About me

Good intentions deserve good outcomes.

I'm Matt. I've spent my career working on energy projects, from power generation to energy efficiency, from project design to productization. This is the longer version of why I do what I do.

Matt Huber speaking at a podium at IEEE PES ISGT Latin America in San Juan

IEEE PES ISGT Latin America, San Juan, 2023.

What I believe

  1. Most people are trying to do the right thing.

    Projects don't fail because someone was lazy. They fail because everyone assumed someone else had it covered.

  2. The expensive mistake was cheap once.

    Almost every problem I've been called in to fix at commissioning was a line on a page months earlier. Finding it then costs an afternoon.

  3. Say the hard thing before the money moves.

    A bad answer early is a favor. A bad answer after the purchase order is a dispute.

  4. Good work should outlast the person who did it.

    If a system only runs while I'm standing next to it, I'm not finished.

How I got here

I started hands-on, as a consulting mechanical engineer in Rochester with a services business on the side. That is where I learned that drawings and buildings disagree more often than anyone admits.

Then the owner's side: more than 350 power upgrades and efficiency retrofits for large public and institutional owners, from equipment selection through commissioning. I saw which early decisions came back to bite.

At an energy services company I originated projects that cut operating costs by about a quarter, then founded a battery storage and microgrid business inside it and ran it from first concept to shipped product. Building the thing teaches you what a datasheet leaves out.

Today I hold the technology seat at a battery storage company alongside the independent work this site describes. The job has always been the same: figure out whether a technical decision will hold up once money and reputations are behind it, and say so before anyone signs.

Outcomes

  • $100M+

    in purchases of non-conforming product that customers avoided

  • $250M+

    in energy projects carried from contract to commissioning

  • 8

    energy product lines architected, built, or taken to market

  • 8

    patent filings in energy storage

Kikuyu, Kenya

Engineering Ministries International ยท March 2026

I love to fix things. In March 2026 that took me to a hospital outside Nairobi, where I led the electrical master plan for a 250-bed mission hospital that serves half a million people: one utility service instead of three, a ring loop with two paths to every building, solar and battery on the same ring, and a phased path the hospital can fund.

Proposed masterplan at a glance

  • 80+

    Buildings

    Across two hospital campuses

  • 20 years

    Planning horizon

    Infrastructure designed for long-term growth

  • ~1.9 MWp

    Proposed solar

    Rooftop and ground-mounted generation

  • 2.5 MWh

    Proposed storage

    Battery energy storage system

The fundamental change

Not an engineering drawing. The shapes are the campus in outline, and the lines are the idea: three separate services today, one connected system in the plan.

Conceptual diagram of the campus today: three separate utility services, each feeding its own group of buildings, with no connection between them Utility grid 2 1 3 Three services, no connection between them
Today Three independent utility services, each feeding its own group of buildings. None can back up another, and the systems behind them are aging.
Conceptual diagram of the proposed masterplan: one utility service feeding four switching nodes on an underground ring loop around the main campus, with spurs to the outlying clusters and a solar field and battery feeding the ring Utility grid Solar field Battery 1 2 3 4 One service One ring loop: power, water, sewer, fiber Masterplan concept
Proposed masterplan concept One utility service, four switching nodes on an underground ring loop, so every building has two paths to power. Solar and battery feed the same ring. The loop runs under a new ring road that also carries water, sewer, and fiber, and it is built in phases.

Read the full story

Where I've spoken

More than 15 talks and panels on storage, microgrids, and public power, including:

  • Denver, 2025Experience POWERLong-duration storage panel
  • Alaska, 2024NWPPA and APA Alaska Electric Utility ConferenceModular microgrids in remote Alaska
  • North Carolina, 2024NC Electric Meter SchoolEnd-of-line public power
  • San Juan, 2023IEEE PES ISGT Latin AmericaConference talk

Have a purchase, a project, or a company that needs a second set of eyes?