
   "year": "2025",
   "title": "An Act to provide for reconciliation pursuant to title II of H. Con. Res. 14",
   "publisher_or_series": "Public Law 119-21.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 40",
   "needs_verification": "no"
  },
  {
   "key": "Uptime Institute",
   "authors_or_org": "Uptime Institute",
   "year": "",
   "title": "Tier Standard: Topology",
   "publisher_or_series": "Current edition.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 35",
   "needs_verification": "yes"
  },
  {
   "key": "PNNL 2022",
   "authors_or_org": "Viswanathan, V., et al.",
   "year": "2022",
   "title": "2022 Grid Energy Storage Technology Cost and Performance Assessment",
   "publisher_or_series": "Pacific Northwest National Laboratory, Energy Storage Grand Challenge.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 13, 33, 37",
   "needs_verification": "no"
  },
  {
   "key": "Waldmann et al. 2014",
   "authors_or_org": "Waldmann, T., Wilka, M., Kasper, M., Fleischhammer, M., Wohlfahrt-Mehrens, M.",
   "year": "2014",
   "title": "Temperature Dependent Ageing Mechanisms in Lithium-Ion Batteries — A Post-Mortem Study",
   "publisher_or_series": "Journal of Power Sources, 262.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 14",
   "needs_verification": "no"
  },
  {
   "key": "Wilcox & Marion 2008",
   "authors_or_org": "Wilcox, S., and Marion, W.",
   "year": "2008",
   "title": "Users Manual for TMY3 Data Sets",
   "publisher_or_series": "National Renewable Energy Laboratory, NREL/TP-581-43156.",
   "report_number": "NREL/TP-581-43156; Technical Report NREL/TP-581-43156",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 7, 9, 34",
   "needs_verification": "yes"
  },
  {
   "key": "Willis 2004",
   "authors_or_org": "Willis, H. L.",
   "year": "2004",
   "title": "Power Distribution Planning Reference Book",
   "publisher_or_series": "2nd ed. Marcel Dekker.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 5",
   "needs_verification": "no"
  },
  {
   "key": "NREL 2021",
   "authors_or_org": "Wilson, E., et al.",
   "year": "2021",
   "title": "End-Use Load Profiles for the U.S. Building Stock: Methodology and Results of Model Calibration, Validation, and Uncertainty Quantification",
   "publisher_or_series": "National Renewable Energy Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 5",
   "needs_verification": "no"
  },
  {
   "key": "Wood et al. 2014",
   "authors_or_org": "Wood, A. J., Wollenberg, B. F., and Sheblé, G. B.",
   "year": "2014",
   "title": "Power Generation, Operation, and Control",
   "publisher_or_series": "3rd ed. Wiley.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 32, 40",
   "needs_verification": "no"
  },
  {
   "key": "NREL 2023",
   "authors_or_org": "Wood, E., et al.",
   "year": "2023",
   "title": "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure",
   "publisher_or_series": "National Renewable Energy Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 8",
   "needs_verification": "no"
  },
  {
   "key": "Woodward 2004",
   "authors_or_org": "Woodward",
   "year": "2004",
   "title": "Speed Droop and Power Generation",
   "publisher_or_series": "Application Note 01302.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 30",
   "needs_verification": "no"
  },
  {
   "key": "Xu et al. 2018",
   "authors_or_org": "Xu, B., Oudalov, A., Ulbig, A., Andersson, G., Kirschen, D.S.",
   "year": "2018",
   "title": "Modeling of Lithium-Ion Battery Degradation for Cell Life Assessment",
   "publisher_or_series": "IEEE Transactions on Smart Grid, 9(2).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 14",
   "needs_verification": "yes"
  },
  {
   "key": "Xu et al. 2018",
   "authors_or_org": "Xu, B., Zhao, J., Zheng, T., Litvinov, E., and Kirschen, D. S.",
   "year": "2018",
   "title": "Factoring the Cycle Aging Cost of Batteries Participating in Electricity Markets",
   "publisher_or_series": "IEEE Transactions on Power Systems 33(2).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 32",
   "needs_verification": "yes"
  },
  {
   "key": "Xu et al. 2004",
   "authors_or_org": "Xu, P., Haves, P., Piette, M.A., Braun, J.",
   "year": "2004",
   "title": "Peak Demand Reduction from Pre-Cooling with Zone Temperature Reset in an Office Building",
   "publisher_or_series": "Lawrence Berkeley National Laboratory.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 8",
   "needs_verification": "no"
  },
  {
   "key": "Yazdani & Iravani 2010",
   "authors_or_org": "Yazdani, A., & Iravani, R.",
   "year": "2010",
   "title": "Voltage-Sourced Converters in Power Systems: Modeling, Control, and Applications",
   "publisher_or_series": "Wiley-IEEE Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 17",
   "needs_verification": "no"
  },
  {
   "key": "Ye et al. 2004",
   "authors_or_org": "Ye, Z., Kolwalkar, A., Zhang, Y., Du, P., and Walling, R.",
   "year": "2004",
   "title": "Evaluation of anti-islanding schemes based on nondetection zone concept",
   "publisher_or_series": "IEEE Transactions on Power Electronics, 19(5).",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 22",
   "needs_verification": "no"
  },
  {
   "key": "Yescombe 2014",
   "authors_or_org": "Yescombe, E. R.",
   "year": "2014",
   "title": "Principles of Project Finance",
   "publisher_or_series": "2nd ed. Academic Press.",
   "report_number": "",
   "url_or_doi": "",
   "cited_in_chapters": "Ch. 39",
   "needs_verification": "no"
  }
 ],
 "public_sources": [
  {
   "key": "S1",
   "org": "Sargent & Lundy",
   "title": "Battery energy storage systems independent engineering due diligence",
   "year": "2026",
   "url": "https://www.sargentlundy.com/resources/whitepapers/battery-energy-storage-systems-independent-engineering-due-diligence/",
   "note": "",
   "cards": "B-15"
  },
  {
   "key": "S3",
   "org": "U.S. Department of Energy",
   "title": "Lithium-ion BESS Technical Specifications",
   "year": "2025",
   "url": "https://www.energy.gov/sites/default/files/2025-04/technical-specifications-lithium-ion-battery-storage-2024.docx",
   "note": "",
   "cards": "B-15"
  },
  {
   "key": "S4",
   "org": "Energy-Storage.news",
   "title": "BloombergNEF launches Tier 1 list (criteria as reported)",
   "year": "2024",
   "url": "https://www.energy-storage.news/bloombergnef-notes-uptick-in-china-based-bess-providers-as-it-launches-tier-1-list",
   "note": "link taken from a search result; open it to confirm before citing",
   "cards": "B-15"
  },
  {
   "key": "S6",
   "org": "ESS News",
   "title": "What insurers want battery developers to understand right now (underwriter interview)",
   "year": "2025",
   "url": "https://www.ess-news.com/?p=7221",
   "note": "",
   "cards": "B-15"
  },
  {
   "key": "S9",
   "org": "PubMed Central",
   "title": "Prussian blue data review",
   "year": "",
   "url": "https://pmc.ncbi.nlm.nih.gov/articles/PMC7476023",
   "note": "link taken from a search result; open it to confirm before citing",
   "cards": "B-16"
  },
  {
   "key": "S11",
   "org": "Microstructures",
   "title": "Layered cathode review",
   "year": "2024",
   "url": "https://www.oaepublish.com/articles/microstructures.2023.102",
   "note": "link taken from a search result; open it to confirm before citing",
   "cards": "B-16"
  },
  {
   "key": "S13",
   "org": "MDPI Batteries",
   "title": "Electrode thermal runaway",
   "year": "",
   "url": "https://www.ess-news.com/2025/06/20/comparing-thermal-runaway-behavior-of-sodium-ion-lithium-ion-batteries",
   "note": "",
   "cards": "B-16"
  },
  {
   "key": "S14",
   "org": "Sandia National Labs",
   "title": "Sodium-ion safety",
   "year": "2026",
   "url": "https://doepeerreview.sandia.gov/app/uploads/sites/82/2026/07/705_-Johnson_Nathan_SodiumIon-v2-2.pdf",
   "note": "",
   "cards": "B-16"
  },
  {
   "key": "S15",
   "org": "RSC",
   "title": "Cell thermal runaway",
   "year": "2025",
   "url": "https://pubs.rsc.org/en/content/articlepdf/2025/se/d5se00687b",
   "note": "",
   "cards": "B-16"
  },
  {
   "key": "S19",
   "org": "RSC",
   "title": "NaCrO2 high-rate cathode",
   "year": "",
   "url": "https://citedrive.com/en/discovery/onestep-surfacetobulk-modification-of-nacrosub2sub-cathode-for-durable-sodiumion-batteries",
   "note": "",
   "cards": "B-16"
  },
  {
   "key": "S20",
   "org": "Electrochem. Soc.",
   "title": "NaCrO2 safety abstract",
   "year": "2013",
   "url": "https://ecs.confex.com/ecs/224/webprogram/Abstract/Paper24078/B2-0398.pdf",
   "note": "link taken from a search result; open it to confirm before citing",
   "cards": "B-16"
  },
  {
   "key": "S25",
   "org": "CSIR",
   "title": "NFPP cell test",
   "year": "",
   "url": "https://www.ess-news.com/2026/04/07/cornex-unveils-new-165-ah-sodium-ion-prismatic-cell-for-stationary-energy-storage/",
   "note": "",
   "cards": "B-16"
  },
  {
   "key": "S36",
   "org": "UNIDO ITPO Tokyo",
   "title": "NAS sodium-sulfur battery technology entry",
   "year": "2018",
   "url": "https://itpo-tokyo.unido.org/en/technology_db/4394",
   "note": "link taken from a search result; open it to confirm before citing",
   "cards": "B-17"
  },
  {
   "key": "S37",
   "org": "Energy-Storage.news",
   "title": "Long duration energy storage to scale in second half of 2030s, says DNV (as reported)",
   "year": "",
   "url": "https://www.energy-storage.news/long-duration-energy-storage-to-scale-in-second-half-of-2030s-says-dnv/",
   "note": "",
   "cards": "B-17"
  },
  {
   "key": "S38",
   "org": "Lawrence Berkeley National Laboratory",
   "title": "Land Requirements for Utility-Scale PV: An Empirical Update on Power and Energy Density",
   "year": "2022",
   "url": "https://emp.lbl.gov/sites/default/files/emp-files/land_requirements_for_utility-scale_pv.pdf",
   "note": "",
   "cards": "S-02"
  }
 ],
 "cards": [
  {
   "card": "L-01",
   "section": "L",
   "question": "What do I need from the customer to size a system?",
   "handbook_entries": "ROT-LOAD-03;LOAD-001;LOAD-021;LOAD-022;LOAD-023;ROT-LOAD-06;SYS-001;ROT-SYS-09",
   "handbook_source_keys": "Willis 2004",
   "standards": "STD-014;STD-103;STD-123;STD-157",
   "public_source_keys": ""
  },
  {
   "card": "L-02",
   "section": "L",
   "question": "Peak or energy: which one sizes what?",
   "handbook_entries": "LOAD-021;LOAD-022;LOAD-018;LOAD-023;LOAD-001;LOAD-002",
   "handbook_source_keys": "Willis 2004",
   "standards": "STD-014;STD-113;STD-123;STD-157",
   "public_source_keys": ""
  },
  {
   "card": "L-03",
   "section": "L",
   "question": "What does load factor tell me about a site?",
   "handbook_entries": "LOAD-005;LOAD-006;LOAD-007;LOAD-002;ROT-LOAD-03;ROT-LOAD-01;ROT-LOAD-05",
   "handbook_source_keys": "Gönen 2014;Willis 2004",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "L-04",
   "section": "L",
   "question": "We have several buildings. Can I just add up their peaks?",
   "handbook_entries": "LOAD-010;LOAD-009;LOAD-008;ROT-LOAD-02;ROT-MG-13;MG-022",
   "handbook_source_keys": "Adibi 2000;Gönen 2014;Ihara & Schweppe 1981;Willis 2004",
   "standards": "STD-060",
   "public_source_keys": ""
  },
  {
   "card": "L-05",
   "section": "L",
   "question": "Should we back up the whole building or just the critical loads?",
   "handbook_entries": "LOAD-021;LOAD-022;ROT-LOAD-09;ROT-LOAD-11;ROT-CTRL-19",
   "handbook_source_keys": "",
   "standards": "STD-014",
   "public_source_keys": ""
  },
  {
   "card": "L-06",
   "section": "L",
   "question": "Why do motors matter so much when the building runs on backup power?",
   "handbook_entries": "LOAD-014;LOAD-015;LOAD-016;LOAD-017;LOAD-019;LOAD-023;ROT-LOAD-06;ROT-LOAD-07;ROT-LOAD-10",
   "handbook_source_keys": "",
   "standards": "STD-060;STD-157",
   "public_source_keys": ""
  },
  {
   "card": "L-07",
   "section": "L",
   "question": "How much load growth should we allow for?",
   "handbook_entries": "ROT-LOAD-12;ROT-LOAD-13;LOAD-024;LOAD-025;LOAD-027;ROT-LOAD-15",
   "handbook_source_keys": "Hong & Fan 2016;Hyndman & Athanasopoulos 2021;Mai et al. 2018",
   "standards": "STD-014",
   "public_source_keys": ""
  },
  {
   "card": "L-08",
   "section": "L",
   "question": "What does electric vehicle charging add to the load?",
   "handbook_entries": "LOAD-037;LOAD-029;LOAD-036;LOAD-010;ROT-LOAD-20;ROT-LOAD-17",
   "handbook_source_keys": "Gönen 2014;Mai et al. 2018;NREL 2023;Willis 2004",
   "standards": "STD-060;STD-116;STD-117",
   "public_source_keys": ""
  },
  {
   "card": "L-09",
   "section": "L",
   "question": "How much load can we turn down instead of buying more battery?",
   "handbook_entries": "LOAD-040;ROT-LOAD-21;LOAD-032;LOAD-033;ROT-LOAD-18;ROT-LOAD-19",
   "handbook_source_keys": "Braun 2003;Coughlin et al. 2008;Xu et al. 2004",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "S-01",
   "section": "S",
   "question": "How many kWh a year will each kW of solar make?",
   "handbook_entries": "PV-001;PV-002;PV-003;PV-004;ROT-PV-01",
   "handbook_source_keys": "Dierauf et al. 2013;Dobos 2014;Duffie & Beckman 2013;Marion et al. 2005;Sengupta et al. 2018",
   "standards": "STD-099",
   "public_source_keys": ""
  },
  {
   "card": "S-02",
   "section": "S",
   "question": "How much roof or land does solar need?",
   "handbook_entries": "PV-013;ROT-PV-07;ROT-SYS-03;SYS-003",
   "handbook_source_keys": "Bolinger & Bolinger 2022;Ong et al. 2013",
   "standards": "STD-085",
   "public_source_keys": "S38"
  },
  {
   "card": "S-03",
   "section": "S",
   "question": "Why is the solar array bigger than the inverter (DC/AC ratio)?",
   "handbook_entries": "ROT-PV-04;ROT-PV-05;PV-009;PV-010;PV-011;PCS-029",
   "handbook_source_keys": "Dobos 2014;NREL 2017",
   "standards": "STD-001;STD-060;STD-075",
   "public_source_keys": ""
  },
  {
   "card": "S-04",
   "section": "S",
   "question": "How much energy is lost between the panels and the inverter output?",
   "handbook_entries": "PV-004;ROT-PV-01;PV-001;ROT-PV-05",
   "handbook_source_keys": "Dierauf et al. 2013;Dobos 2014;Duffie & Beckman 2013;Marion et al. 2005",
   "standards": "STD-099",
   "public_source_keys": ""
  },
  {
   "card": "S-05",
   "section": "S",
   "question": "How fast does solar output fade with age?",
   "handbook_entries": "PV-012;ROT-PV-06",
   "handbook_source_keys": "Jordan & Kurtz 2013;Jordan et al. 2022",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "S-06",
   "section": "S",
   "question": "Why won't solar alone keep the lights on in an outage?",
   "handbook_entries": "ROT-MG-04;ROT-WND-05;PV-014;ROT-PV-08;ROT-PV-04;CTRL-035;ROT-MG-16;MG-027",
   "handbook_source_keys": "Sengupta et al. 2018;Wilcox & Marion 2008",
   "standards": "STD-014",
   "public_source_keys": ""
  },
  {
   "card": "S-07",
   "section": "S",
   "question": "What do hot and cold weather do to solar output?",
   "handbook_entries": "PV-005;PV-006;ROT-PV-02;PV-007;PV-008;ROT-PV-03",
   "handbook_source_keys": "Faiman 2008;King et al. 2004",
   "standards": "STD-060;STD-190",
   "public_source_keys": ""
  },
  {
   "card": "S-08",
   "section": "S",
   "question": "What does a bad week of sun look like for an island?",
   "handbook_entries": "PV-014;ROT-PV-08;PV-001;MG-027;MG-036",
   "handbook_source_keys": "Dobos 2014;Duffie & Beckman 2013;Sengupta et al. 2018;Wilcox & Marion 2008",
   "standards": "STD-014",
   "public_source_keys": ""
  },
  {
   "card": "S-09",
   "section": "S",
   "question": "Is wind or small hydro worth a look?",
   "handbook_entries": "ROT-WND-01;ROT-WND-02;ROT-WND-03;ROT-WND-04;ROT-WND-05;WND-001;WND-006;WND-008;WND-009;WND-010",
   "handbook_source_keys": "Burton et al. 2011;ESHA 2004;Manwell et al. 2009;PNNL 2023;Paish 2002",
   "standards": "STD-097;STD-181;STD-191",
   "public_source_keys": ""
  },
  {
   "card": "G-01",
   "section": "G",
   "question": "How big a generator do I need?",
   "handbook_entries": "GEN-011;GEN-002;GEN-001;GEN-010;ROT-MG-19;ROT-GEN-01;ROT-GEN-03;LOAD-021",
   "handbook_source_keys": "",
   "standards": "STD-014;STD-112",
   "public_source_keys": ""
  },
  {
   "card": "G-02",
   "section": "G",
   "question": "How much fuel does a diesel generator burn per kWh and per day?",
   "handbook_entries": "GEN-003;GEN-006;GEN-004;GEN-005;ROT-GEN-04",
   "handbook_source_keys": "EPA CHP 2017;Lambert et al. 2006",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "G-03",
   "section": "G",
   "question": "How lightly loaded can a diesel generator run?",
   "handbook_entries": "GEN-007;ROT-GEN-05;ROT-MG-19;ROT-MG-16;GEN-010",
   "handbook_source_keys": "Cummins T-030",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "G-04",
   "section": "G",
   "question": "How big a load can a generator pick up in one step?",
   "handbook_entries": "GEN-008;GEN-009;ROT-GEN-06;ROT-LOAD-11;GEN-004;LOAD-018",
   "handbook_source_keys": "EPA CHP 2017",
   "standards": "STD-014;STD-063;STD-113",
   "public_source_keys": ""
  },
  {
   "card": "G-05",
   "section": "G",
   "question": "Standby, prime or continuous rating: which one do I need?",
   "handbook_entries": "ROT-GEN-01;GEN-001;GEN-006",
   "handbook_source_keys": "",
   "standards": "STD-112",
   "public_source_keys": ""
  },
  {
   "card": "G-06",
   "section": "G",
   "question": "How many days will my fuel tank last?",
   "handbook_entries": "MG-026;GEN-012;GEN-003;ROT-MG-20;ROT-MG-21",
   "handbook_source_keys": "Lambert et al. 2006",
   "standards": "STD-063;STD-067;STD-112",
   "public_source_keys": ""
  },
  {
   "card": "G-07",
   "section": "G",
   "question": "Diesel or natural gas generator?",
   "handbook_entries": "ROT-GEN-06;ROT-GEN-03;ROT-MG-21;GEN-004;GEN-012;CHP-005",
   "handbook_source_keys": "EPA CHP 2017",
   "standards": "STD-063;STD-067",
   "public_source_keys": ""
  },
  {
   "card": "G-08",
   "section": "G",
   "question": "Combined heat and power, microturbines and fuel cells: are they worth a look?",
   "handbook_entries": "CHP-001;CHP-002;CHP-003;CHP-005;ROT-CHP-01;ROT-CHP-02;ROT-CHP-03;CHP-009",
   "handbook_source_keys": "18 CFR 292.205;DOE HFTO 2022;EPA CHP 2017;Larminie & Dicks 2003;NIST WebBook",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "B-01",
   "section": "B",
   "question": "How big a battery do I need to ride through an outage?",
   "handbook_entries": "ESS-027;ESS-028;ESS-029;ESS-030;ESS-026;ROT-ESS-16;ROT-ESS-08;ROT-ESS-10;ROT-ESS-28",
   "handbook_source_keys": "Sandia 2015",
   "standards": "STD-008;STD-009;STD-014",
   "public_source_keys": ""
  },
  {
   "card": "B-02",
   "section": "B",
   "question": "How big a battery do I need to shave my demand peak?",
   "handbook_entries": "ESS-033;ESS-034;ESS-028;ESS-037;ROT-ESS-15;ROT-ESS-18",
   "handbook_source_keys": "Sandia 2015",
   "standards": "STD-008",
   "public_source_keys": ""
  },
  {
   "card": "B-03",
   "section": "B",
   "question": "Why does a 1 MWh battery not deliver 1 MWh?",
   "handbook_entries": "ESS-029;ESS-026;ESS-031;ROT-ESS-08;ROT-ESS-16;ROT-ESS-10;ROT-ESS-28;ROT-ESS-20",
   "handbook_source_keys": "Sandia 2015",
   "standards": "STD-008;STD-009;STD-091",
   "public_source_keys": ""
  },
  {
   "card": "B-04",
   "section": "B",
   "question": "Which battery duration fits which job?",
   "handbook_entries": "ROT-ESS-15;ROT-ESS-04;ESS-031;ESS-007;ESS-033;ESS-036;ESS-043",
   "handbook_source_keys": "Sandia 2015",
   "standards": "STD-001;STD-008;STD-009;STD-012;STD-014;STD-091",
   "public_source_keys": ""
  },
  {
   "card": "B-05",
   "section": "B",
   "question": "How many cycles and years will the battery last?",
   "handbook_entries": "ROT-ESS-10;ESS-042;ESS-018;ESS-019;ESS-021;ROT-ESS-11",
   "handbook_source_keys": "Linden's Handbook 2011;Naumann et al. 2018;Naumann et al. 2020;Sandia 2015;Schmalstieg et al. 2014;Smith et al. 2017;Xu et al. 2018",
   "standards": "STD-008",
   "public_source_keys": ""
  },
  {
   "card": "B-06",
   "section": "B",
   "question": "LFP or NMC — what is the difference?",
   "handbook_entries": "ROT-ESS-08;ROT-ESS-10;ROT-ESS-11;ROT-ESS-12;ROT-ESS-03;ESS-002;ESS-019",
   "handbook_source_keys": "Linden's Handbook 2011;Naumann et al. 2018;Naumann et al. 2020;PNNL 2022;Schmalstieg et al. 2014;Smith et al. 2017",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "B-07",
   "section": "B",
   "question": "What do heat and cold do to a battery?",
   "handbook_entries": "ROT-ESS-09;ESS-020;ROT-ESS-12;ROT-ESS-11;ESS-026;ESS-022",
   "handbook_source_keys": "Naumann et al. 2018;Sandia 2015;Schmalstieg et al. 2014;Waldmann et al. 2014",
   "standards": "STD-008;STD-076;STD-092",
   "public_source_keys": ""
  },
  {
   "card": "B-08",
   "section": "B",
   "question": "How fast can the battery recharge after it is used?",
   "handbook_entries": "ESS-037;ROT-ESS-19;ROT-ESS-12;ESS-038;ESS-007;ROT-ESS-20",
   "handbook_source_keys": "",
   "standards": "STD-008;STD-014;STD-091",
   "public_source_keys": ""
  },
  {
   "card": "B-09",
   "section": "B",
   "question": "What is augmentation, and should I plan for it?",
   "handbook_entries": "ROT-ESS-21;ROT-ECON-07;ESS-040;ESS-041;ROT-ESS-10",
   "handbook_source_keys": "PNNL 2020",
   "standards": "STD-008",
   "public_source_keys": ""
  },
  {
   "card": "B-10",
   "section": "B",
   "question": "How much power does the battery use itself?",
   "handbook_entries": "ROT-ESS-28;ROT-ECON-06;ESS-039;ESS-049;ESS-027",
   "handbook_source_keys": "NREL ATB 2024;PNNL 2020",
   "standards": "STD-008;STD-009;STD-014",
   "public_source_keys": ""
  },
  {
   "card": "B-11",
   "section": "B",
   "question": "What does the battery management system actually do?",
   "handbook_entries": "ESS-044;ESS-014;ESS-046;ESS-047;ROT-ESS-02;ROT-ESS-07;ROT-ESS-23",
   "handbook_source_keys": "Plett 2015",
   "standards": "STD-008;STD-072;STD-076;STD-089;STD-092;STD-186",
   "public_source_keys": ""
  },
  {
   "card": "B-12",
   "section": "B",
   "question": "Sodium-ion or flow batteries: are they worth a look?",
   "handbook_entries": "ROT-ESS-03;ESS-002;ROT-ESS-12;ROT-ESS-08;ROT-COM-13",
   "handbook_source_keys": "Linden's Handbook 2011;PNNL 2022",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "B-13",
   "section": "B",
   "question": "What state of charge window should I plan around?",
   "handbook_entries": "ROT-ESS-08;ESS-017;ESS-043;ESS-026;ROT-ESS-02;ROT-ESS-11;ROT-ESS-22",
   "handbook_source_keys": "Sandia 2015",
   "standards": "STD-008;STD-012;STD-014",
   "public_source_keys": ""
  },
  {
   "card": "B-14",
   "section": "B",
   "question": "How much heat does a battery make?",
   "handbook_entries": "ROT-ESS-27;ESS-023;ESS-048;ROT-ESS-13;ESS-049",
   "handbook_source_keys": "Bernardi et al. 1985;Plett 2015",
   "standards": "STD-008;STD-072",
   "public_source_keys": ""
  },
  {
   "card": "B-15",
   "section": "B",
   "question": "What makes a new battery technology bankable?",
   "handbook_entries": "ROT-ECON-19;ECON-033;ROT-ECON-23;ECON-041;STD-005;STD-008;ROT-STD-06;ROT-STD-07",
   "handbook_source_keys": "PNNL & Sandia 2016;Yescombe 2014",
   "standards": "STD-008;STD-065;STD-072;STD-073",
   "public_source_keys": "S1;S3;S4;S6"
  },
  {
   "card": "B-16",
   "section": "B",
   "question": "Sodium-ion chemistries: which is which, and how close are they?",
   "handbook_entries": "ROT-ESS-03;ESS-003;ESS-002;ROT-STD-06",
   "handbook_source_keys": "Linden's Handbook 2011;PNNL 2022",
   "standards": "STD-060;STD-072;STD-076",
   "public_source_keys": "S11;S13;S14;S15;S19;S20;S25;S9"
  },
  {
   "card": "B-17",
   "section": "B",
   "question": "Beyond lithium and sodium: which long-duration technologies are getting close?",
   "handbook_entries": "ESS-002;ESS-008;ESS-039;STD-005",
   "handbook_source_keys": "Linden's Handbook 2011;NREL ATB 2024;PNNL 2020;PNNL 2022",
   "standards": "STD-009;STD-065;STD-072;STD-073",
   "public_source_keys": "S36;S37"
  },
  {
   "card": "I-01",
   "section": "I",
   "question": "How big an inverter do I need, and why is it rated in kVA instead of kW?",
   "handbook_entries": "FUN-009;FUN-017;PCS-001;PCS-003;ROT-ESS-17;ROT-FUN-06;ROT-MG-02;ROT-PCS-01",
   "handbook_source_keys": "Glover et al. 2017;Grainger & Stevenson 1994;Kundur 1994",
   "standards": "STD-001;STD-003;STD-006;STD-060;STD-075;STD-130",
   "public_source_keys": ""
  },
  {
   "card": "I-02",
   "section": "I",
   "question": "How efficient is an inverter?",
   "handbook_entries": "PCS-006;PCS-007;PCS-014;PCS-027;ROT-PCS-03;ROT-COM-11",
   "handbook_source_keys": "Driesse et al. 2008;NREL 2017;Sandia 2004;Sandia 2007;Teodorescu et al. 2011",
   "standards": "STD-014;STD-188;STD-201",
   "public_source_keys": ""
  },
  {
   "card": "I-03",
   "section": "I",
   "question": "Can the battery inverter start my motors when the grid is down?",
   "handbook_entries": "PCS-024;PCS-010;LOAD-023;ROT-PCS-11;ROT-PCS-06;ROT-LOAD-10;ROT-MG-12",
   "handbook_source_keys": "",
   "standards": "STD-001;STD-157;STD-172",
   "public_source_keys": ""
  },
  {
   "card": "I-04",
   "section": "I",
   "question": "Grid-forming or grid-following: what is the difference?",
   "handbook_entries": "PCS-022;PCS-023;PCS-026;ROT-PCS-06;ROT-PCS-10;ROT-PCS-13;ROT-PCS-14;ROT-SYS-22",
   "handbook_source_keys": "Kundur 1994;NERC 2017;UNIFI 2022",
   "standards": "STD-012;STD-019;STD-163",
   "public_source_keys": ""
  },
  {
   "card": "I-05",
   "section": "I",
   "question": "AC-coupled or DC-coupled solar-plus-storage?",
   "handbook_entries": "PCS-027;PCS-028;PCS-029;PCS-033;ROT-PCS-15;ROT-PCS-16;ROT-PCS-17;ROT-PCS-19;ROT-PV-04",
   "handbook_source_keys": "NREL 2017",
   "standards": "STD-014",
   "public_source_keys": ""
  },
  {
   "card": "I-06",
   "section": "I",
   "question": "How much does a hot or high-altitude site cut the inverter's rating?",
   "handbook_entries": "PCS-008;PCS-009;PCS-011;ROT-PCS-04;ROT-PCS-05",
   "handbook_source_keys": "",
   "standards": "STD-008;STD-075;STD-094",
   "public_source_keys": ""
  },
  {
   "card": "I-07",
   "section": "I",
   "question": "How much energy is lost going from solar to battery to the building?",
   "handbook_entries": "PCS-027;PCS-028;PCS-033;ROT-PCS-15;ROT-PCS-16;ROT-ESS-20",
   "handbook_source_keys": "NREL 2017",
   "standards": "STD-014",
   "public_source_keys": ""
  },
  {
   "card": "I-08",
   "section": "I",
   "question": "How much power does an inverter burn when it is not doing anything?",
   "handbook_entries": "PCS-012;PCS-006;ROT-PCS-07;ROT-ESS-28",
   "handbook_source_keys": "Driesse et al. 2008;Sandia 2007",
   "standards": "STD-006;STD-188",
   "public_source_keys": ""
  },
  {
   "card": "M-01",
   "section": "M",
   "question": "What happens the instant the grid fails, and how big a battery inverter catches it?",
   "handbook_entries": "MG-012;MG-013;ROT-MG-08;MG-001;MG-002;ROT-MG-02",
   "handbook_source_keys": "",
   "standards": "STD-001;STD-006;STD-012;STD-014",
   "public_source_keys": ""
  },
  {
   "card": "M-02",
   "section": "M",
   "question": "How long do the lights blink when the grid goes down?",
   "handbook_entries": "MG-010;MG-011;ROT-MG-06;ROT-MG-07",
   "handbook_source_keys": "ITI 2000",
   "standards": "STD-012;STD-013;STD-063;STD-105",
   "public_source_keys": ""
  },
  {
   "card": "M-03",
   "section": "M",
   "question": "Can we promise the customer a \"seamless\" transfer?",
   "handbook_entries": "ROT-MG-06;MG-010;MG-011;ROT-MG-07",
   "handbook_source_keys": "ITI 2000",
   "standards": "STD-012;STD-013;STD-063;STD-105",
   "public_source_keys": ""
  },
  {
   "card": "M-04",
   "section": "M",
   "question": "How does the system restart from dark, and how much battery charge should be held back for it?",
   "handbook_entries": "MG-018;MG-019;ROT-MG-11;ROT-MG-14;ESS-043;ROT-ESS-22",
   "handbook_source_keys": "Adibi 2000",
   "standards": "STD-012;STD-014",
   "public_source_keys": ""
  },
  {
   "card": "M-05",
   "section": "M",
   "question": "How much solar can an island run on?",
   "handbook_entries": "ROT-MG-16;ROT-MG-17;MG-028;MG-029;ROT-GEN-05;GEN-007",
   "handbook_source_keys": "Cummins T-030;Hunter & Elliot 1994;Lambert et al. 2006",
   "standards": "STD-012;STD-103",
   "public_source_keys": ""
  },
  {
   "card": "M-06",
   "section": "M",
   "question": "How much reserve should an island hold back?",
   "handbook_entries": "MG-030;MG-031;ROT-MG-18;ROT-GEN-07;CTRL-036;ROT-CTRL-18",
   "handbook_source_keys": "Kundur 1994;Marcos et al. 2011;Mills & Wiser 2010",
   "standards": "STD-001;STD-012;STD-104;STD-140;STD-246",
   "public_source_keys": ""
  },
  {
   "card": "M-07",
   "section": "M",
   "question": "How do generators and batteries share the load without talking to each other?",
   "handbook_entries": "CTRL-011;CTRL-012;CTRL-008;CTRL-010;CTRL-014;ROT-CTRL-05;ROT-CTRL-06;ROT-CTRL-07;ROT-CTRL-08",
   "handbook_source_keys": "Guerrero et al. 2011;Kundur 1994;Olivares et al. 2014;Rocabert et al. 2012",
   "standards": "STD-012;STD-105",
   "public_source_keys": ""
  },
  {
   "card": "M-08",
   "section": "M",
   "question": "What happens if the controller or communications fail?",
   "handbook_entries": "CTRL-006;ROT-CTRL-04;ROT-CTRL-03;ROT-CTRL-13;CTRL-005;CTRL-026",
   "handbook_source_keys": "",
   "standards": "STD-010;STD-012;STD-013;STD-095;STD-132;STD-137",
   "public_source_keys": ""
  },
  {
   "card": "M-09",
   "section": "M",
   "question": "In what order do loads come back after a blackout?",
   "handbook_entries": "MG-024;MG-021;MG-022;MG-023;ROT-MG-15;ROT-MG-12;ROT-MG-13;ROT-MG-14;ROT-CTRL-19;CTRL-038",
   "handbook_source_keys": "Adibi 2000;Ihara & Schweppe 1981;Kundur 1994",
   "standards": "STD-012;STD-048;STD-063;STD-113",
   "public_source_keys": ""
  },
  {
   "card": "P-01",
   "section": "P",
   "question": "Can we reuse the grid protection settings when the site is islanded?",
   "handbook_entries": "PROT-015;PROT-016;PROT-017;PROT-021;PROT-022;ROT-PROT-06;ROT-PROT-07;ROT-PROT-11",
   "handbook_source_keys": "Blackburn & Domin 2014;NERC 2018",
   "standards": "STD-001;STD-012;STD-017;STD-050;STD-105",
   "public_source_keys": ""
  },
  {
   "card": "P-02",
   "section": "P",
   "question": "Why does everyone keep asking about fault current, and where does it come from?",
   "handbook_entries": "PROT-002;PROT-009;PROT-011;PROT-012;PROT-014;PROT-015;ROT-PROT-02;ROT-PROT-03;ROT-PROT-05;ROT-ESS-24",
   "handbook_source_keys": "Glover et al. 2017;Grainger & Stevenson 1994;Kundur 1994;NERC 2018",
   "standards": "STD-001;STD-017;STD-030;STD-072;STD-156;STD-187",
   "public_source_keys": ""
  },
  {
   "card": "P-03",
   "section": "P",
   "question": "What happens to grounding when the grid is gone, and does the transfer switch need to switch the neutral?",
   "handbook_entries": "PROT-025;PROT-028;PROT-030;ROT-PROT-12;ROT-PROT-15;ROT-ESS-25",
   "handbook_source_keys": "Blackburn & Domin 2014",
   "standards": "STD-001;STD-002;STD-148;STD-153;STD-158",
   "public_source_keys": ""
  },
  {
   "card": "P-04",
   "section": "P",
   "question": "What is arc flash, and why can an island be more dangerous than the grid?",
   "handbook_entries": "PROT-040;PROT-041;PROT-042;PROT-044;ROT-PROT-21",
   "handbook_source_keys": "",
   "standards": "STD-021;STD-022;STD-031;STD-037;STD-050;STD-061",
   "public_source_keys": ""
  },
  {
   "card": "P-05",
   "section": "P",
   "question": "The vendor says the battery is UL certified. What does that actually prove?",
   "handbook_entries": "STD-005;STD-008;ROT-STD-05;ROT-STD-06;ROT-STD-08",
   "handbook_source_keys": "",
   "standards": "STD-065;STD-072;STD-073",
   "public_source_keys": ""
  },
  {
   "card": "P-06",
   "section": "P",
   "question": "What does the fire code actually care about for a battery?",
   "handbook_entries": "ESS-050;ESS-051;STD-006;STD-007;ROT-ESS-29",
   "handbook_source_keys": "",
   "standards": "STD-065;STD-070;STD-073;STD-211;STD-212",
   "public_source_keys": ""
  },
  {
   "card": "P-07",
   "section": "P",
   "question": "Who has to sign off before the system is safe to run?",
   "handbook_entries": "STD-007;STD-008;ROT-STD-07;ROT-PROT-05",
   "handbook_source_keys": "",
   "standards": "STD-065",
   "public_source_keys": ""
  },
  {
   "card": "Y-01",
   "section": "Y",
   "question": "How much room does a battery need per megawatt-hour?",
   "handbook_entries": "SYS-005;ROT-SYS-05;ESS-051",
   "handbook_source_keys": "PNNL 2022",
   "standards": "STD-065;STD-070;STD-073",
   "public_source_keys": ""
  },
  {
   "card": "Y-02",
   "section": "Y",
   "question": "How heavy is a battery container, and can my roof, slab or soil carry it?",
   "handbook_entries": "SYS-006;ROT-SYS-06;SYS-040",
   "handbook_source_keys": "",
   "standards": "STD-071",
   "public_source_keys": ""
  },
  {
   "card": "Y-03",
   "section": "Y",
   "question": "How much clearance and access does the battery need around it?",
   "handbook_entries": "ESS-051;STD-006;STD-007;SYS-005;ROT-SYS-05",
   "handbook_source_keys": "PNNL 2022",
   "standards": "STD-065;STD-070;STD-073",
   "public_source_keys": ""
  },
  {
   "card": "Y-04",
   "section": "Y",
   "question": "How loud will it be at the property line?",
   "handbook_entries": "SYS-039;ROT-SYS-24",
   "handbook_source_keys": "",
   "standards": "STD-221",
   "public_source_keys": ""
  },
  {
   "card": "Y-05",
   "section": "Y",
   "question": "What site problems should I check first, before anyone sizes anything?",
   "handbook_entries": "SYS-007;SYS-005;SYS-006;SYS-039;ROT-SYS-07",
   "handbook_source_keys": "DOE 2022;PNNL 2022",
   "standards": "STD-014;STD-065;STD-070;STD-071;STD-221",
   "public_source_keys": ""
  },
  {
   "card": "Y-06",
   "section": "Y",
   "question": "Besides the batteries, what does the yard need: pad, cable runs and its own power feed?",
   "handbook_entries": "SYS-002;ROT-SYS-02;ESS-049;ROT-ESS-28",
   "handbook_source_keys": "",
   "standards": "STD-008",
   "public_source_keys": ""
  },
  {
   "card": "C-01",
   "section": "C",
   "question": "What does an installed battery system cost, and what drives the price?",
   "handbook_entries": "ECON-001;ECON-003;ECON-010;ROT-ECON-03;ROT-ECON-04;ROT-ECON-09;ROT-ECON-02",
   "handbook_source_keys": "NREL ATB 2024;PNNL 2022;Ramasamy et al. 2023",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "C-02",
   "section": "C",
   "question": "Why does a longer-duration battery cost less per kWh but more per kW?",
   "handbook_entries": "ECON-002;ROT-ECON-01;ECON-001",
   "handbook_source_keys": "Cole & Ramasamy 2023;NREL ATB 2024;PNNL 2022;Ramasamy et al. 2023",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "C-03",
   "section": "C",
   "question": "What does a battery system cost to run each year?",
   "handbook_entries": "ECON-004;ROT-ECON-05;ROT-ECON-06;ECON-011;ROT-ESS-28",
   "handbook_source_keys": "EIA 2024;NIST HB 135;NREL ATB 2024;PNNL 2022;Short et al. 1995",
   "standards": "STD-065;STD-073",
   "public_source_keys": ""
  },
  {
   "card": "C-04",
   "section": "C",
   "question": "What do demand-charge savings look like, and when are they worth chasing?",
   "handbook_entries": "ECON-012;ECON-014;ECON-016;ROT-ECON-10;ROT-ECON-11;ROT-ECON-12;ROT-ECON-13",
   "handbook_source_keys": "NREL 2017;Sandia 2015",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "C-05",
   "section": "C",
   "question": "What is time-of-use shifting worth?",
   "handbook_entries": "ECON-017;ECON-018;ROT-ECON-14;ECON-041",
   "handbook_source_keys": "PNNL & Sandia 2016;RMI 2015;Sandia 2015",
   "standards": "STD-008",
   "public_source_keys": ""
  },
  {
   "card": "C-06",
   "section": "C",
   "question": "Payback, NPV and IRR: what do they each tell me?",
   "handbook_entries": "ECON-022;ECON-023;ECON-024;ECON-025;ECON-036;ECON-040;ROT-ECON-16;ROT-ECON-17",
   "handbook_source_keys": "Brealey et al. 2020;Fisher 1930;IRA 2022;NIST HB 135;PL 119-21;Short et al. 1995",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "C-07",
   "section": "C",
   "question": "What does levelized cost of storage mean, and when is a quoted figure meaningful?",
   "handbook_entries": "ECON-029;ECON-030;ECON-031;ECON-008;ROT-ECON-18",
   "handbook_source_keys": "Jülch 2016;Lazard 2024;Schmidt et al. 2019;Short et al. 1995",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "C-08",
   "section": "C",
   "question": "Which savings can one battery stack, and which collide?",
   "handbook_entries": "ECON-021;ROT-ECON-15;ECON-041;ROT-ECON-23",
   "handbook_source_keys": "PNNL & Sandia 2016;RMI 2015;Sandia 2015",
   "standards": "STD-008",
   "public_source_keys": ""
  },
  {
   "card": "C-09",
   "section": "C",
   "question": "What does a battery warranty really promise?",
   "handbook_entries": "ECON-041;ECON-042;ECON-043;ROT-ECON-23;ROT-ECON-24",
   "handbook_source_keys": "PNNL & Sandia 2016",
   "standards": "STD-008;STD-091",
   "public_source_keys": ""
  },
  {
   "card": "C-10",
   "section": "C",
   "question": "What kills the economics of a battery project?",
   "handbook_entries": "ECON-022;ECON-035;ROT-ECON-20;ROT-ECON-22;ROT-ECON-12;ROT-ECON-13",
   "handbook_source_keys": "Brealey et al. 2020;NIST HB 135;Short et al. 1995",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "C-11",
   "section": "C",
   "question": "What does it cost to augment or replace a battery over its life?",
   "handbook_entries": "ECON-005;ECON-006;ECON-007;ROT-ECON-07;ROT-ECON-08;ROT-ESS-21",
   "handbook_source_keys": "Cole & Ramasamy 2023;NIST HB 135;NREL ATB 2024;Short et al. 1995",
   "standards": "STD-065;STD-174;STD-242",
   "public_source_keys": ""
  },
  {
   "card": "X-01",
   "section": "X",
   "question": "How does interconnection work, and how long does it take?",
   "handbook_entries": "SYS-032;ROT-SYS-21;ROT-SYS-07;ROT-STD-13;ROT-STD-11;STD-012",
   "handbook_source_keys": "CA Rule 21;NY SIR;Rule 14H",
   "standards": "STD-001;STD-003;STD-006;STD-060",
   "public_source_keys": ""
  },
  {
   "card": "X-02",
   "section": "X",
   "question": "Can we export to the grid, and which screens will the utility run?",
   "handbook_entries": "SYS-032;SYS-033;SYS-034;SYS-035;ROT-SYS-21;ROT-SYS-22",
   "handbook_source_keys": "CA Rule 21;FERC Order 2006;FERC Order 792;NREL 2012",
   "standards": "STD-001;STD-004;STD-006;STD-048;STD-060",
   "public_source_keys": ""
  },
  {
   "card": "X-03",
   "section": "X",
   "question": "Which standard is which: UL 9540, UL 9540A, UL 1741, IEEE 1547, NFPA 855 and the electrical code?",
   "handbook_entries": "ROT-STD-01;ROT-STD-05;ROT-STD-06;STD-005;STD-009;ROT-STD-09",
   "handbook_source_keys": "",
   "standards": "STD-001;STD-003;STD-006;STD-065;STD-072;STD-073;STD-075",
   "public_source_keys": ""
  },
  {
   "card": "X-04",
   "section": "X",
   "question": "What permits do we need, who approves them, and how long does it take?",
   "handbook_entries": "STD-002;ROT-STD-02;ROT-STD-03;ROT-STD-13;ROT-STD-01;STD-003",
   "handbook_source_keys": "40 CFR 60 IIII;40 CFR 60 JJJJ;40 CFR 63 ZZZZ",
   "standards": "STD-060;STD-071",
   "public_source_keys": ""
  },
  {
   "card": "X-05",
   "section": "X",
   "question": "What usually sets the schedule, and how long do long-lead items take?",
   "handbook_entries": "ROT-COM-06;ROT-SYS-07;ROT-COM-02;ROT-STD-10;ROT-STD-11;ROT-STD-06;COM-003",
   "handbook_source_keys": "",
   "standards": "STD-008",
   "public_source_keys": ""
  },
  {
   "card": "X-06",
   "section": "X",
   "question": "What documents does the project owe, and to whom?",
   "handbook_entries": "STD-013;STD-008;STD-014;ROT-STD-04;ROT-STD-07;ROT-STD-12;ROT-SYS-23",
   "handbook_source_keys": "",
   "standards": "STD-022;STD-062;STD-065;STD-070",
   "public_source_keys": ""
  },
  {
   "card": "X-07",
   "section": "X",
   "question": "Which studies happen when?",
   "handbook_entries": "ROT-SYS-22;ROT-SYS-21;ROT-SYS-23;STD-007;STD-006;ROT-STD-15;SYS-037",
   "handbook_source_keys": "IREC 2017;NREL 2012",
   "standards": "STD-004;STD-065;STD-070;STD-073",
   "public_source_keys": ""
  },
  {
   "card": "Q-01",
   "section": "Q",
   "question": "What gets tested before the system is handed over?",
   "handbook_entries": "COM-007;COM-009;COM-010;ROT-COM-09;ROT-COM-07;ROT-COM-12;ROT-STD-11",
   "handbook_source_keys": "",
   "standards": "STD-003;STD-012;STD-013;STD-023;STD-113",
   "public_source_keys": ""
  },
  {
   "card": "Q-02",
   "section": "Q",
   "question": "How is round-trip efficiency measured, and why does the meter location change the answer?",
   "handbook_entries": "COM-014;COM-012;COM-015;ROT-COM-13;ROT-COM-14;ROT-COM-11;ROT-ESS-20",
   "handbook_source_keys": "JCGM 100:2008;PNNL & Sandia 2016;PNNL 2020",
   "standards": "STD-009;STD-091;STD-123;STD-144",
   "public_source_keys": ""
  },
  {
   "card": "Q-03",
   "section": "Q",
   "question": "How is availability measured?",
   "handbook_entries": "COM-017;ROT-ECON-24;COM-025;ROT-COM-19;ROT-SYS-14",
   "handbook_source_keys": "",
   "standards": "STD-008;STD-051;STD-052",
   "public_source_keys": ""
  },
  {
   "card": "Q-04",
   "section": "Q",
   "question": "How is battery capacity tracked over its life?",
   "handbook_entries": "COM-018;ROT-COM-16;ROT-COM-10;ROT-COM-14;COM-030;ROT-COM-23",
   "handbook_source_keys": "PNNL & Sandia 2016",
   "standards": "STD-008;STD-009;STD-091",
   "public_source_keys": ""
  },
  {
   "card": "Q-05",
   "section": "Q",
   "question": "What does routine maintenance look like?",
   "handbook_entries": "ROT-COM-18;ROT-COM-22;ROT-COM-20;ROT-COM-19;COM-024;COM-028;COM-026",
   "handbook_source_keys": "ASHRAE Handbook—Fundamentals;Barlow & Proschan 1965;Moubray 1997",
   "standards": "STD-051;STD-052",
   "public_source_keys": ""
  },
  {
   "card": "Q-06",
   "section": "Q",
   "question": "What usually goes wrong first?",
   "handbook_entries": "ROT-COM-21;ROT-COM-17;ROT-COM-22;ROT-COM-18;COM-019;COM-029",
   "handbook_source_keys": "",
   "standards": "STD-008",
   "public_source_keys": ""
  },
  {
   "card": "N-01",
   "section": "N",
   "question": "What does a 500 kW / 2 MWh battery really do for an office's demand bill?",
   "handbook_entries": "EX-A-01;EX-A-02;EX-A-03;EX-A-07;EX-A-08;EX-A-09",
   "handbook_source_keys": "NREL 2017",
   "standards": "STD-001;STD-008",
   "public_source_keys": ""
  },
  {
   "card": "N-02",
   "section": "N",
   "question": "What can solar and a battery add to a hospital that already has backup generators?",
   "handbook_entries": "EX-B-01;EX-B-02;EX-B-04;EX-B-05;EX-B-06;EX-B-10;EX-B-11",
   "handbook_source_keys": "ITI 2000",
   "standards": "STD-060;STD-063;STD-072;STD-112;STD-209",
   "public_source_keys": ""
  },
  {
   "card": "N-03",
   "section": "N",
   "question": "Does solar plus a battery beat diesel alone for an off-grid community?",
   "handbook_entries": "EX-C-01;EX-C-03;EX-C-04;EX-C-05;EX-C-08;EX-C-09;EX-C-10;EX-C-12;EX-C-13",
   "handbook_source_keys": "",
   "standards": "",
   "public_source_keys": ""
  },
  {
   "card": "N-04",
   "section": "N",
   "question": "Is a battery worth it for a factory that already runs combined heat and power (CHP)?",
   "handbook_entries": "EX-D-01;EX-D-02;EX-D-03;EX-D-04;EX-D-07;EX-D-08;EX-D-10",
   "handbook_source_keys": "",
   "standards": "STD-012;STD-021;STD-022;STD-050;STD-061;STD-133;STD-157",
   "public_source_keys": ""
  },
  {
   "card": "N-05",
   "section": "N",
   "question": "What does it take for a 5 MW / 20 MWh grid battery to keep its promise for 20 years?",
   "handbook_entries": "EX-E-01;EX-E-02;EX-E-03;EX-E-05;EX-E-06;EX-E-10;EX-E-11;EX-E-12",
   "handbook_source_keys": "Cole & Ramasamy 2023;Lazard 2024;NREL ATB 2024;PNNL & Sandia 2016;PNNL 2022;Schmidt et al. 2019",
   "standards": "STD-001;STD-008;STD-009;STD-075;STD-091",
   "public_source_keys": ""
  },
  {
   "card": "N-06",
   "section": "N",
   "question": "Should a data center use its batteries for demand response?",
   "handbook_entries": "EX-F-01;EX-F-02;EX-F-03;EX-F-06;EX-F-10;EX-F-12",
   "handbook_source_keys": "",
   "standards": "STD-051;STD-112",
   "public_source_keys": ""
  },
  {
   "card": "T-01",
   "section": "T",
   "question": "What should I ask on the first call, based on what the customer wants?",
   "handbook_entries": "SYS-001;ROT-SYS-01;ROT-SYS-03;ROT-ECON-10;ROT-ECON-13;ROT-MG-06;ECON-012",
   "handbook_source_keys": "NREL 2017;Sandia 2015",
   "standards": "STD-014;STD-103",
   "public_source_keys": ""
  },
  {
   "card": "T-02",
   "section": "T",
   "question": "What red flags mean I should slow down before quoting?",
   "handbook_entries": "SYS-007;ROT-SYS-06;ROT-SYS-07;ROT-SYS-08;ROT-ECON-11;ROT-ECON-12;ROT-ECON-22;ROT-MG-06;ECON-014;ECON-020",
   "handbook_source_keys": "DOE 2022;NLR URDB;NREL 2017",
   "standards": "STD-014",
   "public_source_keys": ""
  },
  {
   "card": "T-03",
   "section": "T",
   "question": "What should I never promise, and what do I say instead?",
   "handbook_entries": "MG-010;MG-011;EX-A-01;EX-A-07;ROT-ECON-12;ROT-ECON-15;ECON-041;ECON-042;ECON-043;ROT-PROT-06",
   "handbook_source_keys": "ITI 2000;NREL 2017;PNNL & Sandia 2016",
   "standards": "STD-008;STD-012;STD-013;STD-063;STD-091;STD-105",
   "public_source_keys": ""
  },
  {
   "card": "T-04",
   "section": "T",
   "question": "Who do I bring in, and which study answers which question?",
   "handbook_entries": "SYS-001;MG-010;PROT-017;PROT-022;ROT-PROT-11;ROT-SYS-07;ECON-022",
   "handbook_source_keys": "Blackburn & Domin 2014;Brealey et al. 2020;ITI 2000;NIST HB 135;Short et al. 1995",
   "standards": "STD-012;STD-013;STD-014;STD-017;STD-050;STD-063;STD-103;STD-105",
   "public_source_keys": ""
  }
 ]
}