Back to the home page

Writing

Books

  • Cover of Microgrids and DER Quick Reference: dark navy, the title in large white type, and a column of colored section tabs down the right edge

    Paperback on Amazon ยท free web edition

    Microgrids and DER Quick Reference

    Rules of thumb for fast, defensible answers

    About 100 questions every energy project runs into, answered on one-page cards: a plain-language answer, a range you can say out loud, a 30-second example, what moves the number, and when to stop and call an engineer.

    For
    Developers, sales teams, engineers, and anyone new to the field
    Inside
    107 cards across batteries, solar, generators, inverters, microgrid behavior, cost, codes, and commissioning, plus a fundamentals FAQ, twelve numbers to know, six project snapshots, and a 255-term glossary
    Format
    8.5 by 11 in paperback, 150 pages, and a free web edition
    ISBN
    9798141707438 (paperback)
    Publisher
    Published through Amazon Kindle Direct Publishing (KDP)
    Read the free web edition Buy the paperback on Amazon (opens in a new tab)

    Screening aids, not engineering designs or a licensed engineering opinion. Anything that affects safety needs a qualified engineer.

    Sources and standards cited, as open data

  • In editorial review

    Microgrids & Distributed Energy Resources

    Equations, Data & Rules of Thumb

    A working reference for sizing, pricing, and checking microgrids and distributed energy systems. The equations, the typical numbers, and the rules of thumb, each with the reasoning behind it and worked design examples to test them against.

    For
    Engineers, developers, and owner's representatives
    Inside
    48 chapters, six worked design examples, and reference appendices
    Format
    Print and PDF, about 800 pages
    ISBN
    Assigned at publication

A question about a book, or about a project of your own? Book a call and we can talk it through.

Book a 30-minute call (opens in a new tab)