Sources for the Quick Reference
Microgrids and DER Quick Reference · Matthew W. Huber · Version 1.0
The guide's cards cite handbook entries and public sources. This page lists every one of them as plain files you can download, filter, copy and reuse. Nothing here needs an account.
- standards.csv
- public_sources.csv
- handbook_bibliography.csv
- card_index.csv
- references.json (everything)
License. The lists are released under CC BY 4.0: use them freely and credit Matthew W. Huber. The standards and papers listed belong to their publishers; this page only points to them.
Not advice. These lists support a guide of screening aids. They are not engineering, legal, tax or investment advice, and listing a source is not an endorsement or a guarantee that it is current or applies to your project. See the legal notice in the guide.
How to read it. Find a card ID printed in the guide (for example C-06) in the card index. It shows the handbook entries the card draws on, the bibliography keys those entries cite, and any public sources the card lists. Handbook entry IDs such as ECON-001 are the handbook's own numbering; the bibliography keys are what point to the outside world. Standards change edition often, so the standards list shows each edition, the date it was checked, and whether the check was full or partial. Always confirm the edition your project must follow with the publisher and the local authority.
Standards (259)
| Standard | Title | Edition to cite | Check | Checked | Source |
|---|---|---|---|---|---|
| IEEE 1547-2018 | IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces | 2018 | partial | 2026-11-09 | link |
| IEEE 1547a-2020 | IEEE Standard for Interconnection and Interoperability of DER with Associated EPS Interfaces - Amendment 1: To Provide More Flexibility for Adoption of Abnormal Operating Performance Category III | 2020 | partial | 2026-11-09 | link |
| IEEE 1547.1-2020 | IEEE Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces | 2020 (published 2020-05-21) | verified-web | 2026-11-09 | link |
| IEEE 1547.2-2023 | IEEE Application Guide for IEEE Std 1547 (title wording to confirm) | 2023 | partial | 2026-11-09 | link |
| IEEE 1547.3-2023 | IEEE Guide for Cybersecurity of Distributed Energy Resources Interconnected with Electric Power Systems | 2023 | partial | 2026-11-09 | link |
| IEEE 1547.9-2022 | IEEE Guide for Using IEEE Std 1547 for Interconnection of Energy Storage Distributed Energy Resources with Electric Power Systems | 2022 (published 2022-08-05) | verified-web | 2026-11-09 | link |
| IEEE 2030-2011 | IEEE Guide for Smart Grid Interoperability of Energy Technology and Information Technology Operation with the EPS, End-Use Applications, and Loads | 2011 | unverified | ||
| IEEE 2030.2.1-2019 (and 2030.2-2015) | IEEE Guide for Design, Operation, and Maintenance of Battery Energy Storage Systems, both Stationary and Mobile, and Applications Integrated with Electric Power Systems (2030.2.1); IEEE Guide for the Interoperability of Energy Storage Systems Integrated with the Electric Power Infrastructure (2030.2) | 2030.2.1-2019; 2030.2-2015 | unverified | ||
| IEEE 2030.3-2016 | IEEE Standard Test Procedures for Electric Energy Storage Equipment and Systems for Electric Power Systems Applications | 2016 | unverified | ||
| IEEE 2030.5-2023 | IEEE Standard for Smart Energy Profile Application Protocol | 2023 (board approval 2023-12-06; published 2024-12-11); Corrigendum 1-2024 rolled into base | verified-web | 2026-11-09 | link |
| IEEE 2030.5-2018 | IEEE Standard for Smart Energy Profile Application Protocol | 2018 (published 2018-12-21) | verified-web | 2026-11-09 | link |
| IEEE 2030.7-2017 | IEEE Standard for the Specification of Microgrid Controllers | 2017 | verified-web | 2026-11-09 | link |
| IEEE 2030.8-2018 | IEEE Standard for the Testing of Microgrid Controllers | 2018 | verified-web | 2026-11-09 | link |
| IEEE 2030.9-2019 | IEEE Recommended Practice for the Planning and Design of the Microgrid | 2019 | unverified | ||
| IEEE 2030.10-2021 | IEEE Standard for DC Microgrids for Rural and Remote Electricity Access Applications | 2021 | unverified | ||
| IEEE 2030.11-2021 | IEEE Guide for Distributed Energy Resources Management Systems (DERMS) Functional Specification | 2021 | unverified | ||
| IEEE 2030.12-2025 | IEEE Guide for the Design of Microgrid Protection Systems | 2025 (published 2025-10-23) | verified-web | 2026-11-09 | link |
| IEEE 519-2022 | IEEE Standard for Harmonic Control in Electric Power Systems | 2022 (published 2022-08-05) | verified-web | 2026-11-09 | link |
| IEEE 2800-2022 | IEEE Standard for Interconnection and Interoperability of Inverter-Based Resources (IBRs) Interconnecting with Associated Transmission Electric Power Systems | 2022 (board approval Feb 2022) | verified-web | 2026-11-09 | link |
| IEEE 2800.2-2026 | IEEE Recommended Practice for Test and Verification Procedures for Inverter-Based Resources Interconnecting with Bulk Power Systems | 2026 (resellers show 2026-06-30) | partial | 2026-11-09 | link |
| IEEE 1584-2018 | IEEE Guide for Performing Arc-Flash Hazard Calculations | 2018 (published Nov 2018) | verified-web | 2026-11-09 | link |
| IEEE 1584.1-2022 | IEEE Guide for the Specification of Scope and Deliverables of an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584 | 2022 (published 2022-07-12) | partial | 2026-11-09 | link |
| IEEE 1159-2019 | IEEE Recommended Practice for Monitoring Electric Power Quality | 2019 | unverified | ||
| IEEE 1453-2022 | IEEE Recommended Practice for the Analysis of Fluctuating Installations on Power Systems (flicker) | 2022 (to confirm) | unverified | ||
| IEEE 1100 | IEEE Recommended Practice for Powering and Grounding Electronic Equipment (Emerald Book) | 2005 last known; confirm if withdrawn/revised | unverified | ||
| IEEE 80-2013 | IEEE Guide for Safety in AC Substation Grounding | 2013 (corrected 2015) | unverified | ||
| IEEE C37.2-2022 | IEEE Standard for Electrical Power System Device Function Numbers, Acronyms, and Contact Designations | 2022 | partial | 2026-11-09 | link |
| IEEE C37.90 | IEEE Standard for Relays and Relay Systems Associated with Electric Power Apparatus | Edition unconfirmed (2005 listed as withdrawn) | unverified | ||
| IEEE C37.90.1-2012 | IEEE Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus | 2012 | unverified | ||
| IEEE C37.010 | IEEE Application Guide for AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis | 2016 (to confirm) | unverified | ||
| IEEE C37.04 | IEEE Standard for Ratings and Requirements for AC High-Voltage Circuit Breakers with Rated Maximum Voltage Above 1000 V | 2018 (to confirm) | unverified | ||
| IEEE C37.13 | IEEE Standard for Low-Voltage AC Power Circuit Breakers Used in Enclosures | 2015 (to confirm) | unverified | ||
| IEEE C37.20.1 | IEEE Standard for Metal-Enclosed Low-Voltage (1000 V ac and below, 3200 V dc and below) Power Circuit Breaker Switchgear | 2015 base; amendment C37.20.1a-2020 (control and secondary circuits) | partial | 2026-11-09 | |
| IEEE C37.20.2 | IEEE Standard for Metal-Clad Switchgear | 2015; newer edition (2022 or 2023) reported, conflicting | partial | 2026-11-09 | link |
| IEEE C37.20.3-2023 | IEEE Standard for Metal-Enclosed Interrupter Switchgear Rated above 1 kV AC up to and Including 48.3 kV AC | 2023 | partial | 2026-11-09 | |
| IEEE C37.100.1 | IEEE Standard of Common Requirements for High-Voltage Power Switchgear Rated above 1000 V | 2018 (to confirm) | unverified | ||
| IEEE C37.230 | IEEE Guide for Protective Relay Applications to Distribution Lines | 2020 (to confirm) | unverified | ||
| IEEE C37.233 | IEEE Guide for Power System Protection Testing | 2009 (to confirm) | unverified | ||
| IEEE C37.242 | IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control | 2013 (to confirm) | unverified | ||
| IEEE C37.95 | IEEE Guide for Protective Relaying of Utility-Consumer Interconnections | 2014 (to confirm) | unverified | ||
| IEEE C57.12.00-2021 | IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers | 2021 (published 2021-11-09) | verified-web | 2026-11-09 | link |
| IEEE C57.12.90 | IEEE Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers | 2021 (to confirm) | unverified | ||
| IEEE C57.110 | IEEE Recommended Practice for Establishing Liquid-Immersed and Dry-Type Power and Distribution Transformer Capability when Supplying Nonsinusoidal Load Currents | 2018 (to confirm) | unverified | ||
| IEEE C57.12.80 | IEEE Standard Terminology for Power and Distribution Transformers | 2010 (to confirm) | unverified | ||
| ANSI C84.1-2020 | American National Standard for Electric Power Systems and Equipment - Voltage Ratings (60 Hertz) | 2020 | unverified | ||
| IEEE C62.41.1 / C62.41.2 (with C62.45) | IEEE Guide / Recommended Practice on the Surge Environment and Characterization of Surges in Low-Voltage AC Power Circuits | C62.41.1-2002; C62.41.2-2002; C62.45-2002 (editions unconfirmed) | unverified | ||
| IEEE 3001 series | IEEE 3001.x - Recommended Practices for Industrial and Commercial Power System Design | Per-part editions vary; confirm each | unverified | link | |
| IEEE 3002 series | IEEE 3002.x - Recommended Practices for Industrial and Commercial Power System Analysis | Per-part editions vary | unverified | ||
| IEEE 3003 series | IEEE 3003.x - Recommended Practices for Industrial and Commercial Power System Grounding | Per-part editions vary | unverified | ||
| IEEE 3004 series | IEEE 3004.x - Recommended Practices for Industrial and Commercial Power System Protection and Coordination | Per-part editions vary | unverified | ||
| IEEE 3006 series | IEEE 3006.x - Recommended Practices for Industrial and Commercial Power System Reliability | Per-part editions vary | partial | 2026-11-09 | link |
| IEEE 3007 series | IEEE 3007.x - Recommended Practices for Industrial and Commercial Power System Operation, Maintenance and Safety | Per-part editions vary | partial | 2026-11-09 | |
| IEEE Color Books 141, 142, 241, 242, 399, 446, 493, 1015 | Red, Green, Gray, Buff, Brown, Orange, Gold, Blue Books | Last editions 1990s to 2000s | partial | 2026-11-09 | link |
| IEEE 1686-2022 | IEEE Standard for Intelligent Electronic Devices Cyber Security Capabilities | 2022 (to confirm) | unverified | ||
| IEEE 1815 (DNP3) | IEEE Standard for Electric Power Systems Communications - Distributed Network Protocol (DNP3) | 1815-2012 (Inactive-Reserved per listing); revision reported near ballot May 2025; no 1815-2022 found | partial | 2026-11-09 | |
| IEEE 1815.2-2025 | IEEE Standard for Distributed Network Protocol (DNP3) - DER profile (title wording unconfirmed) | 2025 (publication date 2026-02-05 per listing) | partial | 2026-11-09 | link |
| California Electric Rule 21 | Rule 21 Generating Facility Interconnection | Continuously amended; revision not confirmed | partial | 2026-11-09 | link |
| Hawaii Rule 14H | Hawaiian Electric Rule 14H Interconnection of Distributed Generating Systems | Version not confirmed | unverified | ||
| New York Standardized Interconnection Requirements (SIR) | Standardized Interconnection Requirements and Application Process for New Distributed Generators | Amended several times; storage up to 5 MW added Oct 2018; current version not confirmed | partial | 2026-11-09 | link |
| NFPA 70-2026 | National Electrical Code | 2026 (listed as published 2025-09-09) | verified-web | 2026-11-09 | link |
| NFPA 70E-2024 | Standard for Electrical Safety in the Workplace | 2024 (13th ed.) | partial | 2026-11-09 | link |
| NFPA 70B-2023 | Standard for Electrical Equipment Maintenance | 2023 (effective 2023-01-16) | partial | 2026-11-09 | link |
| NFPA 110-2025 | Standard for Emergency and Standby Power Systems | 2025 | partial | 2026-11-09 | link |
| NFPA 111-2025 | Standard on Stored Electrical Energy Emergency and Standby Power Systems | 2025 (per retailer listings) | partial | 2026-11-09 | link |
| NFPA 855-2026 | Standard for the Installation of Stationary Energy Storage Systems | 2026 (issued 2025-08-20; effective 2025-09-09 per Standards Council agenda); Errata 855-26-1 dated 2025-10-13 | verified-web | 2026-11-09 | link |
| NFPA 2-2023 | Hydrogen Technologies Code | 2023 | partial | 2026-11-09 | link |
| NFPA 37 | Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines | 2024 (published 2023-12-21; TIA 24-1 issued 2024-04-18); 2021 superseded; next edition 2027 in preparation | partial | 2026-11-09 | link |
| NFPA 1-2024 | Fire Code | 2024 | partial | 2026-11-09 | |
| NFPA 72-2025 | National Fire Alarm and Signaling Code | 2025 | partial | 2026-11-09 | |
| ICC IFC-2024 | International Fire Code (Section 1207 Electrical Energy Storage Systems) | 2024 | partial | 2026-11-09 | link |
| ICC IBC-2024 | International Building Code | 2024 | unverified | ||
| ANSI/CAN/UL 9540:2023 | Energy Storage Systems and Equipment | 3rd edition, 2023 (published 2023-06-28); revised Ed.3+R dated 2025-03-07, effective 2027-03-07 per Intertek notice | verified-web | 2026-11-09 | link |
| ANSI/CAN/UL 9540A | Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage Systems | 6th edition published 2026-03-13 | https://www.ul.com/offerings/ul-9540a-test-method | partial | 16;42 |
| UL 9540B | Large-Scale Fire Test for Residential Battery Energy Storage Systems (Outline of Investigation) | Outline of Investigation announced 2024-06-28; consensus-standard status unconfirmed | partial | 2026-11-09 | link |
| ANSI/CAN/UL 1741:2021 | Standard for Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources | 3rd edition 2021-09-28, revised (Ed.3+R) 2023-05-19 incorporating Supplement SB; a 2026 revision (ANSI webstore: adds Supplement SC for bidirectional EV supply equipment; sources differ on its date, May or August 2026); later 2025 Intertek notice effective 2027-10-22 | partial | 2026-11-09 | link |
| ANSI/CAN/UL 1973:2022 | Batteries for Use in Stationary and Motive Auxiliary Power Applications | 3rd edition, 2022-02-25; 2024 revision (Ed.3+R) added items | partial | 2026-11-09 | link |
| UL 1642 | Lithium Batteries | 5th edition 2012 (latest seen; possible later revisions) | unverified | ||
| UL 2580 | Batteries for Use in Electric Vehicles | 3rd edition (2020, to confirm) | unverified | ||
| UL 62109-1 | Safety of Power Converters for Use in Photovoltaic Power Systems - Part 1: General Requirements | 1st ed. 2014; a newer edition reportedly published (not confirmed) | unverified | link | |
| UL 1778 | Uninterruptible Power Systems | 5th edition 2014 (Ed.5+R 2023-04-28) | partial | 2026-11-09 | link |
| UL 891 | Switchboards | 12th edition 2019-07-19, revised 2025-03-21 (Ed.12+R); effective 2027-03-21 | partial | 2026-11-09 | link |
| UL 1558 | Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear | 2025-04-02 (listing) | partial | 2026-11-09 | |
| UL 489 | Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures | 2016 (listing); newer revision possible | partial | 2026-11-09 | |
| ANSI/CAN/UL 3741 | Photovoltaic Hazard Control | 1st edition 2020 (published 2020-12-08); revision 2025-10-20 (effective 2027-10-20) | partial | 2026-11-09 | link |
| UL 2703 | Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels | 1st edition 2015-01-28 with revisions (16 Dec 2019; 11 Jun 2025); ANSI store lists 2026 publication | partial | 2026-11-09 | link |
| UL 62133-2 | Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes - Safety Requirements for Portable Sealed Secondary Cells... Part 2: Lithium Systems | Edition not confirmed | unverified | ||
| ANSI/UL 1699B | Photovoltaic (PV) DC Arc-Fault Circuit Protection | 1st edition 2018 (listing shows published 2024-07-09, likely revision) | partial | 2026-11-09 | link |
| UL 1974 | Evaluation for Repurposing Batteries | 2nd edition, ANSI/CAN/UL 1974:2023 (published 2023-11-09/10); title now Evaluation for Repurposing or Remanufacturing Batteries | partial | 2026-11-09 | link |
| IEC 62933-5-2:2025 | Electrical Energy Storage (EES) Systems - Part 5-2: Safety Requirements for Grid-Integrated EES Systems - Electrochemical-Based Systems | Edition 2, 2025 (published 2025-12-08) | verified-web | 2026-11-09 | link |
| IEC 62933-5-1 | EES Systems - Part 5-1: Safety Considerations for Grid-Integrated EES Systems - General Specification | 2017 (+ amendment; to confirm) | unverified | ||
| IEC 62933-2-1 | EES Systems - Part 2-1: Unit Parameters and Testing Methods - General Specification | 2017 (to confirm) | unverified | ||
| IEC 62619 | Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes - Safety Requirements for Secondary Lithium Cells and Batteries for Use in Industrial Applications | Edition 2, 2022 | partial | 2026-11-09 | |
| IEC 62620 | Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes - Large Format Secondary Lithium Cells and Batteries for Use in Industrial Applications | Edition not confirmed | unverified | ||
| IEC 62477-1:2022 | Safety Requirements for Power Electronic Converter Systems and Equipment - Part 1: General | Edition 2.0, 2022 (May); EN IEC 62477-1:2023/2024 European versions | verified-web | 2026-11-09 | link |
| IEC 61850 series | Communication Networks and Systems for Power Utility Automation | Multi-part, parts versioned separately (e.g. 61850-7-420 for DER) | unverified | ||
| IEC TR 61850-90-7 | Object Models for Power Converters in Distributed Energy Resources (DER) Systems | 2013 (technical report) | unverified | ||
| IEC 61400-1 | Wind Energy Generation Systems - Part 1: Design Requirements | Edition 4, 2019 | unverified | ||
| IEC 61400-12-1 | Wind Energy Generation Systems - Part 12-1: Power Performance Measurements of Electricity Producing Wind Turbines | Edition 3, 2022 (published 2022-09-05; Cor. 1 of 2025-05 included) | verified-web | 2026-11-09 | link |
| IEC 61724-1 | Photovoltaic System Performance - Part 1: Monitoring | Edition 2, 2021 (to confirm) | unverified | ||
| IEC 60909-0 | Short-Circuit Currents in Three-Phase AC Systems - Part 0: Calculation of Currents | Edition 2, 2016 (to confirm) | unverified | ||
| IEC 60076 series | Power Transformers | Parts versioned separately (e.g. 60076-1:2011) | unverified | ||
| IEC 62040-3 | Uninterruptible Power Systems (UPS) - Part 3: Method of Specifying the Performance and Test Requirements | Edition 3.0, 2021 | partial | 2026-11-09 | |
| IEC TS 62898-1 | Microgrids - Part 1: Guidelines for Microgrid Projects Planning and Specification | TS ed. 1, 2017 + AMD1:2023 (published 2023-08-29) | partial | 2026-11-09 | link |
| IEC TS 62898-2 | Microgrids - Part 2: Guidelines for Operation | TS ed. 1, 2018 (to confirm) | unverified | ||
| IEC TS 62898-3-1 | Microgrids - Part 3-1: Technical Requirements - Protection and Dynamic Control | TS ed. 1, 2020 + AMD1:2023 (consolidated CSV available) | partial | 2026-11-09 | link |
| IEC 62443 series | Industrial Communication Networks - Network and System Security | Parts versioned separately | unverified | ||
| IEC 60364 series | Low-Voltage Electrical Installations | Parts versioned separately | unverified | ||
| IEC 61439 series | Low-Voltage Switchgear and Controlgear Assemblies | 61439-1 Edition 3 2020 (to confirm) | unverified | ||
| IEC 62271 series | High-Voltage Switchgear and Controlgear | Parts versioned separately | unverified | ||
| IEC 61000-4-30 | EMC - Part 4-30: Testing and Measurement Techniques - Power Quality Measurement Methods | Edition 3 2015 + AMD1:2021 (to confirm; ed. 4 may exist) | unverified | ||
| IEC TR 61000-3-6 / -3-7 | EMC - Assessment of Emission Limits for Distorting Loads / Fluctuating Loads in MV and HV Power Systems | Ed. 2, 2008 (to confirm; newer edition possible) | unverified | ||
| ISO 8528-1:2018 | Reciprocating Internal Combustion Engine Driven Alternating Current Generating Sets - Part 1: Application, Ratings and Performance | 2018 (revision in progress) | partial | 2026-11-09 | link |
| ISO 8528-5 | Reciprocating Internal Combustion Engine Driven AC Generating Sets - Part 5: Generating Sets | 2025 (edition 6 per listing); 2018 listed historical | partial | 2026-11-09 | link |
| ANSI/NETA ATS-2025 | Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems | 2025 (ANSI approved 2025-02-20) | verified-web | 2026-11-09 | link |
| ANSI/NETA MTS-2023 | Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems | 2023 | partial | 2026-11-09 | |
| SAE J1772 | SAE Electric Vehicle and Plug in Hybrid Electric Vehicle Conductive Charge Coupler | Edition not confirmed (check 2024-2025 revision) | unverified | ||
| SAE J3400 | North American Charging System (NACS) for Electric Vehicles | J3400_202409 (revised Sept 2024); J3400/1_202504 adapter | verified-web | 2026-11-09 | link |
| FERC Order No. 2222 | Participation of Distributed Energy Resource Aggregations in Markets Operated by RTOs and ISOs | Issued 2020-09-17 (compliance ongoing) | partial | 2026-11-09 | |
| FERC Order No. 841 | Electric Storage Participation in Markets Operated by RTOs and ISOs | Issued 2018-02-15 | unverified | ||
| NERC PRC-024-4 | Frequency and Voltage Protection Settings for Generating Resources | PRC-024-4 (FERC Order 909, 2025-07-24) | verified-web | 2026-11-09 | link |
| NERC PRC-029-1 | Frequency and Voltage Ride-through Requirements for Inverter-Based Resources | PRC-029-1 (FERC Order 909, 2025-07-24); main effective date reported 2026-10-01 | verified-web | 2026-11-09 | link |
| NERC CIP series | Critical Infrastructure Protection Reliability Standards (CIP-002 and others) | Versions differ per standard | unverified | ||
| ANSI C12.20 | American National Standard for Electricity Meters - 0.1, 0.2, and 0.5 Accuracy Classes | 2015 (to confirm) | unverified | ||
| ANSI/ASHRAE/IES 90.1 | Energy Standard for Sites and Buildings Except Low-Rise Residential Buildings | 2022 (to confirm; newer cycle possible) | unverified | ||
| OSHA 29 CFR 1910.269 | Electric Power Generation, Transmission, and Distribution | Current CFR | unverified | ||
| OSHA 29 CFR 1910 Subpart S | Electrical | Current CFR | unverified | ||
| 40 CFR Part 60 Subpart IIII | Standards of Performance for Stationary Compression Ignition Internal Combustion Engines (NSPS) | Current CFR | unverified | ||
| 40 CFR Part 60 Subpart JJJJ | Standards of Performance for Stationary Spark Ignition Internal Combustion Engines (NSPS) | Current CFR | unverified | ||
| 40 CFR Part 63 Subpart ZZZZ | NESHAP for Stationary Reciprocating Internal Combustion Engines | Current CFR (court-driven changes to emergency engine rules) | unverified | ||
| IEEE 1459 | IEEE Standard Definitions for the Measurement of Electric Power Quantities Under Sinusoidal, Nonsinusoidal, Balanced, or Unbalanced Conditions | 1459-2025 (current); 1459-2010 is Inactive-Reserved (inactivated 2021-03-25) | partial | 2026-11-09 | link |
| IEEE 1366-2022 | IEEE Guide for Electric Power Distribution Reliability Indices | 2022 (resellers: published Nov 2022) | partial | 2026-11-09 | link |
| IEEE 1588-2019 | IEEE Standard for a Precision Clock Synchronization Protocol for Networked Measurement and Control Systems | 2019 (approved 2019-11-07) | partial | 2026-11-09 | link |
| IEEE C37.112-2018 | IEEE Standard for Inverse-Time Characteristics Equations for Overcurrent Relays | 2018 (published 2019-02-05) | verified-web | 2026-11-09 | link |
| IEEE C37.102-2023 | IEEE Guide for AC Generator Protection | 2023 (resellers: released 2024-06) | verified-web | 2026-11-09 | link |
| IEEE C37.110-2023 | IEEE Guide for the Application of Current Transformers Used for Protective Relaying Purposes | 2023 (approved 2023-05-24) | verified-web | 2026-11-09 | link |
| IEEE C37.111-2013 (IEEE/IEC 60255-24) | IEEE/IEC International Standard - Measuring Relays and Protection Equipment - Part 24: Common Format for Transient Data Exchange (COMTRADE) for Power Systems | 2013 (also IEC 60255-24:2013 Ed. 2) | partial | 2026-11-09 | link |
| IEEE C37.118.1 (superseded by IEEE/IEC 60255-118-1-2018) | IEEE Standard for Synchrophasor Measurements for Power Systems / IEEE/IEC 60255-118-1 | IEEE/IEC 60255-118-1-2018 (published 2018-12-19) is current; C37.118.1-2011 and amendment C37.118.1a-2014 are Superseded | verified-web | 2026-11-09 | link |
| IEEE C37.238-2017 | IEEE Standard Profile for Use of IEEE 1588 Precision Time Protocol in Power System Applications | 2017 (published 2017-06-19); amendment C37.238a-2023 (leap second TLV) | verified-web | 2026-11-09 | link |
| IEEE C37.101 | IEEE Guide for Generator Ground Protection | Edition not confirmed (2006 last known) | unverified | ||
| IEEE C37.117-2007 | IEEE Guide for the Application of Protective Relays Used for Abnormal Frequency Load Shedding and Restoration | 2007 (as cited; current status not confirmed) | unverified | ||
| IEEE C37.46 | IEEE Standard for High-Voltage Expulsion and Current-Limiting Type Power Class Fuses and Fuse Disconnecting Switches | Edition not confirmed | unverified | ||
| IEEE C37.06 | IEEE Standard for AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis - Preferred Ratings and Related Required Capabilities for Voltages Above 1000 V | 2009 (to confirm) | unverified | ||
| IEEE C37.20.7-2024 | IEEE Recommended Practice for Testing Switchgear Rated Up to 52 kV for Internal Arcing Faults | 2024 (reseller listing shows latest) | partial | 2026-11-09 | link |
| IEEE C57.13-2016 | IEEE Standard Requirements for Instrument Transformers | 2016 (published 2016-06-29) | partial | 2026-11-09 | link |
| IEEE C57.13.6-2005 | IEEE Standard for High Accuracy Instrument Transformers | 2005 (no later edition found) | partial | 2026-11-09 | link |
| IEEE C57.109-2018 | IEEE Guide for Liquid-Immersed Transformers Through-Fault-Current Duration | 2018 (published 2018-10-05); revision PAR approved 2026-02-12 | verified-web | 2026-11-09 | link |
| IEEE C57.12.59 | IEEE Guide for Dry-Type Transformer Through-Fault Current Duration | 2015 believed; not confirmed | unverified | ||
| IEEE C57.32-2015 | IEEE Standard for Requirements, Terminology, and Test Procedures for Neutral Grounding Devices | 2015; amendment C57.32a-2020; withdrawal reported by resellers (2026-03-26) while IEEE page shows Active; revision PAR active | partial | 2026-11-09 | link |
| IEEE C57.91 | IEEE Guide for Loading Mineral-Oil-Immersed Transformers and Step-Voltage Regulators | 2011 (+Cor 1-2012) believed; not confirmed | unverified | ||
| IEEE C57.96 | IEEE Guide for Loading Dry-Type Distribution and Power Transformers | 2013 believed; not confirmed | unverified | ||
| IEEE C57.159 | IEEE Guide on Transformers for Application in Distributed Photovoltaic (DPV) Power Generation Systems | 2016 believed; not confirmed | unverified | ||
| IEEE C57.12.01 | IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers | 2020 believed; not confirmed | unverified | ||
| IEEE C62.92 series (C62.92.1, C62.92.6) | IEEE Guide for Application of Neutral Grounding in Electrical Utility Systems (Parts I to VI) | Per-part editions vary; C62.92.6 believed 2017 | unverified | ||
| IEEE C2 (NESC) | National Electrical Safety Code | 2023 edition believed current; 2027 edition in development | unverified | ||
| IEEE 3002.2-2018 | IEEE Recommended Practice for Conducting Load-Flow Studies and Analysis of Industrial and Commercial Power Systems | 2018 | partial | 2026-11-09 | link |
| IEEE 3002.3-2018 | IEEE Recommended Practice for Conducting Short-Circuit Studies and Analysis of Industrial and Commercial Power Systems | 2018 (approved 2018-09-27; published 2019-03-29) | verified-web | 2026-11-09 | link |
| IEEE 3002.7-2018 | IEEE Recommended Practice for Conducting Motor-Starting Studies and Analysis of Industrial and Commercial Power Systems | 2018 (publication date listed 2019-04-26) | verified-web | 2026-11-09 | link |
| IEEE 3003.1-2019 | IEEE Recommended Practice for System Grounding of Industrial and Commercial Power Systems | 2019 | partial | 2026-11-09 | link |
| IEEE 3003.2-2014 | IEEE Recommended Practice for Equipment Grounding and Bonding in Industrial and Commercial Power Systems | 2014; revision PAR approved 2025-09-10 | partial | 2026-11-09 | link |
| IEEE 3006.5-2014 | IEEE Recommended Practice for the Use of Probability Methods for Conducting a Reliability Analysis of Industrial and Commercial Power Systems Equipment | 2014 believed | unverified | ||
| IEEE 81-2012 | IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System | 2012; one reseller lists Withdrawn | partial | 2026-11-09 | link |
| IEEE 485-2020 | IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications | 2020 (approved 2020-05-06) | verified-web | 2026-11-09 | link |
| IEEE 1204-1997 | IEEE Guide for Planning DC Links Terminating at AC Locations Having Low Short-Circuit Capacities | 1997; status not confirmed | unverified | ||
| IEEE 43 | IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery | 43-2013 believed; not confirmed | unverified | ||
| IEEE 400 series | IEEE Guide for Field Testing and Evaluation of the Insulation of Shielded Power Cable Systems | 400-2012 believed; sub-parts 400.1/.2/.3 vary | unverified | ||
| IEEE 315 | IEEE Standard Graphic Symbols for Electrical and Electronics Diagrams | 315-1975 (reaffirmed 1993); confirm status | unverified | ||
| IEEE 1547.4-2011 | IEEE Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems | 2011; Inactive-Reserved (inactivated 2022-03-24); successor P1547.4 in development | verified-web | 2026-11-09 | link |
| IEEE 802.1Q | IEEE Standard for Local and Metropolitan Area Networks - Bridges and Bridged Networks | 802.1Q-2022 believed; not confirmed | unverified | ||
| IEC 60038 | IEC Standard Voltages | Edition 7.1 (7.0 2009 + AMD1:2021 consolidated, 2021-12-15) | verified-web | 2026-11-09 | link |
| IEC 60050-192 | International Electrotechnical Vocabulary - Part 192: Dependability | Edition 1 (2015) believed | unverified | ||
| IEC 60228 | Conductors of Insulated Cables | Edition 4.0, 2023 (December) | partial | 2026-11-09 | link |
| IEC 60255-149:2013 | Measuring Relays and Protection Equipment - Part 149: Functional Requirements for Thermal Electrical Relays | 2013 | unverified | ||
| IEC 60255-151 | Measuring Relays and Protection Equipment - Part 151: Functional Requirements for Over/Under Current Protection | Edition 1.0 (2009) believed | unverified | ||
| IEC 60300-3-3 | Dependability Management - Part 3-3: Application Guide - Life Cycle Costing | 2004 believed; revision status unknown | unverified | ||
| IEC 60529 | Degrees of Protection Provided by Enclosures (IP Code) | Edition 2.2 (1989 + AMD1:1999 + AMD2:2013 consolidated); Cor. 2015 | verified-web | 2026-11-09 | link |
| IEC 60870-5-104 | Telecontrol Equipment and Systems - Part 5-104: Transmission Protocols - Network Access for IEC 60870-5-101 | Edition 2.0 (2006) believed; amendment status not confirmed | unverified | ||
| IEC 60904-3 | Photovoltaic Devices - Part 3: Measurement Principles for Terrestrial PV Solar Devices with Reference Spectral Irradiance Data | Edition 4 (2019) believed | unverified | ||
| IEC 60947-2 | Low-Voltage Switchgear and Controlgear - Part 2: Circuit-Breakers | Edition 5.1 (2016 + AMD1:2019) believed | unverified | ||
| IEC 61000-4-7 | Electromagnetic Compatibility - Part 4-7: General Guide on Harmonics and Interharmonics Measurements and Instrumentation | Edition 2.1 (2009; 2002 text with A1:2008 consolidated) | partial | 2026-11-09 | link |
| IEC 61000-4-15 | Electromagnetic Compatibility - Part 4-15: Flickermeter - Functional and Design Specifications | Edition 2.0 (2010-08-24); Cor. 2012 | verified-web | 2026-11-09 | link |
| IEC 61116 | Electromechanical Equipment - Guide for Small Hydroelectric Installations | 1992 believed; not confirmed | unverified | ||
| IEC 61131-3 | Programmable Controllers - Part 3: Programming Languages | Edition 3.0 (2013); several catalogs show Edition 4 (2025) replacing it | partial | 2026-11-09 | link |
| IEC 61215 series | Terrestrial Photovoltaic (PV) Modules - Design Qualification and Type Approval | 61215-1:2021 Edition 2 (NMOT test removed); -2:2021 | partial | 2026-11-09 | link |
| IEC 61400-2 | Wind Energy Generation Systems - Part 2: Small Wind Turbines | Edition 3 (2013) believed; later edition not confirmed | unverified | ||
| IEC 61508 series | Functional Safety of Electrical/Electronic/Programmable Electronic Safety-Related Systems | Edition 2.0 (2010) believed for Parts 1-7 | unverified | ||
| IEC 61557-8 | Electrical Safety in Low-Voltage Distribution Systems up to 1000 V AC and 1500 V DC - Part 8: Insulation Monitoring Devices for IT Systems | Edition 3 (2014) believed | unverified | ||
| IEC 61660-1 | Short-Circuit Currents in D.C. Auxiliary Installations in Power Plants and Substations - Part 1: Calculation of Short-Circuit Currents | Edition 1.0 (1997) | unverified | ||
| IEC 61683:1999 | Photovoltaic Systems - Power Conditioners - Procedure for Measuring Efficiency | Edition 1.0 (1999) | partial | 2026-11-09 | link |
| IEC 61730 series (and UL 61730) | Photovoltaic (PV) Module Safety Qualification | 61730-1:2023 Edition 3 (published 2023-09-12) | partial | 2026-11-09 | link |
| IEC 61853 series | Photovoltaic (PV) Module Performance Testing and Energy Rating | Part 1 2011; Part 2 2016 (believed); newer editions not confirmed | unverified | ||
| IEC 62006:2010 | Hydraulic Machines - Acceptance Tests of Small Hydroelectric Installations | Edition 1 (2010-10-28); Edition 2 in development | partial | 2026-11-09 | link |
| IEC 62109-2 | Safety of Power Converters for Use in Photovoltaic Power Systems - Part 2: Particular Requirements for Inverters | Edition 1.0 (2011-06-23); Edition 2 in development (prEN IEC 62109-2:2025) | verified-web | 2026-11-09 | link |
| IEC 62282-3-100 | Fuel Cell Technologies - Part 3-100: Stationary Fuel Cell Power Systems - Safety | Edition 2 (2019); Edition 3 in development | verified-web | 2026-11-09 | link |
| IEC 62351 series | Power Systems Management and Associated Information Exchange - Data and Communications Security | Per-part: 62351-3:2023 Ed. 2; 62351-6:2020 Ed. 1; others vary | partial | 2026-11-09 | link |
| IEC 62439 series | Industrial Communication Networks - High Availability Automation Networks | 62439-3:2021 Edition 4 (PRP/HSR; Cor. 2023); 62439-2 not confirmed | partial | 2026-11-09 | link |
| IEC 62541 series | OPC Unified Architecture | Multi-part; editions vary | unverified | ||
| IEC 62682 | Management of Alarms Systems for the Process Industries | Edition 2 (2022); 2014 edition superseded | partial | 2026-11-09 | link |
| IEC 62746-10-1:2018 | Systems Interface Between Customer Energy Management System and the Power Management System - Part 10-1: Open Automated Demand Response | Edition 1.0, 2018 (OpenADR 2.0b) | partial | 2026-11-09 | link |
| IEC 60028 | International Standard of Resistance for Copper | 1925 (believed withdrawn) | unverified | ||
| IEC 60269 | Low-Voltage Fuses | Series; editions vary by part | unverified | ||
| EN 50530:2010 (+A1:2013) | Overall Efficiency of Grid Connected Photovoltaic Inverters | EN 50530:2010 + A1:2013 | partial | 2026-11-09 | link |
| EN 50600 series | Information Technology - Data Centre Facilities and Infrastructures | Multi-part; editions vary | unverified | ||
| UL 248 (248-1 General Requirements) | Low-Voltage Fuses | UL 248-1 Ed. 4 (2022-10-24); 248-9 Ed. 3 (2025-12-10); 248-21 Ed. 1 (2025) | partial | 2026-11-09 | link |
| UL 67 | Panelboards | Edition not confirmed | unverified | ||
| UL 1008 | Transfer Switch Equipment | Ed. 9 (2022-07); ANSI store lists a 2026 revision (published 2026-08-25); 1008M (meter-mounted) 2024/2025 | partial | 2026-11-09 | link |
| UL 1066 | Power Circuit Breakers up to 1000 V AC and 1500 V DC Used in Enclosures | Ed. 5 (2022-08-08) | partial | 2026-11-09 | link |
| UL 3141 | Power Control Systems | Edition 2 (2024) per ANSI store; began as Outline of Investigation (2020) | partial | 2026-11-09 | link |
| UL 62109-2 | Safety of Power Converters for Use in Photovoltaic Power Systems - Part 2 | Edition not confirmed | unverified | ||
| NFPA 99 | Health Care Facilities Code | 2024 (effective/pub Aug 2023) | partial | 2026-11-09 | link |
| NFPA 30 | Flammable and Combustible Liquids Code | 2024 | partial | 2026-11-09 | link |
| NFPA 68 | Standard on Explosion Protection by Deflagration Venting | 2023 (Errata 68-23-1) | partial | 2026-11-09 | link |
| NFPA 69 | Standard on Explosion Prevention Systems | 2024 (published Dec 2023) | partial | 2026-11-09 | link |
| NFPA 853 | Standard for the Installation of Stationary Fuel Cell Power Systems | Edition not confirmed (2020 believed) | unverified | ||
| NFPA 2001 | Standard on Clean Agent Fire Extinguishing Systems | 2025 | partial | 2026-11-09 | link |
| NFPA 790 | Standard for Competency of Third-Party Field Evaluation Bodies | 2024 believed; not confirmed | unverified | ||
| NFPA 791 | Recommended Practice and Procedures for Unlabeled Electrical Equipment Evaluation | 2024 believed; not confirmed | unverified | ||
| ISO 3046-1:2002 | Reciprocating Internal Combustion Engines - Performance - Part 1: Declarations of Power, Fuel and Lubricating Oil Consumptions, and Test Methods | Edition 5 (2002); confirmed 2020; Edition 6 at DIS | verified-web | 2026-11-09 | link |
| ISO 8528-3:2020 | Reciprocating Internal Combustion Engine Driven Alternating Current Generating Sets - Part 3: Alternating Current Generators for Generating Sets | Edition 3 (2020-10); reconfirmed 2026 | verified-web | 2026-11-09 | link |
| ISO 14687:2019 | Hydrogen Fuel Quality - Product Specification | 2019 (consolidates former -1, -2, -3) | partial | 2026-11-09 | link |
| ISO 6469-1 | Electrically Propelled Road Vehicles - Safety Specifications - Part 1: Rechargeable Energy Storage System (RESS) | 2019 believed; not confirmed | unverified | ||
| ISO 9613-2:2024 | Acoustics - Attenuation of Sound During Propagation Outdoors - Part 2: Engineering Method for the Prediction of Sound Pressure Levels Outdoors | 2024 (replaced 1996) | verified-web | 2026-11-09 | link |
| ISO 2533:1975 | Standard Atmosphere | 1975 (Add 1 1985, Add 2 1997) | unverified | ||
| ISO 15118-20:2022 | Road Vehicles - Vehicle to Grid Communication Interface - Part 20: 2nd Generation Network and Application Layer Requirements | 2022 (published 2022-04-25); Amendment 1 (AC DER, MCS) in progress/2026 | verified-web | 2026-11-09 | link |
| ISO 11898 | Road Vehicles - Controller Area Network (CAN) | Multi-part; editions vary | unverified | ||
| SAE J537_202309 | Storage Batteries | J537_202309 (September 2023) | verified-web | 2026-11-09 | link |
| SAE J3271 | Megawatt Charging System (MCS) for Electric Vehicles | Edition not confirmed | unverified | ||
| SAE J3072_202406 | Interconnection Requirements for Onboard, Grid Support Inverter Systems | J3072_202406 (June 2024) | partial | 2026-11-09 | link |
| SAE J1939 | Serial Control and Communications Heavy Duty Vehicle Network | Multi-document series | unverified | ||
| ANSI/ASQ Z1.4 | Sampling Procedures and Tables for Inspection by Attributes | 2003 (R2018) believed | unverified | ||
| NEMA MG 1 (ANSI/NEMA MG 00001-2024) | Motors and Generators | ANSI/NEMA MG 00001-2024 (active); MG 1-2021 (published 2022-06-29) superseded 2025 | verified-web | 2026-11-09 | link |
| NEMA 250 | Enclosures for Electrical Equipment (1000 Volts Maximum) | 2020 believed; not confirmed | unverified | ||
| ASHRAE Guideline 14-2023 | Measurement of Energy, Demand, and Water Savings (retitled Measurement and Verification of Energy, Demand, and Water Savings by Addendum a, 2025-10-29) | 2023 (dated 2023-08-01; errata 2024-05-10; Addendum a 2025-10-29) | verified-web | 2026-11-09 | link |
| ASHRAE Handbook | ASHRAE Handbook (Fundamentals; HVAC Applications; etc.) | Four-volume cycle; cite volume and year | unverified | ||
| ASCE/SEI 7-22 | Minimum Design Loads and Associated Criteria for Buildings and Other Structures | 7-22 (current); ASCE 7-28 expected 2028 | partial | 2026-11-09 | link |
| AACE RP 18R-97 | Cost Estimate Classification System - As Applied in Engineering, Procurement, and Construction for the Process Industries | 18R-97 (revision date to confirm) | partial | 2026-11-09 | link |
| AACE RP 56R-08 | Cost Estimate Classification System - As Applied for the Building and General Construction Industries | 56R-08 | partial | 2026-11-09 | link |
| ICEA P-32-382 | Short-Circuit Characteristics of Insulated Cable | 2007 (R2018) | partial | 2026-11-09 | link |
| ASTM B258 | Standard Specification for Nominal Diameters and Cross-Sectional Areas of AWG Sizes of Solid Round Wires Used as Electrical Conductors | Edition not confirmed | unverified | ||
| ASTM B230/B230M | Standard Specification for Aluminum 1350-H19 Wire for Electrical Purposes | Edition not confirmed | unverified | ||
| ASTM D975 | Standard Specification for Diesel Fuel | Revised periodically; cite the dated revision | unverified | ||
| ASTM D6469 | Standard Guide for Microbial Contamination in Fuels and Fuel Systems | D6469-20 per ANSI store (-17 historical); later revision not checked | partial | 2026-11-09 | link |
| ASTM E917 | Standard Practice for Measuring Life-Cycle Costs of Buildings and Building Systems | E917-17 believed; not confirmed | unverified | ||
| JCGM 100:2008 (GUM) | Evaluation of Measurement Data - Guide to the Expression of Uncertainty in Measurement | 2008 (corrected 2010 version) | unverified | link | |
| ANSI/ISA-18.2-2016 | Management of Alarm Systems for the Process Industries | 2016 | partial | 2026-11-09 | link |
| EEMUA 191 | Alarm Systems - A Guide to Design, Management and Procurement | Edition 3 (2013) | partial | 2026-11-09 | link |
| NERC PRC-006 | Automatic Underfrequency Load Shedding | PRC-006-5 believed current (filed with FERC; WECC variance update in progress 2026) | partial | 2026-11-09 | link |
| FERC Order No. 2006 | Standardization of Small Generator Interconnection Agreements and Procedures | Issued 2005-05-12 | unverified | ||
| FERC Order No. 792 | Small Generator Interconnection Agreements and Procedures | Issued 2013-11-22 | unverified | ||
| FERC Order No. 755 | Frequency Regulation Compensation in the Organized Wholesale Power Markets | Issued 2011-10-20 | unverified | ||
| 49 CFR 173.185 | Lithium Cells and Batteries (DOT HMR) | Current CFR | partial | 2026-11-09 | link |
| UN Manual of Tests and Criteria, subsection 38.3 | UN Manual of Tests and Criteria - Part III, Subsection 38.3 (Lithium Batteries) | 8th revised edition (2023) per vendors; US 49 CFR 171.7 may still incorporate 7th rev. ed. (2019) + Amd 1 (2021) | partial | 2026-11-09 | link |
| OSHA 29 CFR 1910.147 | The Control of Hazardous Energy (Lockout/Tagout) | Final rule 1989-09-01 (54 FR 36644); current CFR | verified-web | 2026-11-09 | link |
| 10 CFR Part 431 (distribution transformers) | DOE Energy Conservation Standards - Commercial and Industrial Equipment (distribution transformers, Subpart K) | Current CFR | unverified | ||
| 18 CFR 292.205 | PURPA Criteria for Qualifying Cogeneration Facilities | Current CFR | unverified | ||
| UN ECE Regulation No. 100 | Uniform Provisions Concerning Approval of Vehicles with Regard to Specific Requirements for the Electric Power Train | Revision not confirmed | unverified | ||
| ANSI/ACP 101-1 | Small Wind Turbine Performance and Safety Standard (successor to AWEA 9.1) | Edition not confirmed | unverified | ||
| ANSI/CSA FC 1 | Stationary Fuel Cell Power Systems | Edition not confirmed (US adoption of IEC 62282-3-100) | unverified | ||
| IRIG Standard 200 | IRIG Serial Time Code Formats | Edition not confirmed (200-04 / 200-16 believed) | unverified | ||
| OpenADR 3.0 | OpenADR 3.0 Specification | 3.0.x (Alliance spec; not an IEC part per search) | unverified | link |
Public sources for the emerging-technology cards (15)
Company claims are listed as claims. Where a link came from a search result and was not opened in full, the note says so.
| Key | Publisher | Title | Year | Cards | Link | Note |
|---|---|---|---|---|---|---|
| S1 | Sargent & Lundy | Battery energy storage systems independent engineering due diligence | 2026 | B-15 | link | |
| S3 | U.S. Department of Energy | Lithium-ion BESS Technical Specifications | 2025 | B-15 | link | |
| S4 | Energy-Storage.news | BloombergNEF launches Tier 1 list (criteria as reported) | 2024 | B-15 | link | link taken from a search result; open it to confirm before citing |
| S6 | ESS News | What insurers want battery developers to understand right now (underwriter interview) | 2025 | B-15 | link | |
| S9 | PubMed Central | Prussian blue data review | B-16 | link | link taken from a search result; open it to confirm before citing | |
| S11 | Microstructures | Layered cathode review | 2024 | B-16 | link | link taken from a search result; open it to confirm before citing |
| S13 | MDPI Batteries | Electrode thermal runaway | B-16 | link | ||
| S14 | Sandia National Labs | Sodium-ion safety | 2026 | B-16 | link | |
| S15 | RSC | Cell thermal runaway | 2025 | B-16 | link | |
| S19 | RSC | NaCrO2 high-rate cathode | B-16 | link | ||
| S20 | Electrochem. Soc. | NaCrO2 safety abstract | 2013 | B-16 | link | link taken from a search result; open it to confirm before citing |
| S25 | CSIR | NFPP cell test | B-16 | link | ||
| S36 | UNIDO ITPO Tokyo | NAS sodium-sulfur battery technology entry | 2018 | B-17 | link | link taken from a search result; open it to confirm before citing |
| S37 | Energy-Storage.news | Long duration energy storage to scale in second half of 2030s, says DNV (as reported) | B-17 | link | ||
| S38 | Lawrence Berkeley National Laboratory | Land Requirements for Utility-Scale PV: An Empirical Update on Power and Energy Density | 2022 | S-02 | link |
Handbook bibliography (176)
| Key | Author or organization | Year | Title | Publisher | Link |
|---|---|---|---|---|---|
| Adibi 2000 | Adibi, M. M., ed. | 2000 | Power System Restoration: Methodologies and Implementation Strategies | IEEE Press / Wiley. | |
| Sandia 2015 | Sandia SAND2015-1002 | Akhil, A. A., et al. | 2015 | DOE/EPRI Electricity Storage Handbook in Collaboration with NRECA | Sandia National Laboratories, SAND2015-1002. | |
| Ammerman et al. 2010 | Ammerman, R. F., Gammon, T., Sen, P. K., and Nelson, J. P. | 2010 | DC-arc models and incident-energy calculations | IEEE Transactions on Industry Applications, 46(5). | |
| P.L. 119-21 | An Act to provide for reconciliation pursuant to title II of H. Con. Res. 14, Public Law 119-21 | 2025 | |||
| Anders 1997 | Anders, G. J. | 1997 | Rating of Electric Power Cables: Ampacity Computations for Transmission, Distribution, and Industrial Applications | IEEE Press / McGraw-Hill. | |
| Anderson 1995 | Anderson, P. M. | 1995 | Analysis of Faulted Power Systems | IEEE Press. | |
| Anderson & Mirheydar 1990 | Anderson, P. M., and Mirheydar, M. | 1990 | A low-order system frequency response model | IEEE Transactions on Power Systems, 5(3). | |
| ANL GREET | Argonne National Laboratory | GREET Model: Fuel Specifications (lower and higher heating values and densities of fuels) | U.S. Department of Energy. | ||
| ASHRAE Handbook—Fundamentals | ASHRAE | ASHRAE Handbook—Fundamentals | Edition per project. | ||
| Barley & Winn 1996 | Barley, C. D., and Winn, C. B. | 1996 | Optimal Dispatch Strategy in Remote Hybrid Power Systems | Optimal dispatch strategy in remote hybrid power systems | Solar Energy 58(4–6). | |
| Barlow & Proschan 1965 | Barlow, R. E., and Proschan, F. | 1965 | Mathematical Theory of Reliability | Wiley. | |
| Bernardi et al. 1985 | Bernardi, D., Pawlikowski, E., Newman, J. | 1985 | A General Energy Balance for Battery Systems | Journal of The Electrochemical Society, 132(1). | |
| Bidram & Davoudi 2012 | Bidram, A., and Davoudi, A. | 2012 | Hierarchical structure of microgrids control system | IEEE Transactions on Smart Grid, 3(4), 1963–1976. | |
| Billinton & Allan 1992 | Billinton, R., and Allan, R. N. | 1992 | Reliability Evaluation of Engineering Systems: Concepts and Techniques | 2nd ed. Plenum Press. | |
| Billinton & Allan 1996 | Billinton, R., and Allan, R. N. | 1996 | Reliability Evaluation of Power Systems | 2nd ed. Plenum Press. | |
| Blackburn & Domin 2014 | Blackburn, J. L., and Domin, T. J. | 2014 | Protective Relaying: Principles and Applications | 4th ed. CRC Press. | |
| Bolinger & Bolinger 2022 | Bolinger, M., Bolinger, G. | 2022 | Land Requirements for Utility-Scale PV: An Empirical Update on Power and Energy Density | IEEE Journal of Photovoltaics 12(2). | |
| Bollen 2000 | Bollen, M. H. J. | 2000 | Understanding Power Quality Problems: Voltage Sags and Interruptions | IEEE Press / Wiley. | |
| Sandia 2004 | Bower, W., Whitaker, C., Erdman, W., Behnke, M., & Fitzgerald, M. | 2004 | Performance Test Protocol for Evaluating Inverters Used in Grid-Connected Photovoltaic Systems | Sandia National Laboratories, BEW Engineering, Endecon Engineering. | |
| Braun 2003 | Braun, J.E. | 2003 | Load Control Using Building Thermal Mass | ASME Journal of Solar Energy Engineering, 125(3). | |
| Brealey et al. 2020 | Brealey, R. A., Myers, S. C., and Allen, F. | 2020 | Principles of Corporate Finance | 13th ed. McGraw-Hill Education. | |
| BIPM 2019 | Bureau International des Poids et Mesures | 2019 | The International System of Units (SI) | 9th edition (SI Brochure). | |
| Burton et al. 2011 | Burton, T., Jenkins, N., Sharpe, D., Bossanyi, E. | 2011 | Wind Energy Handbook | 2nd ed. Wiley. | |
| CA Rule 21 | Rule 21 | California Public Utilities Commission and investor-owned utilities | Electric Rule 21, Generating Facility Interconnections | Continuously amended tariff. | ||
| NREL 2012 | Coddington, M., et al. | 2012 | Updating Interconnection Screens for PV System Integration | National Renewable Energy Laboratory technical report. | |
| Cole & Ramasamy 2023 | Cole, W., and Ramasamy, V. | 2023 | Cost Projections for Utility-Scale Battery Storage: 2023 Update | National Renewable Energy Laboratory. | |
| PNNL & Sandia 2016 | Conover, D.R., et al. | 2016 | Protocol for Uniformly Measuring and Expressing the Performance of Energy Storage Systems | Pacific Northwest National Laboratory and Sandia National Laboratories, PNNL-22010 Rev. 2. | |
| Coughlin et al. 2008 | Coughlin, K., Piette, M.A., Goldman, C., Kiliccote, S. | 2008 | Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California | Lawrence Berkeley National Laboratory. | |
| Cummins T-030 | Cummins Power Generation | T-030 Application Manual: Liquid Cooled Generator Sets | |||
| Cutler et al. 2017 | Cutler, D., Olis, D., Elgqvist, E., Li, X., Laws, N., DiOrio, N., Walker, A., and Anderson, K. | 2017 | REopt: A Platform for Energy System Integration and Optimization | National Renewable Energy Laboratory, NREL/TP-7A40-70022. | |
| D'Arco & Suul 2014 | D'Arco, S., and Suul, J. A. | 2014 | Equivalence of virtual synchronous machines and frequency-droops for converter-based microgrids | IEEE Transactions on Smart Grid, 5(1). | |
| NREL 2017 | Denholm, P., Eichman, J., Margolis, R. | 2017 | Evaluating the Technical and Economic Performance of PV Plus Storage Power Plants | National Renewable Energy Laboratory. | |
| Dierauf et al. 2013 | Dierauf, T., Growitz, A., Kurtz, S., Becerra Cruz, J.L., Riley, E., Hansen, C. | 2013 | Weather-Corrected Performance Ratio | National Renewable Energy Laboratory, NREL/TP-5200-57991. | |
| DNV GL 2020 | DNV GL | 2020 | McMicken Battery Energy Storage System Event Technical Analysis and Recommendations | Report for Arizona Public Service. | |
| Doan 2010 | Doan, D. R. | 2010 | Arc flash calculations for exposures to DC systems | IEEE Transactions on Industry Applications, 46(6). | |
| Dobos 2014 | Dobos, A.P. | 2014 | PVWatts Version 5 Manual | NREL Technical Report NREL/TP-6A20-62641. | |
| Driesse et al. 2008 | Driesse, A., Jain, P., & Harrison, S. | 2008 | Beyond the curves: modeling the electrical efficiency of photovoltaic inverters | Proceedings of the 33rd IEEE Photovoltaic Specialists Conference. | |
| Duffie & Beckman 2013 | Duffie, J.A., Beckman, W.A. | 2013 | Solar Engineering of Thermal Processes | 4th ed. Wiley. | |
| Dugan et al. 2012 | Dugan, R. C., McGranaghan, M. F., Santoso, S., and Beaty, H. W. | 2012 | Electrical Power Systems Quality | 3rd ed. McGraw-Hill. | |
| Dwight 1936 | Dwight, H. B. | 1936 | Calculation of Resistances to Ground | Electrical Engineering (AIEE), vol. 55. | |
| Eddy et al. 2017 | Eddy, J., Miner, N. E., and Stamp, J. | 2017 | Sandia's Microgrid Design Toolkit | The Electricity Journal 30(4). | |
| EVO 2022 | Efficiency Valuation Organization | 2022 | International Performance Measurement and Verification Protocol (IPMVP): Core Concepts | EVO. | |
| EPRI 2021 | EPRI | 2021 | Common File Format for Distributed Energy Resources Settings Exchange and Storage | Electric Power Research Institute. | |
| EPRI 2024 | EPRI | 2024 | Insights from EPRI's Battery Energy Storage Systems (BESS) Failure Incident Database: Analysis of Failure Root Cause | ||
| ESHA 2004 | European Small Hydropower Association | 2004 | Guide on How to Develop a Small Hydropower Plant | ESHA. | |
| Faiman 2008 | Faiman, D. | 2008 | Assessing the Outdoor Operating Temperature of Photovoltaic Modules | Progress in Photovoltaics 16(4). | |
| FERC Order 2006 | Federal Energy Regulatory Commission | 2005 | Standardization of Small Generator Interconnection Agreements and Procedures | Order No. 2006. | |
| FERC Order 755 | Federal Energy Regulatory Commission | 2011 | Frequency Regulation Compensation in the Organized Wholesale Power Markets | Order No. 755. | |
| FERC Order 792 | Federal Energy Regulatory Commission | 2013 | Small Generator Interconnection Agreements and Procedures | Order No. 792. | |
| FERC Order 841 | Federal Energy Regulatory Commission | 2018 | Electric Storage Participation in Markets Operated by Regional Transmission Organizations and Independent System Operators | Order No. 841. | |
| FERC Order 2222 | FERC Order No. 2222 | Federal Energy Regulatory Commission | 2020 | Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators | Order No. 2222. | |
| Feng et al. 2018 | Feng, X., Ouyang, M., Liu, X., Lu, L., Xia, Y., He, X. | 2018 | Thermal Runaway Mechanism of Lithium Ion Battery for Electric Vehicles: A Review | Energy Storage Materials 10. | |
| Fisher 1930 | Fisher, I. | 1930 | The Theory of Interest | Macmillan. | |
| RMI 2015 | Fitzgerald, G., Mandel, J., Morris, J., Touati, H. | 2015 | The Economics of Battery Energy Storage: How Multi-Use, Customer-Sited Batteries Deliver the Most Services and Value to Customers and the Grid | Rocky Mountain Institute. | |
| NIST HB 135 | NIST Handbook 135 | Fuller, S. K., and Petersen, S. R. | 1996 | Life-Cycle Costing Manual for the Federal Energy Management Program | NIST Handbook 135, National Institute of Standards and Technology. | |
| Giraldez et al. 2018 | Giraldez, J., et al. | 2018 | Phase I Microgrid Cost Study: Data Collection and Analysis of Microgrid Costs in the United States | National Renewable Energy Laboratory. | |
| Glover et al. 2017 | Glover, J. D., Overbye, T. J., & Sarma, M. S. | 2017 | Power System Analysis and Design | 6th ed. Cengage Learning. | |
| Grainger & Stevenson 1994 | Grainger, J. J., & Stevenson, W. D. | 1994 | Power System Analysis | McGraw-Hill. | |
| Guerrero et al. 2011 | Guerrero, J. M., Vasquez, J. C., Matas, J., de Vicuña, L. G., and Castilla, M. | 2011 | Hierarchical control of droop-controlled AC and DC microgrids: a general approach toward standardization | IEEE Transactions on Industrial Electronics, 58(1), 158–172. | |
| Gönen 2014 | Gönen, T. | 2014 | Electric Power Distribution Engineering | 3rd ed. CRC Press. | |
| Harlow 2012 | Harlow, J. H., ed. | 2012 | Electric Power Transformer Engineering | 3rd ed. CRC Press. | |
| Rule 14H | Hawaiian Electric | Rule 14H, Interconnection of Distributed Generating Facilities | current tariff. | ||
| Hong & Fan 2016 | Hong, T., and Fan, S. | 2016 | Probabilistic electric load forecasting: A tutorial review | International Journal of Forecasting 32(3). | |
| Hunter & Elliot 1994 | Hunter, R., and Elliot, G. (eds.) | 1994 | Wind-Diesel Systems: A Guide to the Technology and Its Implementation | Cambridge University Press. | |
| Hyndman & Athanasopoulos 2021 | Hyndman, R. J., and Athanasopoulos, G. | 2021 | Forecasting: Principles and Practice | 3rd ed. OTexts. | |
| IEA PVPS 2002 | IEA PVPS Task 5 | 2002 | Evaluation of Islanding Detection Methods for Photovoltaic Utility-Interactive Power Systems | Report IEA-PVPS T5-09:2002. | |
| Ihara & Schweppe 1981 | Ihara, S., and Schweppe, F. C. | 1981 | "Physically Based Modeling of Cold Load Pickup." | IEEE Transactions on Power Apparatus and Systems, PAS-100(9). | |
| Incropera et al. 2007 | Incropera, F.P., DeWitt, D.P., Bergman, T.L. and Lavine, A.S. | 2007 | Fundamentals of Heat and Mass Transfer | 6th ed. Wiley. | |
| P.L. 117-169 | Inflation Reduction Act of 2022, Public Law 117-169 | 2022 | |||
| ITI 2000 | ITIC 2000 | Information Technology Industry Council | 2000 | ITI (CBEMA) Curve Application Note | ||
| IRS Pub 946 | Internal Revenue Service (annual) | Publication 946, How to Depreciate Property | U.S. Department of the Treasury. | ||
| IATA DGR | International Air Transport Association | Dangerous Goods Regulations | current annual edition, Packing Instructions 965–967. | ||
| IREC 2017 | Interstate Renewable Energy Council | 2017 | Key Decisions for Hosting Capacity Analyses | ||
| JCGM 100:2008 | Joint Committee for Guides in Metrology | 2008 | Evaluation of Measurement Data — Guide to the Expression of Uncertainty in Measurement | JCGM 100:2008. | |
| Jordan et al. 2022 | Jordan, D.C., et al. | 2022 | Photovoltaic Fleet Degradation Insights | Progress in Photovoltaics 30. | |
| Jordan & Kurtz 2013 | Jordan, D.C., Kurtz, S.R. | 2013 | Photovoltaic Degradation Rates—An Analytical Review | Progress in Photovoltaics 21(1). | |
| Jülch 2016 | Jülch, V. | 2016 | Comparison of electricity storage options using levelized cost of storage (LCOS) method | Applied Energy, 183, 1594–1606. | |
| Kersting 2017 | Kersting, W. H. | 2017 | Distribution System Modeling and Analysis | 4th ed. CRC Press. | |
| Sandia 2007 | King, D. L., Gonzalez, S., Galbraith, G. M., & Boyson, W. E. | 2007 | Performance Model for Grid-Connected Photovoltaic Inverters | Sandia National Laboratories. | |
| King et al. 2004 | King, D.L., Boyson, W.E., Kratochvil, J.A. | 2004 | Photovoltaic Array Performance Model | Sandia National Laboratories, SAND2004-3535. | |
| Kundur 1994 | Kundur, P. | 1994 | Power System Stability and Control | McGraw-Hill. | |
| Lambert et al. 2006 | Lambert, T., Gilman, P., and Lilienthal, P. | 2006 | Micropower System Modeling with HOMER | Micropower system modeling with HOMER | Integration of Alternative Sources of Energy. Wiley-IEEE Press. | |
| Larminie & Dicks 2003 | Larminie, J. and Dicks, A. | 2003 | Fuel Cell Systems Explained | 2nd ed. Wiley. | |
| Lazard 2024 | Lazard | 2024 | Levelized Cost of Energy+ | June 2024. | |
| Mai et al. 2018 | Mai, T., et al. | 2018 | Electrification Futures Study: Scenarios of Electric Technology Adoption and Power Consumption for the United States | NREL, NREL/TP-6A20-71500. | |
| Manwell et al. 2009 | Manwell, J. F., McGowan, J. G., Rogers, A. L. | 2009 | Wind Energy Explained: Theory, Design and Application | 2nd ed. Wiley. | |
| Marcos et al. 2011 | Marcos, J., Marroyo, L., Lorenzo, E., Alvira, D., and Izco, E. | 2011 | Power Output Fluctuations in Large Scale PV Plants: One Year Observations with One Second Resolution and a Derived Analytic Model | Progress in Photovoltaics. | |
| Marion et al. 2005 | Marion, B., Adelstein, J., Boyle, K., et al. | 2005 | Performance Parameters for Grid-Connected PV Systems | NREL conference paper, 31st IEEE Photovoltaic Specialists Conference. | |
| Marqusee & Jenket 2020 | Marqusee, J., and Jenket, D. | 2020 | Reliability of Emergency and Standby Diesel Generators: Impact on Energy Resiliency Solutions | Applied Energy 268. | |
| NREL 2017 | McLaren, J., Gagnon, P., Anderson, K., Elgqvist, E., Fu, R., Remo, T. | 2017 | Identifying Potential Markets for Behind-the-Meter Battery Energy Storage: A Survey of U.S. Demand Charges | National Renewable Energy Laboratory. | |
| Mills & Wiser 2010 | Mills, A., and Wiser, R. | 2010 | Implications of Wide-Area Geographic Diversity for Short-Term Variability of Solar Power | Lawrence Berkeley National Laboratory. | |
| IETF 2010 | Mills, D., Martin, J., Burbank, J., and Kasch, W. | 2010 | Network Time Protocol Version 4: Protocol and Algorithms Specification | IETF RFC 5905. | |
| Modbus 2006 | Modbus Organization | 2006 | MODBUS over Serial Line Specification and Implementation Guide | V1.02. | |
| Modbus 2012 | Modbus Organization | 2012 | MODBUS Application Protocol Specification | V1.1b3. | |
| Mohan et al. 2003 | Mohan, N., Undeland, T. M., & Robbins, W. P. | 2003 | Power Electronics: Converters, Applications, and Design | 3rd ed. Wiley. | |
| PNNL 2020 | Mongird, K., et al. | 2020 | 2020 Grid Energy Storage Technology Cost and Performance Assessment | Pacific Northwest National Laboratory, for U.S. DOE. | |
| Moubray 1997 | Moubray, J. | 1997 | Reliability-Centered Maintenance | 2nd ed. Industrial Press. | |
| NIST WebBook | National Institute of Standards and Technology | NIST Chemistry WebBook | NIST Standard Reference Database 69. | ||
| NLR URDB | National Laboratory of the Rockies (NLR, formerly NREL) (continuously updated) | Utility Rate Database | OpenEI. | ||
| NREL ATB 2024 | National Renewable Energy Laboratory | 2024 | Annual Technology Baseline | NREL. | |
| NREL ATB 2024 | National Renewable Energy Laboratory | 2024 | Annual Technology Baseline: Utility-Scale Battery Storage | NREL. | |
| Naumann et al. 2018 | Naumann, M., Schimpe, M., Keil, P., Hesse, H.C., Jossen, A. | 2018 | Analysis and Modeling of Calendar Aging of a Commercial LiFePO4/Graphite Cell | Journal of Energy Storage, 17. | |
| Naumann et al. 2020 | Naumann, M., Spingler, F.B., Jossen, A. | 2020 | Analysis and Modeling of Cycle Aging of a Commercial LiFePO4/Graphite Cell | Journal of Power Sources, 451. | |
| Neher & McGrath 1957 | Neher, J. H., McGrath, M. H. | 1957 | The calculation of the temperature rise and load capability of cable systems | AIEE Transactions, Part III: Power Apparatus and Systems, 76. | |
| NERC 2017 | NERC | 2017 | Integrating Inverter-Based Resources into Low Short Circuit Strength Systems | Reliability Guideline. | |
| NERC 2018 | NERC | 2018 | Short-Circuit Modeling and System Strength | White paper. | |
| NERC 2019 | NERC | 2019 | Reliability Guideline: Primary Frequency Control | ||
| NERC 2023 | NERC | 2023 | Grid Forming Functional Specifications for BPS-Connected Battery Energy Storage Systems | White Paper. | |
| NY SIR | New York PSC | Standardized Interconnection Requirements and Application Process | current version. | ||
| NY SIR | New York State Public Service Commission | Standardized Interconnection Requirements and Application Process for New Distributed Generators | Amended periodically. | ||
| NIST 2014 | NIST | 2014 | Guidelines for Smart Grid Cybersecurity | NIST IR 7628 Rev. 1. | |
| NIST 2024 | NIST | 2024 | The NIST Cybersecurity Framework (CSF) 2.0 | NIST CSWP 29. | |
| CODATA 2022 | NIST Physical Measurement Laboratory | 2024 | CODATA Internationally Recommended 2022 Values of the Fundamental Physical Constants | NIST Reference on Constants, Units, and Uncertainty. | |
| U.S. Standard Atmosphere 1976 | USSA 1976 | NOAA, NASA and U.S. Air Force | 1976 | U.S. Standard Atmosphere, 1976 | U.S. Government Printing Office. | |
| Ogata 2010 | Ogata, K. | 2010 | Modern Control Engineering | 5th ed. Prentice Hall. | |
| Olivares et al. 2014 | Olivares, D. E., Mehrizi-Sani, A., Etemadi, A. H., Cañizares, C. A., Iravani, R., Kazerani, M., et al. | 2014 | Trends in microgrid control | IEEE Transactions on Smart Grid, 5(4), 1905–1919. | |
| Ong et al. 2013 | Ong, S., Campbell, C., Denholm, P., Margolis, R., Heath, G. | 2013 | Land-Use Requirements for Solar Power Plants in the United States | NREL Technical Report NREL/TP-6A20-56290. | |
| OSHA 29 CFR 1910.269 | OSHA | Electric Power Generation, Transmission, and Distribution | |||
| OSHA 29 CFR 1910 Subpart S | OSHA | Electrical | |||
| OSHA 29 CFR 1910.147 | OSHA | The Control of Hazardous Energy (Lockout/Tagout) | |||
| PNNL 2023 | Pacific Northwest National Laboratory for U.S. DOE | 2023 | Distributed Wind Market Report: 2023 Edition | U.S. Department of Energy. | |
| Paish 2002 | Paish, O. | 2002 | Small hydro power: technology and current status | Renewable and Sustainable Energy Reviews 6(6), 537–556. | |
| Plett 2015 | Plett, G. L. | 2015 | Battery Management Systems, Volume I: Battery Modeling | Artech House. | |
| Preger et al. 2020 | Preger, Y., et al. | 2020 | Degradation of Commercial Lithium-Ion Cells as a Function of Chemistry and Cycling Conditions | Journal of The Electrochemical Society, 167. Sandia National Laboratories. | |
| Ramasamy et al. 2023 | Ramasamy, V., et al. | 2023 | U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks, With Minimum Sustainable Price Analysis: Q1 2023 | National Renewable Energy Laboratory. | |
| Rawlings et al. 2017 | Rawlings, J. B., Mayne, D. Q., and Diehl, M. M. | 2017 | Model Predictive Control: Theory, Computation, and Design | 2nd ed. Nob Hill Publishing. | |
| Linden's Handbook 2011 | Reddy 2011 | Reddy, T. B., ed. | 2011 | Linden's Handbook of Batteries | 4th ed. McGraw-Hill. | |
| Rocabert et al. 2012 | Rocabert, J., Luna, A., Blaabjerg, F., and Rodríguez, P. | 2012 | Control of power converters in AC microgrids | IEEE Transactions on Power Electronics, 27(11). | |
| Schmalstieg et al. 2014 | Schmalstieg, J., Käbitz, S., Ecker, M., Sauer, D.U. | 2014 | A Holistic Aging Model for Li(NiMnCo)O2 Based 18650 Lithium-Ion Batteries | Journal of Power Sources, 257. | |
| Schmidt et al. 2019 | Schmidt, O., Melchior, S., Hawkes, A., and Staffell, I. | 2019 | Projecting the future levelized cost of electricity storage technologies | Joule, 3(1), 81–100. | |
| Sengupta et al. 2018 | Sengupta, M., Xie, Y., Lopez, A., Habte, A., Maclaurin, G., and Shelby, J. | 2018 | The National Solar Radiation Data Base (NSRDB) | Renewable and Sustainable Energy Reviews 89. | |
| Short et al. 1995 | Short, W., Packey, D. J., and Holt, T. | 1995 | A Manual for the Economic Evaluation of Energy Efficiency and Renewable Energy Technologies | National Renewable Energy Laboratory, NREL/TP-462-5173. | |
| Skogestad & Postlethwaite 2005 | Skogestad, S., and Postlethwaite, I. | 2005 | Multivariable Feedback Control: Analysis and Design | 2nd ed. Wiley. | |
| Smith et al. 2017 | Smith, K., Saxon, A., Keyser, M., Lundstrom, B., Cao, Z., Roc, A. | 2017 | Life Prediction Model for Grid-Connected Li-Ion Battery Energy Storage System | American Control Conference; National Renewable Energy Laboratory. | |
| NIST 2023 | Stouffer, K., et al. | 2023 | Guide to Operational Technology (OT) Security | NIST SP 800-82 Rev. 3. | |
| Sullivan et al. 2015 | Sullivan, M. J., Schellenberg, J., and Blundell, M. | 2015 | Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States | Lawrence Berkeley National Laboratory, LBNL-6941E. | |
| SunSpec | SunSpec Alliance | SunSpec Information Model Specification | and *SunSpec Modbus* model definitions, current release. | ||
| SunSpec | SunSpec Alliance | SunSpec Modbus | information models and *Common Smart Inverter Profile* conformance program, current release. | ||
| Teodorescu et al. 2011 | Teodorescu, R., Liserre, M., & Rodríguez, P. | 2011 | Grid Converters for Photovoltaic and Wind Power Systems | Wiley-IEEE Press. | |
| NIST 2008 | NIST SP 811-2008 | Thompson, A. and Taylor, B. N., NIST | 2008 | Guide for the Use of the International System of Units (SI) | NIST Special Publication 811. | |
| Ton & Smith 2012 | Ton, D. T. and Smith, M. A. | 2012 | The U.S. Department of Energy's Microgrid Initiative | The Electricity Journal, 25(8). | |
| 18 CFR 292.205 | U.S | Code of Federal Regulations, Title 18, §292.205 | Criteria for qualifying cogeneration facilities. | ||
| DOE 10 CFR 431 | U.S | Department of Energy | Energy Conservation Program for Certain Commercial and Industrial Equipment, 10 CFR Part 431, Subpart K (Distribution Transformers). | ||
| 49 CFR 173.185 | U.S | Department of Transportation, Pipeline and Hazardous Materials Safety Administration | Code of Federal Regulations, Title 49, §173.185 — Lithium cells and batteries. Revision in force to confirm. | ||
| EIA MER | EIA-861 | U.S | Energy Information Administration | Monthly Energy Review, Appendix A: Thermal Conversion Factors. U.S. Department of Energy. | ||
| 40 CFR 60 IIII | U.S | EPA | Standards of Performance for Stationary Compression Ignition Internal Combustion Engines. 40 CFR Part 60 Subpart IIII, current CFR. | ||
| 40 CFR 60 JJJJ | U.S | EPA | Standards of Performance for Stationary Spark Ignition Internal Combustion Engines. 40 CFR Part 60 Subpart JJJJ, current CFR. | ||
| 40 CFR 63 ZZZZ | U.S | EPA | National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines. 40 CFR Part 63 Subpart ZZZZ, current CFR. | ||
| 40 CFR Part 60 Subpart IIII | U.S | EPA | Standards of Performance for Stationary Compression Ignition Internal Combustion Engines. Code of Federal Regulations, current. | ||
| 40 CFR Part 60 Subpart JJJJ | U.S | EPA | Standards of Performance for Stationary Spark Ignition Internal Combustion Engines. Code of Federal Regulations, current. | ||
| 40 CFR Part 63 Subpart ZZZZ | U.S | EPA | National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines. Code of Federal Regulations, current. | ||
| OSHA 29 CFR 1910 Subpart S | OSHA 29 CFR 1910.147 | OSHA 29 CFR 1910.269 | U.S | Occupational Safety and Health Administration | Electric Power Generation, Transmission, and Distribution, current CFR. | ||
| DOE 2022 | U.S. Department of Energy | 2022 | Electric Grid Supply Chain Review: Large Power Transformers and High Voltage Direct Current Systems | DOE supply chain deep-dive assessment. | |
| DOE HFTO 2022 | U.S. Department of Energy, Hydrogen and Fuel Cell Technologies Office | 2022 | Technical Targets for Proton Exchange Membrane Electrolysis | ||
| EIA 2022 | U.S. Energy Information Administration | 2022 | Commercial Buildings Energy Consumption Survey (CBECS) 2018: Consumption and Expenditures | EIA. | |
| EIA 2024 | U.S. Energy Information Administration | 2024 | Capital Cost and Performance Characteristics for Utility-Scale Electric Power Generating Technologies | ||
| EPA CHP 2017 | U.S. EPA Combined Heat and Power Partnership | 2017 | Catalog of CHP Technologies | ||
| NUREG/CR-6928 | U.S. Nuclear Regulatory Commission | 2007 | Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants | ||
| UNIFI 2022 | UNIFI Consortium | 2022 | UNIFI Specifications for Grid-Forming Inverter-Based Resources | Version 1. | |
| IRA 2022 | United States Congress | 2022 | Inflation Reduction Act of 2022 | Public Law 117-169. | |
| PL 119-21 | United States Congress | 2025 | An Act to provide for reconciliation pursuant to title II of H. Con. Res. 14 | Public Law 119-21. | |
| Uptime Institute | Uptime Institute | Tier Standard: Topology | Current edition. | ||
| PNNL 2022 | Viswanathan, V., et al. | 2022 | 2022 Grid Energy Storage Technology Cost and Performance Assessment | Pacific Northwest National Laboratory, Energy Storage Grand Challenge. | |
| Waldmann et al. 2014 | Waldmann, T., Wilka, M., Kasper, M., Fleischhammer, M., Wohlfahrt-Mehrens, M. | 2014 | Temperature Dependent Ageing Mechanisms in Lithium-Ion Batteries — A Post-Mortem Study | Journal of Power Sources, 262. | |
| Wilcox & Marion 2008 | Wilcox, S., and Marion, W. | 2008 | Users Manual for TMY3 Data Sets | National Renewable Energy Laboratory, NREL/TP-581-43156. | |
| Willis 2004 | Willis, H. L. | 2004 | Power Distribution Planning Reference Book | 2nd ed. Marcel Dekker. | |
| NREL 2021 | Wilson, E., et al. | 2021 | End-Use Load Profiles for the U.S. Building Stock: Methodology and Results of Model Calibration, Validation, and Uncertainty Quantification | National Renewable Energy Laboratory. | |
| Wood et al. 2014 | Wood, A. J., Wollenberg, B. F., and Sheblé, G. B. | 2014 | Power Generation, Operation, and Control | 3rd ed. Wiley. | |
| NREL 2023 | Wood, E., et al. | 2023 | The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure | National Renewable Energy Laboratory. | |
| Woodward 2004 | Woodward | 2004 | Speed Droop and Power Generation | Application Note 01302. | |
| Xu et al. 2018 | Xu, B., Oudalov, A., Ulbig, A., Andersson, G., Kirschen, D.S. | 2018 | Modeling of Lithium-Ion Battery Degradation for Cell Life Assessment | IEEE Transactions on Smart Grid, 9(2). | |
| Xu et al. 2018 | Xu, B., Zhao, J., Zheng, T., Litvinov, E., and Kirschen, D. S. | 2018 | Factoring the Cycle Aging Cost of Batteries Participating in Electricity Markets | IEEE Transactions on Power Systems 33(2). | |
| Xu et al. 2004 | Xu, P., Haves, P., Piette, M.A., Braun, J. | 2004 | Peak Demand Reduction from Pre-Cooling with Zone Temperature Reset in an Office Building | Lawrence Berkeley National Laboratory. | |
| Yazdani & Iravani 2010 | Yazdani, A., & Iravani, R. | 2010 | Voltage-Sourced Converters in Power Systems: Modeling, Control, and Applications | Wiley-IEEE Press. | |
| Ye et al. 2004 | Ye, Z., Kolwalkar, A., Zhang, Y., Du, P., and Walling, R. | 2004 | Evaluation of anti-islanding schemes based on nondetection zone concept | IEEE Transactions on Power Electronics, 19(5). | |
| Yescombe 2014 | Yescombe, E. R. | 2014 | Principles of Project Finance | 2nd ed. Academic Press. |
Card index (107)
| Card | Question | Handbook entries | Bibliography keys | Standard IDs | Public source keys |
|---|---|---|---|---|---|
| L-01 | What do I need from the customer to size a system? | ROT-LOAD-03;LOAD-001;LOAD-021;LOAD-022;LOAD-023;ROT-LOAD-06;SYS-001;ROT-SYS-09 | Willis 2004 | STD-014;STD-103;STD-123;STD-157 | |
| L-02 | Peak or energy: which one sizes what? | LOAD-021;LOAD-022;LOAD-018;LOAD-023;LOAD-001;LOAD-002 | Willis 2004 | STD-014;STD-113;STD-123;STD-157 | |
| L-03 | What does load factor tell me about a site? | LOAD-005;LOAD-006;LOAD-007;LOAD-002;ROT-LOAD-03;ROT-LOAD-01;ROT-LOAD-05 | Gönen 2014;Willis 2004 | ||
| L-04 | We have several buildings. Can I just add up their peaks? | LOAD-010;LOAD-009;LOAD-008;ROT-LOAD-02;ROT-MG-13;MG-022 | Adibi 2000;Gönen 2014;Ihara & Schweppe 1981;Willis 2004 | STD-060 | |
| L-05 | Should we back up the whole building or just the critical loads? | LOAD-021;LOAD-022;ROT-LOAD-09;ROT-LOAD-11;ROT-CTRL-19 | STD-014 | ||
| L-06 | Why do motors matter so much when the building runs on backup power? | LOAD-014;LOAD-015;LOAD-016;LOAD-017;LOAD-019;LOAD-023;ROT-LOAD-06;ROT-LOAD-07;ROT-LOAD-10 | STD-060;STD-157 | ||
| L-07 | How much load growth should we allow for? | ROT-LOAD-12;ROT-LOAD-13;LOAD-024;LOAD-025;LOAD-027;ROT-LOAD-15 | Hong & Fan 2016;Hyndman & Athanasopoulos 2021;Mai et al. 2018 | STD-014 | |
| L-08 | What does electric vehicle charging add to the load? | LOAD-037;LOAD-029;LOAD-036;LOAD-010;ROT-LOAD-20;ROT-LOAD-17 | Gönen 2014;Mai et al. 2018;NREL 2023;Willis 2004 | STD-060;STD-116;STD-117 | |
| L-09 | How much load can we turn down instead of buying more battery? | LOAD-040;ROT-LOAD-21;LOAD-032;LOAD-033;ROT-LOAD-18;ROT-LOAD-19 | Braun 2003;Coughlin et al. 2008;Xu et al. 2004 | ||
| S-01 | How many kWh a year will each kW of solar make? | PV-001;PV-002;PV-003;PV-004;ROT-PV-01 | Dierauf et al. 2013;Dobos 2014;Duffie & Beckman 2013;Marion et al. 2005;Sengupta et al. 2018 | STD-099 | |
| S-02 | How much roof or land does solar need? | PV-013;ROT-PV-07;ROT-SYS-03;SYS-003 | Bolinger & Bolinger 2022;Ong et al. 2013 | STD-085 | S38 |
| S-03 | Why is the solar array bigger than the inverter (DC/AC ratio)? | ROT-PV-04;ROT-PV-05;PV-009;PV-010;PV-011;PCS-029 | Dobos 2014;NREL 2017 | STD-001;STD-060;STD-075 | |
| S-04 | How much energy is lost between the panels and the inverter output? | PV-004;ROT-PV-01;PV-001;ROT-PV-05 | Dierauf et al. 2013;Dobos 2014;Duffie & Beckman 2013;Marion et al. 2005 | STD-099 | |
| S-05 | How fast does solar output fade with age? | PV-012;ROT-PV-06 | Jordan & Kurtz 2013;Jordan et al. 2022 | ||
| S-06 | Why won't solar alone keep the lights on in an outage? | ROT-MG-04;ROT-WND-05;PV-014;ROT-PV-08;ROT-PV-04;CTRL-035;ROT-MG-16;MG-027 | Sengupta et al. 2018;Wilcox & Marion 2008 | STD-014 | |
| S-07 | What do hot and cold weather do to solar output? | PV-005;PV-006;ROT-PV-02;PV-007;PV-008;ROT-PV-03 | Faiman 2008;King et al. 2004 | STD-060;STD-190 | |
| S-08 | What does a bad week of sun look like for an island? | PV-014;ROT-PV-08;PV-001;MG-027;MG-036 | Dobos 2014;Duffie & Beckman 2013;Sengupta et al. 2018;Wilcox & Marion 2008 | STD-014 | |
| S-09 | Is wind or small hydro worth a look? | ROT-WND-01;ROT-WND-02;ROT-WND-03;ROT-WND-04;ROT-WND-05;WND-001;WND-006;WND-008;WND-009;WND-010 | Burton et al. 2011;ESHA 2004;Manwell et al. 2009;PNNL 2023;Paish 2002 | STD-097;STD-181;STD-191 | |
| G-01 | How big a generator do I need? | GEN-011;GEN-002;GEN-001;GEN-010;ROT-MG-19;ROT-GEN-01;ROT-GEN-03;LOAD-021 | STD-014;STD-112 | ||
| G-02 | How much fuel does a diesel generator burn per kWh and per day? | GEN-003;GEN-006;GEN-004;GEN-005;ROT-GEN-04 | EPA CHP 2017;Lambert et al. 2006 | ||
| G-03 | How lightly loaded can a diesel generator run? | GEN-007;ROT-GEN-05;ROT-MG-19;ROT-MG-16;GEN-010 | Cummins T-030 | ||
| G-04 | How big a load can a generator pick up in one step? | GEN-008;GEN-009;ROT-GEN-06;ROT-LOAD-11;GEN-004;LOAD-018 | EPA CHP 2017 | STD-014;STD-063;STD-113 | |
| G-05 | Standby, prime or continuous rating: which one do I need? | ROT-GEN-01;GEN-001;GEN-006 | STD-112 | ||
| G-06 | How many days will my fuel tank last? | MG-026;GEN-012;GEN-003;ROT-MG-20;ROT-MG-21 | Lambert et al. 2006 | STD-063;STD-067;STD-112 | |
| G-07 | Diesel or natural gas generator? | ROT-GEN-06;ROT-GEN-03;ROT-MG-21;GEN-004;GEN-012;CHP-005 | EPA CHP 2017 | STD-063;STD-067 | |
| G-08 | Combined heat and power, microturbines and fuel cells: are they worth a look? | CHP-001;CHP-002;CHP-003;CHP-005;ROT-CHP-01;ROT-CHP-02;ROT-CHP-03;CHP-009 | 18 CFR 292.205;DOE HFTO 2022;EPA CHP 2017;Larminie & Dicks 2003;NIST WebBook | ||
| B-01 | How big a battery do I need to ride through an outage? | ESS-027;ESS-028;ESS-029;ESS-030;ESS-026;ROT-ESS-16;ROT-ESS-08;ROT-ESS-10;ROT-ESS-28 | Sandia 2015 | STD-008;STD-009;STD-014 | |
| B-02 | How big a battery do I need to shave my demand peak? | ESS-033;ESS-034;ESS-028;ESS-037;ROT-ESS-15;ROT-ESS-18 | Sandia 2015 | STD-008 | |
| B-03 | Why does a 1 MWh battery not deliver 1 MWh? | ESS-029;ESS-026;ESS-031;ROT-ESS-08;ROT-ESS-16;ROT-ESS-10;ROT-ESS-28;ROT-ESS-20 | Sandia 2015 | STD-008;STD-009;STD-091 | |
| B-04 | Which battery duration fits which job? | ROT-ESS-15;ROT-ESS-04;ESS-031;ESS-007;ESS-033;ESS-036;ESS-043 | Sandia 2015 | STD-001;STD-008;STD-009;STD-012;STD-014;STD-091 | |
| B-05 | How many cycles and years will the battery last? | ROT-ESS-10;ESS-042;ESS-018;ESS-019;ESS-021;ROT-ESS-11 | Linden's Handbook 2011;Naumann et al. 2018;Naumann et al. 2020;Sandia 2015;Schmalstieg et al. 2014;Smith et al. 2017;Xu et al. 2018 | STD-008 | |
| B-06 | LFP or NMC — what is the difference? | ROT-ESS-08;ROT-ESS-10;ROT-ESS-11;ROT-ESS-12;ROT-ESS-03;ESS-002;ESS-019 | Linden's Handbook 2011;Naumann et al. 2018;Naumann et al. 2020;PNNL 2022;Schmalstieg et al. 2014;Smith et al. 2017 | ||
| B-07 | What do heat and cold do to a battery? | ROT-ESS-09;ESS-020;ROT-ESS-12;ROT-ESS-11;ESS-026;ESS-022 | Naumann et al. 2018;Sandia 2015;Schmalstieg et al. 2014;Waldmann et al. 2014 | STD-008;STD-076;STD-092 | |
| B-08 | How fast can the battery recharge after it is used? | ESS-037;ROT-ESS-19;ROT-ESS-12;ESS-038;ESS-007;ROT-ESS-20 | STD-008;STD-014;STD-091 | ||
| B-09 | What is augmentation, and should I plan for it? | ROT-ESS-21;ROT-ECON-07;ESS-040;ESS-041;ROT-ESS-10 | PNNL 2020 | STD-008 | |
| B-10 | How much power does the battery use itself? | ROT-ESS-28;ROT-ECON-06;ESS-039;ESS-049;ESS-027 | NREL ATB 2024;PNNL 2020 | STD-008;STD-009;STD-014 | |
| B-11 | What does the battery management system actually do? | ESS-044;ESS-014;ESS-046;ESS-047;ROT-ESS-02;ROT-ESS-07;ROT-ESS-23 | Plett 2015 | STD-008;STD-072;STD-076;STD-089;STD-092;STD-186 | |
| B-12 | Sodium-ion or flow batteries: are they worth a look? | ROT-ESS-03;ESS-002;ROT-ESS-12;ROT-ESS-08;ROT-COM-13 | Linden's Handbook 2011;PNNL 2022 | ||
| B-13 | What state of charge window should I plan around? | ROT-ESS-08;ESS-017;ESS-043;ESS-026;ROT-ESS-02;ROT-ESS-11;ROT-ESS-22 | Sandia 2015 | STD-008;STD-012;STD-014 | |
| B-14 | How much heat does a battery make? | ROT-ESS-27;ESS-023;ESS-048;ROT-ESS-13;ESS-049 | Bernardi et al. 1985;Plett 2015 | STD-008;STD-072 | |
| B-15 | What makes a new battery technology bankable? | ROT-ECON-19;ECON-033;ROT-ECON-23;ECON-041;STD-005;STD-008;ROT-STD-06;ROT-STD-07 | PNNL & Sandia 2016;Yescombe 2014 | STD-008;STD-065;STD-072;STD-073 | S1;S3;S4;S6 |
| B-16 | Sodium-ion chemistries: which is which, and how close are they? | ROT-ESS-03;ESS-003;ESS-002;ROT-STD-06 | Linden's Handbook 2011;PNNL 2022 | STD-060;STD-072;STD-076 | S11;S13;S14;S15;S19;S20;S25;S9 |
| B-17 | Beyond lithium and sodium: which long-duration technologies are getting close? | ESS-002;ESS-008;ESS-039;STD-005 | Linden's Handbook 2011;NREL ATB 2024;PNNL 2020;PNNL 2022 | STD-009;STD-065;STD-072;STD-073 | S36;S37 |
| I-01 | How big an inverter do I need, and why is it rated in kVA instead of kW? | FUN-009;FUN-017;PCS-001;PCS-003;ROT-ESS-17;ROT-FUN-06;ROT-MG-02;ROT-PCS-01 | Glover et al. 2017;Grainger & Stevenson 1994;Kundur 1994 | STD-001;STD-003;STD-006;STD-060;STD-075;STD-130 | |
| I-02 | How efficient is an inverter? | PCS-006;PCS-007;PCS-014;PCS-027;ROT-PCS-03;ROT-COM-11 | Driesse et al. 2008;NREL 2017;Sandia 2004;Sandia 2007;Teodorescu et al. 2011 | STD-014;STD-188;STD-201 | |
| I-03 | Can the battery inverter start my motors when the grid is down? | PCS-024;PCS-010;LOAD-023;ROT-PCS-11;ROT-PCS-06;ROT-LOAD-10;ROT-MG-12 | STD-001;STD-157;STD-172 | ||
| I-04 | Grid-forming or grid-following: what is the difference? | PCS-022;PCS-023;PCS-026;ROT-PCS-06;ROT-PCS-10;ROT-PCS-13;ROT-PCS-14;ROT-SYS-22 | Kundur 1994;NERC 2017;UNIFI 2022 | STD-012;STD-019;STD-163 | |
| I-05 | AC-coupled or DC-coupled solar-plus-storage? | PCS-027;PCS-028;PCS-029;PCS-033;ROT-PCS-15;ROT-PCS-16;ROT-PCS-17;ROT-PCS-19;ROT-PV-04 | NREL 2017 | STD-014 | |
| I-06 | How much does a hot or high-altitude site cut the inverter's rating? | PCS-008;PCS-009;PCS-011;ROT-PCS-04;ROT-PCS-05 | STD-008;STD-075;STD-094 | ||
| I-07 | How much energy is lost going from solar to battery to the building? | PCS-027;PCS-028;PCS-033;ROT-PCS-15;ROT-PCS-16;ROT-ESS-20 | NREL 2017 | STD-014 | |
| I-08 | How much power does an inverter burn when it is not doing anything? | PCS-012;PCS-006;ROT-PCS-07;ROT-ESS-28 | Driesse et al. 2008;Sandia 2007 | STD-006;STD-188 | |
| M-01 | What happens the instant the grid fails, and how big a battery inverter catches it? | MG-012;MG-013;ROT-MG-08;MG-001;MG-002;ROT-MG-02 | STD-001;STD-006;STD-012;STD-014 | ||
| M-02 | How long do the lights blink when the grid goes down? | MG-010;MG-011;ROT-MG-06;ROT-MG-07 | ITI 2000 | STD-012;STD-013;STD-063;STD-105 | |
| M-03 | Can we promise the customer a "seamless" transfer? | ROT-MG-06;MG-010;MG-011;ROT-MG-07 | ITI 2000 | STD-012;STD-013;STD-063;STD-105 | |
| M-04 | How does the system restart from dark, and how much battery charge should be held back for it? | MG-018;MG-019;ROT-MG-11;ROT-MG-14;ESS-043;ROT-ESS-22 | Adibi 2000 | STD-012;STD-014 | |
| M-05 | How much solar can an island run on? | ROT-MG-16;ROT-MG-17;MG-028;MG-029;ROT-GEN-05;GEN-007 | Cummins T-030;Hunter & Elliot 1994;Lambert et al. 2006 | STD-012;STD-103 | |
| M-06 | How much reserve should an island hold back? | MG-030;MG-031;ROT-MG-18;ROT-GEN-07;CTRL-036;ROT-CTRL-18 | Kundur 1994;Marcos et al. 2011;Mills & Wiser 2010 | STD-001;STD-012;STD-104;STD-140;STD-246 | |
| M-07 | How do generators and batteries share the load without talking to each other? | CTRL-011;CTRL-012;CTRL-008;CTRL-010;CTRL-014;ROT-CTRL-05;ROT-CTRL-06;ROT-CTRL-07;ROT-CTRL-08 | Guerrero et al. 2011;Kundur 1994;Olivares et al. 2014;Rocabert et al. 2012 | STD-012;STD-105 | |
| M-08 | What happens if the controller or communications fail? | CTRL-006;ROT-CTRL-04;ROT-CTRL-03;ROT-CTRL-13;CTRL-005;CTRL-026 | STD-010;STD-012;STD-013;STD-095;STD-132;STD-137 | ||
| M-09 | In what order do loads come back after a blackout? | MG-024;MG-021;MG-022;MG-023;ROT-MG-15;ROT-MG-12;ROT-MG-13;ROT-MG-14;ROT-CTRL-19;CTRL-038 | Adibi 2000;Ihara & Schweppe 1981;Kundur 1994 | STD-012;STD-048;STD-063;STD-113 | |
| P-01 | Can we reuse the grid protection settings when the site is islanded? | PROT-015;PROT-016;PROT-017;PROT-021;PROT-022;ROT-PROT-06;ROT-PROT-07;ROT-PROT-11 | Blackburn & Domin 2014;NERC 2018 | STD-001;STD-012;STD-017;STD-050;STD-105 | |
| P-02 | Why does everyone keep asking about fault current, and where does it come from? | PROT-002;PROT-009;PROT-011;PROT-012;PROT-014;PROT-015;ROT-PROT-02;ROT-PROT-03;ROT-PROT-05;ROT-ESS-24 | Glover et al. 2017;Grainger & Stevenson 1994;Kundur 1994;NERC 2018 | STD-001;STD-017;STD-030;STD-072;STD-156;STD-187 | |
| P-03 | What happens to grounding when the grid is gone, and does the transfer switch need to switch the neutral? | PROT-025;PROT-028;PROT-030;ROT-PROT-12;ROT-PROT-15;ROT-ESS-25 | Blackburn & Domin 2014 | STD-001;STD-002;STD-148;STD-153;STD-158 | |
| P-04 | What is arc flash, and why can an island be more dangerous than the grid? | PROT-040;PROT-041;PROT-042;PROT-044;ROT-PROT-21 | STD-021;STD-022;STD-031;STD-037;STD-050;STD-061 | ||
| P-05 | The vendor says the battery is UL certified. What does that actually prove? | STD-005;STD-008;ROT-STD-05;ROT-STD-06;ROT-STD-08 | STD-065;STD-072;STD-073 | ||
| P-06 | What does the fire code actually care about for a battery? | ESS-050;ESS-051;STD-006;STD-007;ROT-ESS-29 | STD-065;STD-070;STD-073;STD-211;STD-212 | ||
| P-07 | Who has to sign off before the system is safe to run? | STD-007;STD-008;ROT-STD-07;ROT-PROT-05 | STD-065 | ||
| Y-01 | How much room does a battery need per megawatt-hour? | SYS-005;ROT-SYS-05;ESS-051 | PNNL 2022 | STD-065;STD-070;STD-073 | |
| Y-02 | How heavy is a battery container, and can my roof, slab or soil carry it? | SYS-006;ROT-SYS-06;SYS-040 | STD-071 | ||
| Y-03 | How much clearance and access does the battery need around it? | ESS-051;STD-006;STD-007;SYS-005;ROT-SYS-05 | PNNL 2022 | STD-065;STD-070;STD-073 | |
| Y-04 | How loud will it be at the property line? | SYS-039;ROT-SYS-24 | STD-221 | ||
| Y-05 | What site problems should I check first, before anyone sizes anything? | SYS-007;SYS-005;SYS-006;SYS-039;ROT-SYS-07 | DOE 2022;PNNL 2022 | STD-014;STD-065;STD-070;STD-071;STD-221 | |
| Y-06 | Besides the batteries, what does the yard need: pad, cable runs and its own power feed? | SYS-002;ROT-SYS-02;ESS-049;ROT-ESS-28 | STD-008 | ||
| C-01 | What does an installed battery system cost, and what drives the price? | ECON-001;ECON-003;ECON-010;ROT-ECON-03;ROT-ECON-04;ROT-ECON-09;ROT-ECON-02 | NREL ATB 2024;PNNL 2022;Ramasamy et al. 2023 | ||
| C-02 | Why does a longer-duration battery cost less per kWh but more per kW? | ECON-002;ROT-ECON-01;ECON-001 | Cole & Ramasamy 2023;NREL ATB 2024;PNNL 2022;Ramasamy et al. 2023 | ||
| C-03 | What does a battery system cost to run each year? | ECON-004;ROT-ECON-05;ROT-ECON-06;ECON-011;ROT-ESS-28 | EIA 2024;NIST HB 135;NREL ATB 2024;PNNL 2022;Short et al. 1995 | STD-065;STD-073 | |
| C-04 | What do demand-charge savings look like, and when are they worth chasing? | ECON-012;ECON-014;ECON-016;ROT-ECON-10;ROT-ECON-11;ROT-ECON-12;ROT-ECON-13 | NREL 2017;Sandia 2015 | ||
| C-05 | What is time-of-use shifting worth? | ECON-017;ECON-018;ROT-ECON-14;ECON-041 | PNNL & Sandia 2016;RMI 2015;Sandia 2015 | STD-008 | |
| C-06 | Payback, NPV and IRR: what do they each tell me? | ECON-022;ECON-023;ECON-024;ECON-025;ECON-036;ECON-040;ROT-ECON-16;ROT-ECON-17 | Brealey et al. 2020;Fisher 1930;IRA 2022;NIST HB 135;PL 119-21;Short et al. 1995 | ||
| C-07 | What does levelized cost of storage mean, and when is a quoted figure meaningful? | ECON-029;ECON-030;ECON-031;ECON-008;ROT-ECON-18 | Jülch 2016;Lazard 2024;Schmidt et al. 2019;Short et al. 1995 | ||
| C-08 | Which savings can one battery stack, and which collide? | ECON-021;ROT-ECON-15;ECON-041;ROT-ECON-23 | PNNL & Sandia 2016;RMI 2015;Sandia 2015 | STD-008 | |
| C-09 | What does a battery warranty really promise? | ECON-041;ECON-042;ECON-043;ROT-ECON-23;ROT-ECON-24 | PNNL & Sandia 2016 | STD-008;STD-091 | |
| C-10 | What kills the economics of a battery project? | ECON-022;ECON-035;ROT-ECON-20;ROT-ECON-22;ROT-ECON-12;ROT-ECON-13 | Brealey et al. 2020;NIST HB 135;Short et al. 1995 | ||
| C-11 | What does it cost to augment or replace a battery over its life? | ECON-005;ECON-006;ECON-007;ROT-ECON-07;ROT-ECON-08;ROT-ESS-21 | Cole & Ramasamy 2023;NIST HB 135;NREL ATB 2024;Short et al. 1995 | STD-065;STD-174;STD-242 | |
| X-01 | How does interconnection work, and how long does it take? | SYS-032;ROT-SYS-21;ROT-SYS-07;ROT-STD-13;ROT-STD-11;STD-012 | CA Rule 21;NY SIR;Rule 14H | STD-001;STD-003;STD-006;STD-060 | |
| X-02 | Can we export to the grid, and which screens will the utility run? | SYS-032;SYS-033;SYS-034;SYS-035;ROT-SYS-21;ROT-SYS-22 | CA Rule 21;FERC Order 2006;FERC Order 792;NREL 2012 | STD-001;STD-004;STD-006;STD-048;STD-060 | |
| X-03 | Which standard is which: UL 9540, UL 9540A, UL 1741, IEEE 1547, NFPA 855 and the electrical code? | ROT-STD-01;ROT-STD-05;ROT-STD-06;STD-005;STD-009;ROT-STD-09 | STD-001;STD-003;STD-006;STD-065;STD-072;STD-073;STD-075 | ||
| X-04 | What permits do we need, who approves them, and how long does it take? | STD-002;ROT-STD-02;ROT-STD-03;ROT-STD-13;ROT-STD-01;STD-003 | 40 CFR 60 IIII;40 CFR 60 JJJJ;40 CFR 63 ZZZZ | STD-060;STD-071 | |
| X-05 | What usually sets the schedule, and how long do long-lead items take? | ROT-COM-06;ROT-SYS-07;ROT-COM-02;ROT-STD-10;ROT-STD-11;ROT-STD-06;COM-003 | STD-008 | ||
| X-06 | What documents does the project owe, and to whom? | STD-013;STD-008;STD-014;ROT-STD-04;ROT-STD-07;ROT-STD-12;ROT-SYS-23 | STD-022;STD-062;STD-065;STD-070 | ||
| X-07 | Which studies happen when? | ROT-SYS-22;ROT-SYS-21;ROT-SYS-23;STD-007;STD-006;ROT-STD-15;SYS-037 | IREC 2017;NREL 2012 | STD-004;STD-065;STD-070;STD-073 | |
| Q-01 | What gets tested before the system is handed over? | COM-007;COM-009;COM-010;ROT-COM-09;ROT-COM-07;ROT-COM-12;ROT-STD-11 | STD-003;STD-012;STD-013;STD-023;STD-113 | ||
| Q-02 | How is round-trip efficiency measured, and why does the meter location change the answer? | COM-014;COM-012;COM-015;ROT-COM-13;ROT-COM-14;ROT-COM-11;ROT-ESS-20 | JCGM 100:2008;PNNL & Sandia 2016;PNNL 2020 | STD-009;STD-091;STD-123;STD-144 | |
| Q-03 | How is availability measured? | COM-017;ROT-ECON-24;COM-025;ROT-COM-19;ROT-SYS-14 | STD-008;STD-051;STD-052 | ||
| Q-04 | How is battery capacity tracked over its life? | COM-018;ROT-COM-16;ROT-COM-10;ROT-COM-14;COM-030;ROT-COM-23 | PNNL & Sandia 2016 | STD-008;STD-009;STD-091 | |
| Q-05 | What does routine maintenance look like? | ROT-COM-18;ROT-COM-22;ROT-COM-20;ROT-COM-19;COM-024;COM-028;COM-026 | ASHRAE Handbook—Fundamentals;Barlow & Proschan 1965;Moubray 1997 | STD-051;STD-052 | |
| Q-06 | What usually goes wrong first? | ROT-COM-21;ROT-COM-17;ROT-COM-22;ROT-COM-18;COM-019;COM-029 | STD-008 | ||
| N-01 | What does a 500 kW / 2 MWh battery really do for an office's demand bill? | EX-A-01;EX-A-02;EX-A-03;EX-A-07;EX-A-08;EX-A-09 | NREL 2017 | STD-001;STD-008 | |
| N-02 | What can solar and a battery add to a hospital that already has backup generators? | EX-B-01;EX-B-02;EX-B-04;EX-B-05;EX-B-06;EX-B-10;EX-B-11 | ITI 2000 | STD-060;STD-063;STD-072;STD-112;STD-209 | |
| N-03 | Does solar plus a battery beat diesel alone for an off-grid community? | EX-C-01;EX-C-03;EX-C-04;EX-C-05;EX-C-08;EX-C-09;EX-C-10;EX-C-12;EX-C-13 | |||
| N-04 | Is a battery worth it for a factory that already runs combined heat and power (CHP)? | EX-D-01;EX-D-02;EX-D-03;EX-D-04;EX-D-07;EX-D-08;EX-D-10 | STD-012;STD-021;STD-022;STD-050;STD-061;STD-133;STD-157 | ||
| N-05 | What does it take for a 5 MW / 20 MWh grid battery to keep its promise for 20 years? | EX-E-01;EX-E-02;EX-E-03;EX-E-05;EX-E-06;EX-E-10;EX-E-11;EX-E-12 | Cole & Ramasamy 2023;Lazard 2024;NREL ATB 2024;PNNL & Sandia 2016;PNNL 2022;Schmidt et al. 2019 | STD-001;STD-008;STD-009;STD-075;STD-091 | |
| N-06 | Should a data center use its batteries for demand response? | EX-F-01;EX-F-02;EX-F-03;EX-F-06;EX-F-10;EX-F-12 | STD-051;STD-112 | ||
| T-01 | What should I ask on the first call, based on what the customer wants? | SYS-001;ROT-SYS-01;ROT-SYS-03;ROT-ECON-10;ROT-ECON-13;ROT-MG-06;ECON-012 | NREL 2017;Sandia 2015 | STD-014;STD-103 | |
| T-02 | What red flags mean I should slow down before quoting? | SYS-007;ROT-SYS-06;ROT-SYS-07;ROT-SYS-08;ROT-ECON-11;ROT-ECON-12;ROT-ECON-22;ROT-MG-06;ECON-014;ECON-020 | DOE 2022;NLR URDB;NREL 2017 | STD-014 | |
| T-03 | What should I never promise, and what do I say instead? | MG-010;MG-011;EX-A-01;EX-A-07;ROT-ECON-12;ROT-ECON-15;ECON-041;ECON-042;ECON-043;ROT-PROT-06 | ITI 2000;NREL 2017;PNNL & Sandia 2016 | STD-008;STD-012;STD-013;STD-063;STD-091;STD-105 | |
| T-04 | Who do I bring in, and which study answers which question? | SYS-001;MG-010;PROT-017;PROT-022;ROT-PROT-11;ROT-SYS-07;ECON-022 | Blackburn & Domin 2014;Brealey et al. 2020;ITI 2000;NIST HB 135;Short et al. 1995 | STD-012;STD-013;STD-014;STD-017;STD-050;STD-063;STD-103;STD-105 |